Painted shaker cabinets are one of the few door styles that survives a change of interior trend. The framed centre panel reads as classic in a heritage villa and as quiet modern in a new apartment. That versatility is exactly why they appear so often in project schedules — and why disagreements about them start late. A designer has a picture in mind; a buyer has a budget line; the factory has a door that will actually be built. When those three do not describe the same cabinet, the fix arrives after production has started.

The items below are the ones that most often get resolved too late on kitchen schedules for villas, apartments and boutique hotels. They apply whether you are working from our Painted Shaker Cabinets line or specifying a shaker door from another supplier.

1. The door profile, drawn rather than named

"Shaker" is a family, not a single shape. Two doors can both be called shaker and still sit differently on a run of cabinetry. Before production, agree on the four measurements that decide how the door reads in a room:

  • Rail and stile width. A slim frame looks contemporary and suits handleless or minimal hardware; a wider frame carries more traditional weight and is easier to keep visually balanced on tall pantry doors.
  • Centre panel relief. Flat, recessed or raised. Our Light Grey Shaker Style Kitchen Cabinets are specified with a raised panel and gold-toned hardware for a softer, more decorative result — the same layout with a flat centre panel reads considerably plainer.
  • Inside corner treatment. Rounded or sharp. Sharp corners keep the shadow line crisp but need more careful handling in transit and on site; rounded corners are less obvious where an edge gets knocked.
  • Total door thickness and hinge boring depth. These decide which hinge and overlay you can use, and they should be confirmed before the carcass is cut, not at assembly.

Ask for a sample door, not a finish board. A finish square cannot show you rail proportion, panel relief or how the paint breaks across a routed edge.

2. Paint system and colour authority

Painted doors are where designer intent most often gets lost in translation. Three points settle it:

  • Name the colour by standard reference — RAL, Pantone or a supplier swatch number — and state the sheen separately. "Warm grey" means one thing on a designer's drawing and something else on a production floor.
  • Fix the sheen before ordering. A matte painted door photographs cleanly but shows marks on a bank of tall units; a mid-sheen or semi-gloss door wipes down more easily around sinks and ovens. Decide per zone, not per project.
  • Confirm the coating route. Primed and sprayed doors behave differently from foil- or lacquer-wrapped panels under the same colour name. If a specification calls for a specific paint build — primer, base, topcoat — say so in the drawing notes rather than assuming it.
Order one painted sample door per colour and sheen combination you intend to use, and approve it under the actual site lighting. Painted surfaces shift noticeably between daylight and warm LED, and a single approved door becomes the reference for every batch that follows.

3. Core material and where the cabinets will live

The core behind a painted shaker door affects cost, weight and how the door holds an edge. Our kitchen ranges cover more than one route — the Shaker Style PVC Cabinets page describes a plywood-based design, while other shaker variants are listed with different panel and finish options — so confirm the core material for each line rather than assuming one standard across the collection. The right choice depends on the environment the kitchen faces. For a villa kitchen, an apartment unit or a boutique hotel, the practical questions are:

  • How much moisture and steam does the run carry, and is it ventilated?
  • Is the door in direct sun, which matters for pale painted colours over time?
  • Will the units be handled by guests or residents, which changes how forgiving the edge and sheen need to be?

State the environment on the enquiry. A supplier who knows the setting can flag a change of core material or finish before it is quoted, rather than after the first sample arrives.

4. Dimensions, layout and what "made to measure" covers

Every unit in the shaker range is made to measure: size, internal partitioning, door colour and surface finish are set per project, so the schedule should carry the same information back. Before anything goes into production, both sides should be looking at one document that shows:

  • Overall run dimensions with finished wall and floor levels marked, including where tiling or flooring changes the datum;
  • Appliance schedules with model numbers and clearances, so oven, microwave, wine fridge and dishwasher niches are cut to the right size first time;
  • Internal configuration per unit — drawer stacks, shelf heights, pull-out corners, waste and laundry integration;
  • Lighting provisions: LED strips in glass display cabinets and open niches need wiring routes and a driver location decided at the carcass stage.

If you are combining cabinetry with other interior fixtures on the same project, place the kitchen schedule and the custom built-in kitchen cabinets scope on one drawing set. Split schedules are a common source of duplicated and missed items.

5. Hardware, tolerances and interface details

Hardware is usually the cheapest item in the specification and the most expensive to change late. Agree on hinges and soft-close fittings, drawer slide rating and runner type, handle or integrated pull profile, and leg and plinth heights. Then confirm the interfaces: worktop thickness and edge detail, splashback rebate, skirting returns, and how doors clear adjacent walls when opened.

A practical rule — if a detail is not drawn, it will be decided by whoever is holding the tool on site. Draw the reveal between door and worktop; draw the plinth setback; draw the handle position for the full door set rather than one elevation.

6. Packing, delivery sequence and installation window

Painted doors are the component most likely to arrive with a chipped corner, so packing should be specified rather than assumed. Confirm how doors are separated and protected, how carcasses are restrained in the container, and whether spare hardware sets ship with the order. For multi-unit or multi-storey work, agree the delivery sequence too: kitchens installed out of order hold up flooring, painting and electrical sign-off.

For cross-border projects this is also where customs paperwork, container loading and door-to-door delivery terms get settled — details worth fixing in writing before production starts. Our installation and after-sales support service covers on-site installation and inspection, so site readiness requirements can be raised early rather than at handover.

A short pre-production checklist

Item to align on Sign-off you should hold before production starts
Door profile Dimensioned elevation of one base door and one tall door, with rail/stile widths, panel relief and corner radius marked.
Colour and sheen One approved painted sample door per colour/sheen pair, signed and dated under site lighting.
Core material Written confirmation of the panel core and coating route for each cabinet zone.
Dimensions and layout Coordinated drawing set with finished levels, appliance clearances and internal configuration per unit.
Hardware Hardware schedule with hinge, slide and handle references, plus door-to-worktop reveals drawn.
Delivery and installation Packing standard, delivery sequence, site readiness date and inspection sign-off point.

None of these items is difficult on its own. What costs time is discovering them after the first batch has been painted — which is why the approved sample door, not the specification sheet, should be the last thing both parties sign.

Where to take the drawings next

SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, with custom cabinetry supplied through our kitchen cabinets and hotel appliances range. Send us the elevations you have — even a marked-up concept set — and we will return a buildable specification for the shaker door, finish and hardware combination your schedule calls for.

Product specifications are confirmed per project; dimensions, finishes and configuration are agreed in writing before production begins.