A glass front door is the part of a kitchen that everyone sees first, and it is also the part most likely to be specified badly: a frame that sags, a glass edge that chips during transit, or a cabinet box that swells where the splash zone meets the floor. If you are sourcing Santerson Glass Front Pvc Cabinet for a villa kitchen, a serviced-apartment fit-out or a hotel show flat, the buying checklist below is the sequence we work through with project buyers before a drawing is ever released to production. It follows the same path as our own workflow: consultation, design and planning, production, logistics, installation, after-sales.
1. Confirm the scope of supply before you compare prices
Most quotation disputes on glass-front kitchens start because two parties priced different things. Write down exactly what is included in your line item:
- Carcase and door fronts only, or carcase plus doors plus hardware plus glass?
- Glass panes shipped loose for site glazing, or pre-glazed at the factory and crated as assembled units?
- Plinth, cornices, end panels and filler pieces, or are those coming from a local joiner?
- Integrated lighting for the display cabinets, including transformer, driver location and access panel?
- Countertop, sink cut-outs and appliance housings, which sit outside the cabinet scope unless stated.
Our PVC kitchen cabinetry is made to measure, so this list becomes part of the order rather than an assumption. Send the room drawings with dimensions, floor finish heights and appliance schedules at the enquiry stage; that single step removes most change orders later.
2. Match the substrate to the room's moisture reality
PVC-front cabinetry earns its place in kitchens, utility rooms, laundry areas and wet-adjacent zones where a paper-based board core will not forgive splashing or condensation. Where a project has genuinely exposed outdoor cooking positions or semi-exterior pantries, we specify the matching Santerson Outdoor Ready PVC Cabinets range instead of forcing a standard interior specification into an unsuitable location.
Two questions settle the substrate conversation:
- Is the space fully enclosed and conditioned, or is it subject to rain, sea air or unseasonal temperature swings?
- Where does water actually land in daily use — sink run, dishwasher bay, kettle corner, oven vent?
Answer these before choosing a door style. A specification that reads well on a mood board but sits in the wrong moisture zone is the most expensive mistake in the whole checklist.
3. Specify the glass, not just the "glass look"
Glass fronts are an assembly of decisions that must be recorded on the drawing:
| Decision | What to record on the drawing |
|---|---|
| Glass type and thickness | Toughened or laminated, clear / low-iron / frosted / smoked / ribbed, and pane thickness in millimetres. |
| Glazing method | Bead, rebate, silicone-set or removable trim — this determines whether a broken pane can be replaced on site without removing the door. |
| Mullion and frame profile | Profile width, finish colour, and whether the grid is true divided lights or a decorative overlay on one pane. |
| Internal fit-out | Shelf depths, glass versus solid shelves, shelf spacing, and load expectation for heavy ceramics. |
| Door geometry | Height and width per door, hinge side, opening direction, and any handleless or integrated pull detail. |
Ask for a single dimensioned elevation of every glass-front run, not just a perspective render. Renders hide dimensions; elevations expose them.
4. Decide the finish family across the whole project
A glass front never sits alone — it reads against the solid doors beside it. Choose the finish family for the entire run first, then let the glass complement it:
- High Gloss PVC Cabinets for compact city kitchens and show flats, where reflected light is doing work for the space.
- matte pvc cabinets for family kitchens and hospitality pantries, where fingerprints and daily handling matter more than shine.
- Santerson Shaker Style PVC Cabinets where the brief calls for a framed, traditional profile next to display glass.
Order physical samples of both the solid door and the glass-front door in the same finish batch. On-screen colour is not a specification, and gloss levels read differently once they are installed under site lighting.
5. Verify hardware and duty cycle
Glass-front doors are heavier than solid panels of the same size, so the hardware schedule needs the same attention as the aesthetics:
- Hinge brand, load rating and whether soft-close is included or optional.
- Runner specification for drawers beneath display cabinets, including full-extension and load capacity.
- Expected daily use: a private kitchen opened twice a day and a hotel pantry opened dozens of times a day are not the same duty cycle.
- Spare-parts plan — hinges, handles, glass trim and shelf pins held on site or shipped with the order.
6. Lock down measurement responsibility
Made-to-measure only works if somebody signs off the site dimensions. Our interior design and project coordination service covers space layout planning, drawings, production coordination and on-site guidance, which means we can take the second set of measurements after your flooring, tiling and plasterboard are complete. Whichever side does it, record three things: finished floor level, wall plumb and out-of-square tolerance, and the exact position of services that cabinet fixings must avoid.
7. Plan packing and transit for glass
Glass fronts fail in transit far more often than in service, so the packaging plan belongs in the contract:
- Glazed-assembled or flat-pack with loose panes — state it in writing on the packing list.
- Edge protection, corner guards and glazed-unit crating, with pane orientation marked on each crate.
- Container loading plan, so crates are not stacked under heavy carcase bundles.
- Documentation: commercial invoice, packing list, certificate of origin and any import paperwork your customs broker requires. Our logistics team handles sea, air and rail freight with door-to-door delivery, and shipment tracking keeps the site programme honest.
- Cargo insurance terms agreed before loading, not after damage is found on site.
8. Write the inspection and snag list in advance
Agree what "accepted" means before the containers arrive. A practical acceptance check for a glass-front run covers: pane integrity on unpacking; door alignment and gap consistency; hinge adjustment range; operation of every drawer and lift; finish continuity between adjacent doors; and lighting function where display cabinets are illuminated. Photograph anything failing at unpacking, while the crates and their markings are still visible — that evidence is what makes a replacement claim quick instead of argumentative.
9. Confirm after-sales terms for this project
Before you commit, get in writing what the warranty covers, what it excludes, how spares are supplied and who installs them. Our installation and after-sales support includes on-site installation, inspection with a snag list, warranty coverage, spare parts and replacement, and ongoing maintenance — but the exact terms should always be confirmed for your specific order and delivery location rather than assumed from a website page.
10. Check the supplier can carry the rest of the package
Buying cabinets in isolation is usually how a project ends up with three different contractors arguing about tolerances. As a one-stop furniture and building materials supplier, Santerson can carry the rest of the package through the same production and logistics route: Custom Built-in Kitchen Cabinets - Interior Fixtures for Hotel & Apartment Projects for the units, plus engineered flooring, wall panels, lighting, bathroom ceramics and joinery. Fewer suppliers means one coordination chain, one shipment schedule and one point of accountability when something needs replacing.
A short pre-order checklist
- Scope of supply written out line by line, including glass, hardware and lighting.
- Substrate matched to the room's real moisture conditions.
- Glass type, thickness, glazing method and shelf loads on the drawing.
- Finish family chosen across the whole run, with physical samples approved.
- Hinge and runner ratings checked against the expected duty cycle.
- Final site dimensions taken after wet trades and signed by a named person.
- Packing plan, loading plan and insurance agreed before production closes.
- Acceptance criteria and snag list agreed before delivery.
- Warranty scope, exclusions and spares supply confirmed in writing for this order.
If you are specifying a glass-front kitchen for a villa, apartment or hospitality project, send us the drawings and the room schedule. We will return a dimensioned elevation set, a material and finish proposal, and a quotation that states exactly what is included — before anything goes into production.