A mid-century whole-house cabinetry package looks effortless on site: wood-grain fronts in one warm tone, a bay window desk with drawers underneath, open shelving beside the staircase, deep metal drawer boxes in the kitchen. That calm result is decided long before the first panel arrives, in how delivery slots and installation access are planned around the joinery itself. Custom built-ins are measured to the millimetre against finished walls, so any delay or damaged crate on site moves the whole handover.
Below is the sequence we follow on projects such as our Mid-century Whole House Custom Cabinetry & Built-in Storage Project, and the practical decisions a buyer or site manager should lock down before production starts.
Why whole-house joinery is delivery-sensitive in a way loose furniture is not
Loose pieces can be unpacked, moved to a corner and fitted later. Built-in cabinetry cannot.
- Every unit is sized from an on-site survey of the actual room, so it has to go into the opening it was made for, in the order the design assumes.
- The work sits against plasterboard or masonry that has already been decorated. Flooring, paint and skirting normally finish before installation, which leaves a narrow window between decoration and handover.
- Cabinetry shares the site with other trades — electricians running appliance wiring, lighting installers working on integrated cabinet lighting, stone fixers for worktops. One trade slipping pushes the rest.
- Panels are large and often full height. Getting them through a front door, a stairwell or a lift lobby is a physical constraint, not a preference.
Planning delivery and installation around those constraints is cheaper than re-manufacturing a panel that arrived in the wrong sequence or was damaged on the way up.
Before production: agree the site conditions your package depends on
The design stage is where delivery planning actually begins. On a whole-house package, confirm these with your builder or site manager while drawings are still open:
- Final floor levels and finished wall faces. Cabinet heights and the scribe allowance on a full-height wardrobe depend on what the completed surface will be, not the current one.
- Appliance schedule. Built-in ovens, refrigerators and hobs set the cut-out dimensions in our kitchen cabinets. Fix the models before production, not at installation.
- Electrical and lighting points. Integrated cabinet lighting and any LED strip in display niches need wiring to be routed and tested before carcasses close the wall.
- Decoration sequence. Agree who paints and lays flooring where, and when, so joinery does not land on a wet or dusty surface.
- Access route for oversized panels. Measure door widths, stair turns and lift dimensions. Long side panels may need to be split into site-joined sections, which is far easier to decide at design stage than at the loading bay.
Our Interior Design Services cover space planning, 3D renderings and project design coordination — drawings, production coordination and on-site guidance — which is where these site conditions get written down and signed off rather than assumed.
Split the delivery into the sequence the installation needs
A whole-house package rarely lands in one crate drop. We group the order so that what goes in first arrives first, and the site is not turned into a warehouse:
| Consignment | Typical contents | Site condition needed on arrival |
|---|---|---|
| Kitchen carcasses and worktops | Cabinet boxes, deep metal drawer runs, stone or engineered-stone counter | Floors laid, appliance wiring tested, wall finishes complete |
| Bedroom and hallway built-ins | Full-height wardrobe fronts, integrated bay window cabinet, bed platform | Painted walls, skirting fitted, clear path from entry to room |
| Living and study joinery | Bay window desk with storage drawers, staircase bookshelves, vertical slat partition, sideboards | Staircase structure complete, lighting points live |
| Doors, panels and small parts | Barn and flush doors, decorative profiles, hinges, runners, handles or pull-free mechanisms | Can follow the main units; keep sealed until fitting |
If your site cannot store four consignments safely, tell us at quotation stage. We can hold production batches and release them to a schedule instead of shipping everything together.
Freight: how the goods reach your door
Our Furniture Logistics and Door-to-door Delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork such as commercial invoices, packing lists and certificates of origin, shipment tracking and delivery to site.
Three decisions shape the cost and the risk of damage:
- Consolidation versus separate shipments. Combining cabinetry with other materials from the same project — flooring, doors, sanitaryware, lighting — means one clearance event and one delivery window. Splitting by trade gives more control over timing.
- Packaging specification. Full-height panels travel on edge protectors and are crated for the access route agreed at design stage. Tell us if the last leg is a narrow residential street or an apartment lift.
- Incoterms and who clears customs. Decide early whether you or your agent handle import clearance, so the container does not sit demurrage-charged while paperwork is sorted.
Transit times, duties and delivery scope vary by port and consignment, so we confirm them for your specific order rather than quoting a generic figure.
