A wall unit that carries both books and a television has to be built to the room, not to a catalogue size. That is exactly what the Santerson Storage & Display Combo is set up to do: it sits inside our Media & TV Walls collection as a configurable combination of closed cabinets, open shelving and display space, with finish, layout and dimensions specified per project. For buyers working with a factory in China rather than a local joinery shop, the difference between a unit that fits and a unit that arrives wrong usually comes down to how well the order was specified before production started. The steps below are how we handle it.
What the storage and display combo actually is
This is a made-to-measure wall system, not a flat-pack module. It belongs to the same family as our Santerson Full Height Media Walls, Santerson Integrated TV Panels and Santerson Sliding Panel TV Systems. The combo version mixes enclosed storage with open display bays in one run, so the television, the media components, the crockery and the objects you want in view are all handled by a single design.
The same logic runs across our Santerson Mixed Open & Closed Storage and Santerson Open Display Niches in the Integrated Storage Walls collection, which is where most buyers land when they want display shelving that runs into a bedroom or hallway rather than a living-room media wall.
One thing worth being plain about: these listings are configurable systems. The product page does not publish one fixed set of dimensions, one board material or one hardware schedule, because the specification is agreed project by project. Anyone quoting you a single number off a catalogue image is guessing.
Step 1 — Send the wall, not just the room photo
Before we can price anything, we need measured drawings of the wall: overall width and height, floor-to-ceiling variation, skirting and cornice details, the position of power outlets, data points, downlights and any existing flues or beams. For a media wall this matters more than for a wardrobe, because the screen recess has to line up with socket positions that are already fixed on site.
Tell us what you intend to store, in real terms: number of records, depth of the books, height of the bottles, whether a soundbar sits on a shelf or is recessed, whether the console doors need to open past a sofa armrest. Open-to-closed ratio is the decision that changes the look most quickly, so decide it early and we will design around it.
Step 2 — Agree materials, finishes and hardware in writing
As a custom furniture and interior products manufacturer, we work from the finish schedule you approve rather than from a fixed range. Panels can be specified in melamine, lacquer, acrylic, wood veneer or laminates; handles can be integrated or omitted entirely for a handleless front. Where the wall sits near a bathroom or an outdoor area, say so at this stage — material choice changes, and our Santerson Outdoor Ready PVC Cabinets exist precisely for those damp locations.
Lighting is part of the design, not an afterthought. Integrated lighting for shelving and cabinet interiors is specified with the cabinetry so that drivers, transformers and cable routes are built into the carcass — see Santerson Integrated Cabinet Lighting and Santerson Integrated Lighting Systems. Retrofitting strip light into a shipped unit is the most common avoidable problem on these orders.
Confirm before production: panel and carcass material, board thickness, edge treatment, finish colour or veneer species and grain direction, door and drawer configuration, hinge and runner brand and type, handle or push-open detail, screen recess dimensions and ventilation, cable and grommet positions, lighting specification and driver location, and the packing breakdown for site.
Step 3 — Use prototyping and 3D before mass production
Our Custom & OEM Service covers bespoke furniture design and prototyping, 3D modelling, material and finish sampling, and brand customisation. For a media wall, the useful sequence is a 3D model of your elevation, then physical samples of the panel and veneer you have chosen, then a sign-off drawing with every dimension marked. Production starts only after that drawing comes back approved.
If you are an installer, designer or retailer ordering under your own label, minimum order quantities are set per project rather than by a fixed catalogue rule. Ask us for the MOQ that applies to your configuration.
Step 4 — Specify packing and freight for a fragile, oversized order
Wall systems travel badly when they are packed as one block. We break the run into modules sized to the container and to the doorway they will pass through on site, with protective edging on finished faces and a packing list that names every crate against its position on the drawing. Logistics & Door-to-Door Delivery covers sea, air and rail freight forwarding, customs documentation such as commercial invoices, packing lists and certificates of origin, container loading and shipment tracking through to the delivery address.
Step 5 — Installation, inspection and what happens afterwards
A made-to-measure wall is only as good as its fixing. Our Installation & After-sales Support covers on-site installation, inspection and snag lists, warranty coverage on the agreed terms, spare parts and replacement, and ongoing maintenance. For projects where you supply your own fitters, we provide assembly drawings and site guidance so the modules go up in the order the packing list intends.
Warranty terms, response times and what is excluded are set out per project. Read them with the specification sheet, not separately.
Working with an overseas factory on Australian projects
Australian buyers increasingly handle furniture sourcing for Australian projects directly with the manufacturer, and we have delivered villa work in Sydney, Melbourne, Perth, Willoughby and North Turramurra. The practical advantage is a single supplier across joinery, loose furniture, doors, lighting and finishes instead of six separate vendors pointing at each other when something does not match.
The discipline that makes it work is the same one described above: measured drawings from your site, an approved finish schedule, an approved sign-off drawing, and freight terms confirmed in writing before production. As a one-stop furniture and building materials supplier operating since 2008, we run that process as one workflow — design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover.
Questions buyers ask before ordering
Can the unit be built to a non-standard ceiling height?
Yes. Dimensions are specified per project, including scribe and filler details for floors and ceilings that are out of level. Send the survey.
Can I match an existing finish in my home or hotel?
Send a sample panel or a physical swatch. Veneer species, grain cut and lacquer sheen are matched against a reference; colour names alone are not reliable across materials.
Can the combo be extended into other rooms with the same language?
Yes, and most projects do exactly that. The same panel and hardware schedule carries through our modular living systems, from Santerson Floor to Ceiling Modular Systems to Santerson Floating Modular Systems, so bedroom and study joinery can be ordered in one batch.
What does a typical unit cost?
Price follows the specification: linear metres, material, hardware count, lighting and glazing. We quote from your drawing and finish schedule. Any firm number given before that stage is an estimate at best.