A wood veneer hinged door looks finished the moment it is hung, so most of the work that decides how well it ages happens before a single panel reaches site. When the doors are made to measure for a villa or apartment package, the installation plan is the document that carries every decision — sizes, finishes, ironmongery, opening direction and sequence — from the drawing sheet to the wall. Below is what we ask project teams to settle in that plan for Santerson Wood Veneer Hinged Doors, and what to check before the doors arrive.
1. Door schedule: one line for every opening
Start with a schedule, not with a floor plan. Each opening gets its own row, and each row answers the same set of questions. A door that is 15 mm narrow in one bedroom and reversed in another is far cheaper to fix on paper than on site.
| Field | What it settles |
|---|---|
| Opening reference | The room or drawing number the door belongs to, so nothing gets delivered to the wrong level. |
| Clear opening and leaf size | Width, height and wall thickness as measured on site, not as drawn at tender stage. |
| Veneer species and grain direction | The face specified for the project, and whether the grain runs vertically or horizontally across paired leaves. |
| Finish | Sheen level and edge treatment, matched to the wood veneer panels and veneered joinery in the same space. |
| Hinge hand and swing | Which side the leaves hang on and which way they open, checked against furniture layouts and circulation. |
| Ironmongery set | Hinges, lock body, handle, keep, door closer and any hold-open device, listed as a complete set per opening. |
| Threshold and floor finish level | The finished floor level on both sides, which sets the undercut and the gap under the leaf. |
| Quantity and delivery batch | How many leaves go to each phase, so doors are not stored on site for months before hanging. |
2. Site conditions that must be resolved before the doors are made
Made-to-measure doors lock in a set of dimensions, so the surrounding work has to be settled first. Where these items are still open, the schedule should say so rather than guess.
- Finished floor levels. Screed, tile, and flooring thickness change the undercut. Confirm the build-up on both sides of the opening before the leaf height is fixed.
- Wall make-up and reveal depth. Blockwork, studwork and plaster each give a different wall thickness for the frame. The wall must also be plumb and square, or the frame will be scribed on site.
- Wet trades completed. Plaster, paint and flooring should be finished, or at least their levels fixed, so veneered leaves are not installed into a wet, dusty environment.
- Storage and handling route. Veneered leaves need a dry, flat staging area and a route wide enough for the largest leaf, including the lift or stair it has to travel.
- Service coordination. Door closers, acoustic seals, electrified hardware and any access-control device must appear on the same drawings as the door schedule.
3. Hardware and interface details
Veneer is a face material, so hardware decisions are visible decisions. Hinge positions, handle height and lock cases all cut through the face, which makes them hard to correct later.
- Hinge type and load rating. Match the hinge grade to the leaf weight and expected use; specify how many hinges per leaf rather than leaving it to the fitter.
- Handle height and backset. Keep one dimension across the whole project, and check it against the lock body you have specified.
- Concealed versus surface ironmongery. Concealed hinges and pivot shoes must be routed into the leaf and frame at manufacture, so this choice belongs in the schedule, not on site.
- Frame detail. Decide whether the architrave is square-set or shadow-gap, and how the frame meets the flush hinged door lines elsewhere in the same build.
- Related door types in the same opening family. Where an opening needs a sliding or folding solution instead, note it now — wood veneer pocket doors and wood veneer folding doors need wall cavity and track provisions that a hinged schedule will not carry.
4. Sequencing, delivery and the installation window
Hanging veneered doors late protects the faces but risks clashes with finishes; hanging them early exposes them to traffic. A workable plan states the sequence explicitly.
- Confirm on-site re-measure of every opening against the schedule, and record any deviation before production starts.
- Produce leaves, frames and ironmongery as one package per phase, with the opening reference marked on each item.
- Ship and deliver to a defined, dry storage point, with the delivery batch matched to the installation programme.
- Hang frames first after wet trades and floor finishes are complete; protect the frames and check alignment before the leaves go on.
- Hang leaves, adjust for even gaps, fit ironmongery, then hang protective covering on the completed faces.
- Walk the schedule line by line as a snag list: operation, gap consistency, finish condition, and hardware function at each opening.
5. What we need from you to price and produce the schedule
A complete enquiry saves a round of drawings. Send the door schedule with opening references and quantities, on-site dimensions including wall thickness, the veneer species and finish you are matching to, and the ironmongery list. Where an opening is still unresolved, mark it as provisional rather than leaving it blank; we will confirm the dimension before production.
Because these doors are made to measure for each project, dimensions, veneer species, finish and hardware are all confirmed with you before manufacture — the schedule is what makes that confirmation meaningful. If your project also needs matching veneered joinery or wall panelling, putting doors, veneer panels and cabinetry on one schedule keeps grain, tone and edge detailing consistent across the build. Send your door schedule through our contact page and we will return a quotation with the specification points that still need your sign-off.