Inspection on arrival: the 30-minute check that saves weeks
Do this with the carrier present, before crates leave the site:
- Count crates against the packing list and photograph every crate in its delivered condition.
- Open the corners of panel crates — damage on full-height sheets usually shows at the edge protector.
- Check drawer boxes, runners and hardware cartons separately; small parts are the easiest to lose and the slowest to replace from overseas.
- Note any damage on the delivery note before signing, with photos attached. An unsigned clean receipt makes a claim very difficult.
Send us the photographs and crate numbers the same day. Replacement panels can go into production immediately, and we schedule them to follow the main installation rather than stop it.
Installation planning: what to book with your builder
Our Furniture Installation and After-sales Support service includes on-site installation, inspection and snag resolution, spare parts and replacement, and ongoing maintenance. To make that visit efficient, the site should be ready in advance:
- A clear working window. Whole-house joinery fitting runs over consecutive days; stopping and restarting costs more than extending.
- Power, lighting and a staging area. Installers need electricity, adequate light and somewhere flat to lay out fronts and hardware without damaging them.
- Other trades off the wall. The wall being fitted must be free of painters and plasterers for the duration.
- A site contact who can make decisions. Scribe allowances, appliance reveals and door swings get resolved on the spot; a contact with authority prevents a two-week pause.
- Protection for finished surfaces. Floor covering, stair protection and a clear route from the delivery point.
For projects in Australia we work to the site programme you provide. Published project references include villa joinery at North Turramurra and Willoughby, and villa renovations in Melbourne, Perth and Sydney — useful for seeing how our cabinetry is specified on Australian residential sites, but scope and dates differ per project, so treat them as examples rather than a service guarantee.
Snagging and handover: the last day is not the end
Walk the completed installation with the fitter before signing off, checking:
- Door and drawer alignment, and that pull-free fronts open without binding along their full height.
- Scribe and beading lines against walls and skirting — visible gaps are the most common complaint on older buildings with uneven surfaces.
- Every integrated lighting circuit switches and dims as intended.
- Worktop joints, splashback edges and appliance reveals are sealed and clean.
- Hardware spares — spare runners, hinges and keys — are handed over in one labelled box and stored at a known location.
Record the item codes of anything you may need later. Warranty terms and response times are set out per project in the contract documents, so keep those with the handover file rather than relying on marketing copy.
A practical timeline to work back from
| Milestone | Who owns it | What must already be fixed |
|---|---|---|
| Site survey and measured drawings | We carry out the on-site measurement with your designer | Layout agreed, demolition complete |
| Design sign-off and quotation | You confirm; we detail | Appliance list, finishes, wood colour, storage layout |
| Production | Our factory | Signed drawings, deposit received |
| Packaging and booking freight | We arrange; you or your agent clear customs | Delivery address, access route, chosen Incoterms |
| Arrival inspection | You on site, carrier present | Storage area prepared, packing list in hand |
| Installation and snagging | Our fitters with your site contact | Decoration finished, power available, wall access clear |
| Handover file | Joint | Item codes, spares, contract and warranty documents filed together |
Sizes, materials, wood colour and storage layouts are all customised to the house plan, so the survey and design sign-off carry more schedule weight than any later stage.
Frequently asked questions
Can you deliver directly to a residential address rather than a port?
Yes. Our Furniture Freight by Sea Air and Rail arrangements include door-to-door delivery, with tracking through to the site. Confirm the access route in advance so crates are built for the last leg.
Do we need our own installer, or do you provide one?
We provide on-site installation as part of Furniture Installation for Interior Projects. If you prefer a local fitter, we supply fitting drawings and hardware schedules so their team can work from the same information.
What happens if a panel is damaged in transit?
Send photographs and crate numbers on delivery day. We assess and re-manufacture the affected part, then schedule it to follow the main installation. Replacement parts and spare components are covered under our after-sales support.
Can cabinetry be shipped together with flooring, doors and sanitaryware from the same project?
Yes. As a One-stop Furniture and Building Materials Supplier we consolidate joinery with other building materials on one order, which means one clearance event and one coordinated delivery programme instead of several unconnected ones.
When should delivery and installation be booked?
At design sign-off. The site conditions that govern the installation window — floor levels, decoration sequence, appliance positions — are fixed at that point, so booking freight and fitting slots against them avoids rework later.