A wardrobe line that looks identical on the drawing can arrive with different glass, a different frame finish and a different interior layout from one supplier to the next. For Frosted Glass Aluminum Frame Wardrobes, most of the cost and schedule risk in a villa or apartment package comes from items that are easy to leave unspecified. The documentation below is what we ask project teams to put in writing before an order is placed, so that quotations compare on the same basis and the delivered units match the approved detail.

Start with the product family, not just the name

Our Frosted Glass Aluminum Frame Wardrobes sit within the Glass & Aluminum Frame Wardrobes collection, made for residential wardrobe projects where dimensions, finish and layout are set per project rather than picked from a fixed catalogue. That makes the specification sheet more important, not less: two rooms with the same elevation can need completely different carcass construction once ceiling heights, skirting, doors and adjacent joinery differ.

Where the wardrobe has to coordinate with other built-in elements, we usually handle it in the same package. The same project team often also specifies Aluminum Frame Glass Wardrobes for bedrooms and Frosted Glass Aluminum Cabinets elsewhere in the fit-out, so keeping one consistent finish reference across those pages avoids a mismatch in anodised tone between rooms.

What to record for each wardrobe opening

  • Room-by-room schedule. Unit number, room, wall datum lines, finished floor and ceiling levels, and the clear opening after flooring, plaster and skirting are installed.
  • Dimension basis. State whether each measurement is a rough opening or a finished opening, and who measured it. Made-to-measure sizing only works if the measurement stage is fixed in the programme.
  • Frame finish reference. Record the frame colour or anodised tone by name and supplier reference, together with the sample that was approved, rather than by photograph alone.
  • Glass specification. Frosted glass is not one product. Note the frosting treatment (surface finish or film), which face it sits on, transparency level, edge treatment and the glazing standard required for the market.
  • Door type and geometry. Sliding, hinged or open; number of leaves; opening direction; clearance needed for handles and hardware.
  • Interior layout. Hanging heights, shelf positions, drawer banks, lighting provisions — the layout is tailored to the project, so it belongs on the drawing set, not in a purchase note.
  • Interface conditions. Floor covering thickness at the threshold, wall flatness tolerance, skirting treatment, and any recessed niche or arch condition that changes the frame detail.

Confirm before production, in writing

Dimensions and selected specifications should be confirmed for each project against the shop drawings rather than the enquiry. We ask buyers to sign off four things before manufacturing starts:

Item What good looks like in the record
Approved shop drawing Dimensioned elevation and plan for every unit, with revision number and date.
Material and finish board Named frame finish plus named glass type, matched to a physical sample reference held by both parties.
Hardware schedule Handles, runners, hinges and any integrated lighting listed per unit, with the party supplying each item.
Scope boundary Who carries out site measurement, packing to site, installation and snagging. Our service scope covers design coordination, custom/OEM production, logistics and on-site support, but the split varies by project.

Practical note: if a quotation lists "frosted glass wardrobe" with no finish reference and no shop drawing attached, it is not comparable with another quotation. Ask for the missing line items before you use the price to make a decision.

Procurement route for these wardrobes

SANTERSON has operated as a China-based furniture and building materials manufacturer since 2008, supplying residential and hospitality projects through one package that covers design coordination, custom and OEM production, packing, freight and after installation support. Wardrobes are usually ordered alongside other built-in joinery — kitchen cabinetry, doors and panelling — which is where the finish consistency mentioned above gets settled in one place instead of across several suppliers.

For enquiries we work from the room schedule and drawings described above, then return a quotation with the detail confirmed at drawing stage. Site projects in Australia, including villa joinery packages in Sydney, Melbourne, Perth and Willoughby, have followed that sequence: brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up.

Send us the room schedule, the frame finish you want referenced and the glass treatment you expect, and we will return shop drawings for each unit before anything goes into production. That single step is what keeps Frosted Glass Aluminum Frame Wardrobes on budget and on programme.