A design brief tells a manufacturer what the wardrobe should look like. An enquiry tells us what we are actually allowed to build, price and ship. The gap between the two is where most custom joinery projects lose time: dimensions that arrive from a mood board rather than a site survey, a glass sample named only as “smoked”, and an opening whose internal obstructions nobody measured. This guide walks through the sequence we use on residential wardrobe projects so that a Aluminum Frame Glass Wardrobes enquiry comes back with a workable quotation instead of another round of questions.

Start from the opening, not the render

Renders and Pinterest boards are useful for direction, but they cannot carry the numbers. Before an enquiry goes out, we ask buyers, builders and designers to confirm the finished dimensions of the space: width, height and depth at more than one point along each wall, because floors and ceilings in renovation work are rarely square. Note skirting boards, architraves, cornices, radiators, air-conditioning grilles, downlights, switch plates and any door swing that will run into the front of the unit. For a built-in wardrobe these details decide whether the carcass is scribed to the wall, framed out, or set back from the ceiling.

Send photographs of the empty opening from several angles together with the sketch. A hand-drawn plan with dimensions on it is enough; what matters is that we can see the same room you are describing. Where the wardrobe runs between two rooms or wraps a corner, mark which side is the finished floor level and whether tiling or flooring is already laid.

Name the door system before the glass colour

The operating principle drives the frame profile, the hardware and the clearance requirement, so it belongs in the first message rather than the last. Our Glass Door Wardrobes range covers sliding and hinged configurations, and each behaves differently in a tight bedroom:

  • Sliding needs clear front access for the panel overlap and track depth. It suits walls with no furniture in front of them.
  • Hinged needs swing clearance, so it works better where the wardrobe is short or where the room allows a door to open fully.
  • Walk-in and open configurations remove the door question entirely and move the budget into internal fitout.

Tell us which of these you have in mind, or state plainly that you want our recommendation based on the room. Either is fine — what slows an enquiry down is silence on the point.

Specify the glass by reference, not by impression

“Grey glass” means different things to different suppliers. Within our aluminium-frame family the same carcass can be glazed with clear, frosted, smoked, bronze or ribbed glass, and each changes how the bedroom reads: clear enlarges a narrow room but shows everything inside; frosted and ribbed diffuse the contents while keeping light moving; smoked and bronze sit quietly against dark joinery and are the versions most often specified in villa and apartment fit-outs. If you have a colour or finish reference from another project, send a photograph of it with the enquiry and state where it was used — that is far more reliable than a descriptive adjective.

Frame colour and profile width belong in the same line as the glass, because the two are chosen together. Black, bronze and silver aluminium frames behave very differently against pale walls and against timber veneer. Note what the wardrobe has to sit next to: matching kitchen cabinetry, a door set, a wall panel system or an existing floor.

Set out the internal layout around how you actually store things

Internal fitout is where a wardrobe earns its keep, and it is the part buyers most often leave vague. Instead of “lots of shelves”, tell us:

  • Hanging heights you want — short hang for shirts and jackets, long hang for dresses and coats, or double hang stacked in one bay.
  • Drawer counts and whether they should sit above or below the hanging rail, plus anything that needs a shallow tray such as watches, jewellery or folded knitwear.
  • Shelf depths and whether shelves need to be adjustable.
  • Fixed items to design around: a vacuum cleaner, an ironing board, a suitcase, a laundry basket, a safe, or integrated lighting inside the carcass.

A rough inventory helps more than a style word. Count hanging garments by type, note whether shoes and bags have their own place, and say who uses the wardrobe — one person, a couple sharing bays, or a guest room that stays mostly empty.

State the project context

The same unit is quoted and shipped differently depending on where it is going. Include in the enquiry:

  • The number of wardrobes or rooms involved, and whether other joinery is being ordered at the same time — kitchen cabinets, vanities, media walls or door sets can be consolidated into one production run and one container.
  • Delivery destination and who receives goods on site.
  • Whether you want the units flat-packed for local installation or assembled where possible.
  • The stage the project has reached: concept, documentation, or ready to manufacture.

For whole-home work we handle built-in furniture alongside the rest of the fit-out, and our custom furniture manufacturer service covers bespoke sizes, finishes and layouts rather than a fixed catalogue module. If your brief also includes kitchen or bathroom joinery from the same palette, mention it at the outset so the specification is consistent across rooms.

What we send back, and what happens next

With those inputs an enquiry can be answered properly. We review the opening dimensions and the intended door system, then come back with questions on anything unresolved, a proposal for the layout and materials, and a quotation. After details are confirmed we move to production, then logistics and door-to-door delivery, with installation guidance and after-sales support following the shipment. Dimensions and selected specifications are confirmed for each project before manufacture, so nothing is committed on the strength of an assumption.

If you have drawings ready, send them. If you only have photographs of a bedroom and a rough idea, that is a workable starting point too — the enquiry just needs the opening measured and the door system named.