A wardrobe that photographs well on a supplier's product page can still arrive with the wrong glass tint, an acrylic panel that crazes at the edge, or a carcass that does not line up with an Australian ceiling. Glass & acrylic combination wardrobes mix two materials that behave very differently under humidity, freight and site handling, so the verification work has to happen before the order is placed, not after the container lands. The checklist below follows the same order of decisions we work through on villa and apartment projects in Sydney, Melbourne, Perth, Willoughby and North Turramurra, and each item names the document or sample you should ask the supplier for.
1. Confirm which panels are glass and which are acrylic
In a combination door, the two materials are often specified with one line on a drawing. Ask for a written schedule that states, panel by panel, the material, thickness, colour code and edge treatment. Acrylic reads warmer and lighter in the hand; glass reads flatter and colder under raking light. Where a design calls for full-height glazed fronts, check whether the acrylic is being used as a glazing layer over a substrate or as a standalone door face — that single line changes how the panel is cut, edged and hung.
Our Glass & Acrylic Combination Wardrobes are made to measure, so the schedule is drawn from your room dimensions rather than chosen from a fixed size range. Request the same level of detail from any other supplier you are comparing.
2. Ask how the finish will look under your lighting
Acrylic is the panel that decides whether a built-in reads as quiet or glossy. A matte surface diffuses light and hides fingerprints; a high-gloss surface reflects the ceiling fitting and every smudge on the door. Both are available across the range — see Matte Acrylic Wardrobes and Two Tone Acrylic Wardrobes — but the colour you approved on a phone screen is not the colour that arrives under 3000K downlights in a bedroom.
3. Verify the door system against your circulation space
Hinged doors need a clear swing; sliding doors need a track zone and a wall to return into. Measure the walkway, then check the door against it — including the bed, the skirting and any doorway that opens into the wardrobe wall. For bedrooms where the swing cannot be cleared, a Glass Sliding Door Wardrobe keeps the glazed front without taking floor space when the door is open. Get the track type and the minimum overlap dimension in writing, because that dimension determines whether your glass panel will show a gap at the reveal.
4. Fix the internal layout before production starts
The front of the wardrobe is what you see; the inside is what determines whether the fit-out works for five years. Hanging heights, drawer zones, shelf spans and any lighting provision should be drawn once, signed once, and then left alone — late changes after cutting starts are where custom joinery budgets slip. Where a bedroom needs storage planned around daily habits rather than a standard module, our Custom Minimalist Bedroom Wardrobe shows how sizes, internal layouts, door styles and surface finishes are specified together in one package.
| Item to confirm | What to ask the supplier for |
|---|---|
| Panel material and thickness | Written schedule naming glass, acrylic and board panels separately, with thickness and colour code |
| Door system and clearances | Track or hinge specification plus minimum overlap and swing clearance dimensions |
| Internal layout | Signed dimensioned elevation showing hanging, drawer and shelf zones |
| Edge and surface treatment | Edge banding or polishing detail for acrylic edges; seaming detail where glass meets board |
| Site conditions | Finished floor level, ceiling height and out-of-plumb allowance recorded on site before sizing |
| Packing for sea freight | Glazed panel crating detail and container loading plan for your shipment |
Ask for each item above in writing and attach the supplier's reply to your purchase order; verbal assurances do not survive a container voyage.
5. Treat freight as part of the specification
Glass and acrylic fail in transit in different ways: glass chips at the corner, acrylic scratches on the face. Neither is a defect once the panel has been packed for ocean freight — both are packing problems, so settle the packing method with the supplier before production. Our Logistics & Door-to-Door Delivery service covers customs paperwork, crating and container loading, and we ask Australian buyers to confirm the import terms, duties and delivery scope for their own project rather than assume a standard arrangement applies.
Also confirm who installs. Built-in wardrobes only look correct when the carcass is scribed to a wall that is rarely perfectly straight. Decide in advance whether your local builder sets the unit or the supplier's installation support covers it, and record which party owns the snags list at handover. Our Installation & After-sales Support service page lists on-site installation, inspection and snagging, warranty coverage and spare parts — ask us which of those apply to your address before the order is confirmed.
6. Check the supplier's project record, not their brochure
Ask for wardrobe or joinery packages delivered to Australian projects and read what the case actually says: scope, location, and what was supplied. We publish villa work in Sydney, Melbourne, Perth, Willoughby and North Turramurra, and we are glad to walk a buyer through how joinery on those projects was coordinated with flooring, wall panelling and lighting so that one trade did not undo another's work.
A supplier who can produce dimensioned drawings, physical samples, a packing plan and named project references will answer all six checks above in a single email. That is the shortlist test worth applying before you compare prices.
SANTERSON supplies made-to-measure built-in furniture, interior fixtures and building materials for villa, apartment and hospitality projects, with custom/OEM manufacturing, door-to-door logistics and installation support. Send us your room dimensions, finish preference and door type, and we will return a wardrobe schedule you can check against this list.