An outdoor swim spa in the 10-metre class is not an off-the-shelf purchase. Before we can price the Outdoor Swim Spa WS-130BⅨ properly, our engineering team needs a clear picture of the site, the power supply and the equipment you expect in the finished unit. This guide sets out exactly what to send with your enquiry and how the quotation is built up, so the first reply you receive is close to the final number rather than a rough guess.

Start With the Model as Catalogued

The WS-130BⅨ sits in our configurable outdoor swim and hydrotherapy range. The catalogue entry lists overall dimensions of 9950 × 3000 × 1430 mm, one control system, one swim training system, one water pump, one filter pump, twenty water jets, seven LED lights and a total power figure of 10.85 kW. The features shown for this model are water jets, LED lighting, ozone and the swim training system.

Treat those numbers as the starting specification, not a fixed promise. They describe one particular configuration on our product page, and the equipment you select will move them. A quotation that ignores this is the main reason early prices for long swim spas differ so much between suppliers.

Compare the Variant Before You Specify

The same shell is also listed as Outdoor Swim Spa WS-130BⅨ-U, at the same 9950 × 3000 × 1430 mm envelope. The captured specification for that variant shows four water pumps, twenty-three jets, five LED lights and a total power of 11.85 kW, with no swim training system listed for it.

That difference matters when you plan your electrical supply and your daily use. The WS-130BⅨ listing includes a swim training system, which is the counter-current unit you swim against, while the -U variant lists more water pumps and jets without that item recorded. Tell us which of the two you are working from, or say plainly that you want a comparison of both for your site, and we will price them side by side.

What We Need in Your Enquiry

Send the following six items with your request. With them on hand we can return a specification sheet and a quotation that production can actually build from.

  • Site condition. Is the spa going onto a ground-floor slab, an upper terrace, a wooden deck or a sunken pit? Include a sketch or photos with the clear opening widths and the route from the delivery vehicle to the final position. A 10-metre shell cannot turn a tight corner, so access is often the deciding factor.
  • Structural support. Who is preparing the base — you, your builder or us? Tell us the finished load-bearing arrangement and whether insulation or a plant-room void is required beneath the cabinet.
  • Electrical supply. Voltage, phase and frequency at the site, plus the available distribution capacity. Total power rises with every heater, pump and heat pump you add, so we size the recommendation from your actual supply rather than a generic figure.
  • Equipment options. The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so list what you want and we will confirm what fits the shell you choose.
  • Intended use. Daily lap training, hotel or resort leisure use, hydrotherapy, or a family villa garden. Use drives jet layout, water treatment duty and how robust the finishes need to be.
  • Delivery terms. Destination port or site address, your preferred Incoterms, and the date the spa must be on site. This lets us plan packaging, container loading and the freight route in the same pass as the quotation.

Project drawings are welcome if you have them; a phone photograph of the terrace is enough to begin with. If you are still weighing up sizes, our Swimming Pools and Swim Spas range page lists the other configurations in the series for comparison.

How the Quotation Is Assembled

Your enquiry goes to the same team that handles our custom and OEM work, so the reply is a buildable specification rather than a price list. We work through it in this order:

StageWhat happens
Specification reviewWe check your site, supply and option list against the selected shell and flag anything incompatible before pricing.
Equipment schedulePumps, jets, lighting, ozone, sterilisation, filtration, insulation and steps are itemised so you can see what each choice costs.
Production planAcrylic shell, reinforcement and cabinet build are scheduled with the options confirmed in writing.
Packing and freightPackaging, container loading and door-to-door delivery arrangements are quoted together with the unit, so there is no separate surprise at the end.
Installation and supportSite guidance, commissioning support and after-sales service follow the handover stage of our Furniture Installation and After-sales Support service.

If your project also needs the surrounding terrace furniture, wall finishes or bathroom fit-out, we can carry those items in the same package as part of our One-stop Furniture and Building Materials Supplier service, which covers design consultation, material selection, manufacturing, project coordination and handover.

Questions Worth Asking Us Directly

  • Which options are compatible with the WS-130BⅨ shell, and which belong to another model in the range?
  • What total connected load does my selected configuration draw, and what distribution board does that require on site?
  • What insulation and cover arrangement do you recommend for the climate at my project location?
  • Who handles the base preparation, and what tolerance is acceptable for the finished support surface?
  • Which spares should be shipped with the unit rather than ordered later?

We would rather answer these in writing before an order than resolve them on site afterwards.

A Note on Other Configurations

If the 10-metre envelope does not suit your site, two related products are worth a look: the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool, which pairs a long swimming channel with a separate relaxation area, and the Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool, where square, round, oval and curved layouts are made to fit awkward terraces and garden corners. Send us the plan of your space and we will tell you which of the three is workable.

All dimensions, jet counts, lighting counts and power figures quoted above are transcribed from our product catalogue for the stated configuration. Confirm the included equipment and the electrical requirements for your selected configuration with us before ordering; the final specification sheet issued with your quotation is the controlling document.

Send your site photos, supply details and option list through our contact page, and we will return a specification sheet and a quotation for the Outdoor Swim Spa WS-130BⅨ or the variant that suits your project.