A quotation for a made-to-measure mirror cabinet looks complete until you try to compare it with a second one. Two suppliers can price the same Santerson Round Mirror Cabinet very differently, and the gap is usually hiding in what neither document states clearly. Work through the six checks below before you sign.

1. Confirm the round profile against your wall, not a catalogue size

The Santerson Round Mirror Cabinet is offered with made-to-measure sizing, and its finish, layout and dimensions are specified per project rather than picked from a fixed size grid. That flexibility is the point of the product, but it also means a proposal quoting “one round unit” tells you almost nothing.

Ask for a dimensioned drawing stating overall diameter or width, projection from the finished wall face, and the height of the centre line. Then cross-check those three numbers against your own setting-out: the position of the basin or countertop below, tapware on the deck, wall tiles that change the finished face, and the swing of the bathroom entrance door. A circular front looks forgiving on paper, yet a projection that clears a tall vessel basin can still clash with a door.

2. Read the specification for what is actually excluded

A proposal should name the carcass material, the front construction, the finish system and the mirror grade. Where those lines read “standard board”, “moisture resistant” or “as shown”, treat them as open items rather than assumptions.

In a wet room, push hardest on the substrate and the edge treatment. Ask which board is used behind the mirror, how the edges are sealed, and how the mirror is fixed to the door or carcass. Then ask what the price does not include: interior shelving, glass shelves, an outlet inside the cabinet, plinth, or side panels returning to the wall. These are the items most often re-quoted as extras once the order is placed.

3. Match the lighting scope before you compare prices

If your design calls for light at the mirror, check whether the proposal prices a round cabinet lit by an external fitting on your circuit, or a purpose-built illuminated unit. Those are different products with different electrical work behind them, and the difference shows up in both price and site coordination.

Where lighting must be part of the joinery itself, the Santerson LED Mirror Cabinet sits in the same mirror cabinet collection and follows the same project-specific sizing and finish approach. Ask for the light source specification, where the driver sits and whether it stays accessible for servicing, and how the unit is isolated on site. Confirm lighting and electrical specifications for each project before accepting a proposal, not after the wall has been closed up.

4. Check that the round format suits the storage you need

A round front reduces usable width at the top and bottom of the carcass. If the brief is toothbrushes and a cleanser bottle, that hardly matters. If it is towels, spare linen or tall bottles, ask for an interior elevation showing shelf positions, shelf depths and clear openings.

Where storage drives the design, say so in your enquiry and ask whether another format in the same finish family serves better. A Santerson Tall Mirror Cabinet carries the same made-to-measure approach with more vertical storage, while the Santerson Standard Mirror Cabinet is the plainer starting point when the round silhouette is not essential. A supplier who answers that question honestly, even if it means offering a different item, tells you more about how they work than one who simply quotes what you asked for.

5. Verify how the unit will be fixed and supported

Ask what fixing method is specified for your wall build-up, whether backing battens or framing are required behind the finished face, and who supplies them. A made-to-measure cabinet hung on a substrate never designed for the load becomes a site problem nobody wants to own.

Then check what after-sales support is attached to the order. The services listed alongside SANTERSON’s project work cover inspection and snags, warranty coverage, spare parts or replacement, and ongoing maintenance. Get in writing which of these apply to your purchase, what the warranty covers and for how long, and who attends to a door front or mirror that arrives damaged. Response-time figures quoted in marketing material are not contract terms until they appear in your documentation.

6. Test the supplier’s process, not just the price line

Mirror cabinets go wrong on projects more often through coordination than through materials. The workflow described for SANTERSON’s interior design and project services runs from a project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up, with drawing and production coordination in between.

Use that sequence as your evaluation checklist. Does the supplier issue shop drawings for your sign-off before cutting? Do those drawings show the interface with tiles, basin, tapware and electrical points? Is one named person coordinating drawings, production and delivery? Is packing arranged so a mirrored front travels safely, and is transit damage handled without weeks of argument? On villa and hospitality work, where cabinets, vanities, basins, lighting and joinery are ordered together, this coordination outweighs a small price gap. A custom and OEM service covering the whole bathroom package under one production plan removes the handover gaps between separate suppliers.

Seven items to send back with your questions

Before awarding, request these in writing:

  • Dimensioned elevation and plan of the round unit, including projection from the finished wall face.
  • Named substrate, finish system and edge sealing for a wet environment.
  • Mirror grade, fixing method to door or carcass, and the edge polish or bevel detail.
  • Interior layout: shelf positions, depths, clear openings, glass and electrical provisions.
  • Lighting scope, integrated or external, with light source, driver location and isolation.
  • Explicit exclusions, plus packing arrangements and who carries transit risk.
  • Warranty terms, spares availability, and the snag process for your site.

Two proposals that look identical at the total separate quickly once those seven items are answered. Send the list to both suppliers and judge the quality of the answers rather than the numbers alone: a supplier returning complete drawings, named materials and honest exclusions has already shown you how the order will run.

To price a round mirror cabinet for a particular bathroom or villa package, send your setting-out drawing and finish preference through the contact page.