A high gloss sliding door wardrobe looks simple on a rendering: two or three mirror-smooth panels gliding across a bedroom wall. On site it is one of the least forgiving items in a joinery package. Panel widths, track lengths, wall alignment and clearance all have to agree before production starts, and a single late dimension change can hold up cabinetry, flooring and painting in the same room. This guide covers how buyers, builders and project managers count the pieces, group related products and coordinate the order so a high gloss sliding door wardrobe package arrives complete and fits on the first visit.

Start with openings, not with wardrobe counts

Sliding wardrobes are made to measure, so a room quantity is never one number. For each opening record the finished width and finished height at three points across the span — left, centre, right — plus the depth available from finished wall to finished wall. Slab walls in new builds and older renovated villas rarely hold square, and the difference between the smallest and largest reading tells you whether the carcass needs scribing or whether the builder has to true up the wall first.

Then note what sits inside the room's critical dimensions: skirting that continues behind the unit, a ceiling cornice, an air-conditioning grille, a light switch on the return wall, or a door swing that crosses the front of the wardrobe. These are the items that quietly reduce a 2,400 mm opening to something workable at 2,300 mm.

  • Finished width and height, measured at three points per opening
  • Net depth at the top, middle and bottom of the opening
  • Floor level across the run — a sliding track needs a consistent datum
  • Position of switches, outlets, grilles and door swings relative to the opening
  • Whether wall finishes are complete or still to be tiled, plastered or painted

Turn openings into a panel and set-out schedule

Once the dimensions are in, list each wardrobe as an item with its own reference: unit number, room, opening size, number of door panels, internal layout type and finish. A three-room villa bedroom floor commonly ends up with four to eight separate wardrobe items, and each one carries several sub-items — carcass panels, doors, tracks, hanging rails, drawers, shelves, integrated lighting if specified.

Keep the schedule at item level rather than lumping everything under "wardrobes, 6 off". When a variation happens on site — a bedroom swapped from sliding to hinged doors, one wardrobe shortened to make room for a sideboard — you revise one line instead of re-pricing the whole package. It also makes partial shipment practical: the units in finished rooms can be produced and delivered while another room's wall works are still open.

Item fieldWhy it matters for coordination
Unit reference and roomTies the wardrobe to a drawing sheet, so site teams and the factory read the same item number
Opening size, finishedFixes door panel widths and track length; any change ripples into flooring and cornice details
Door count and configurationTwo-panel, three-panel and bypass layouts need different clearances and hardware sets
Internal layoutHanging, drawer-focused or shelf-focused interiors change panel cuts and hardware quantities
Finish codeHigh gloss panels are batched by colour and sheen; mixing codes in one order invites shade variation
StatusReleased, awaiting site confirmation, on hold — prevents production starting on an unconfirmed opening

Count quantities the way the panels are actually built

Panel count is where most quantity errors begin. A sliding wardrobe of a given opening width can be built with different numbers of door panels, and more panels is not automatically better: each panel needs an overlap zone and a track segment, and very wide single panels are awkward to handle through a site lift or a stairwell. Confirm the panel split before you count anything else.

For each unit, count in four groups so nothing is missed at delivery:

  • Carcass and structure — side panels, top and bottom panels, back panels, scribing strips, adjustable feet or plinths
  • Door sets — door panels in the confirmed finish, frame sections if the design uses a framed door, handles or integrated pull profiles
  • Running gear — upper and lower tracks, hangers, rollers, bottom guides, door stops, bumpers, anti-jump fittings
  • Internal fit-out — hanging rails, rail brackets, shelves and shelf pins, drawer boxes and slides, trouser or shoe provisions, interior lighting if specified

Order running gear and internal fittings as complete sets per unit, not as loose bulk totals. A shipment that arrives with 14 door panels and only 12 sets of rollers cannot be installed, and the shortfall surfaces on the installation date rather than in the warehouse. Spares are worth specifying for wear items — rollers, guides, stops and bumpers — because these are the parts a project's maintenance team may need years later.

Coordinate finishes with the rest of the joinery package

High gloss reads as one finish but is specified through several panel systems, and the sheen has to match across items in the same sightline. Where a bedroom wardrobe faces or adjoins a media wall, a sideboard or kitchen cabinetry, order those items against one finish reference and ask for the same batch. A high gloss lacquer wardrobe sitting next to high gloss kitchen fronts in a different batch is a visible mismatch, and on glossy surfaces it is more obvious than on matte ones.

Coordinate the surrounding trades too. Sliding tracks are fixed to floor and ceiling finishes, so the level and set-out must be agreed before tiling or screeding; wall paneling that returns into the wardrobe reveal should be scheduled with the same drawing revision as the carcass. If the design also uses wall panel systems in the bedroom, put them on the same release schedule so the reveal widths are cut once and consistently.

Decide early which rooms keep sliding doors and which take hinged or walk-in layouts. Corner rooms and shallow alcoves often work better as a sliding door corner wardrobe with an angled internal bay than as a straight run with a wasted return. Locking that decision before the schedule is released avoids re-cutting panels after production starts.

Sequence the order around site milestones

Split the package into release groups that follow the building programme rather than releasing everything at once. Group one: units in rooms whose finishes are complete and confirmed. Group two: units waiting on wall or floor works. Group three: any item still under design review. This keeps production moving while protecting you from manufacturing against dimensions that will change.

For projects sourcing from a one-stop furniture and building materials supplier, the same grouping logic applies across trades. Wardrobes, cabinetry, doors, wall panels and flooring can be consolidated into one procurement package with staged releases, which cuts the number of separate shipments, customs files and delivery appointments to manage on site. Confirm at quotation stage which items are made-to-measure and therefore locked after release, and which are standard items that can be topped up later.

Before you release an order, check five things: every opening dimension is signed off against the latest drawing revision; the finish code is written on the schedule, not implied by a picture; panel counts and track lengths match the confirmed configuration; hardware and internal fittings are listed as complete sets per unit; and each item carries a release group tied to a site date.

Common quantity errors and how to avoid them

  • Measuring structural rather than finished dimensions — the wardrobe must fit after plaster, tile or paneling, so measure off the finish line and state the tolerance you expect.
  • Counting wardrobes instead of door sets — one unit can need two or three door sets with different track segments; count at set level.
  • Leaving hardware to the installer — tracks, rollers and guides sized for a specific panel weight and height should come with the panels, not be sourced locally on installation day.
  • Mixing finish batches across rooms in one sightline — specify one finish reference and one batch per visual group.
  • No spares line for wear parts — add a spare set of rollers, guides and stops per unit type when the order is placed.

Wrapping up

A high gloss sliding door wardrobe package behaves like any other made-to-measure joinery: it is only as accurate as the dimension sheet behind it and only as complete as its hardware schedule. Measure finished openings at three points, break the package into item-level units with their own status, count panels and running gear as sets, hold one finish reference across every glossy surface in a sightline, and release production in groups that follow the site programme. Do that and the installation visits are short, snags are minor, and the reflective fronts do what they are specified to do — read as one clean wall surface.

SANTERSON supplies made-to-measure sliding door wardrobes together with cabinetry, doors, wall panels and interior fixtures for villa, hospitality and office projects, with custom/OEM production, consolidated shipping and installation support. Send your opening schedule and finish references to discuss quantities and configuration for a specific project.