An integrated basin looks simple on a drawing: one slab, one shallow bowl, no visible seam. That simplicity is exactly why it gets under-specified. Procurement teams approve the render, assume the vanity supplier will "make it work", and only discover at site level that the waste set is wrong, the cut-out does not match the tap spout, or the slab cannot be replicated after a breakage. The specification below is the paperwork we ask our own production team to sign off on before an integrated basin enters manufacturing.
What "integrated" actually commits you to
With an undermount basin or an above-counter vessel basin, the bowl is a separate item bolted or bonded to a countertop. If it chips, you replace the bowl and keep the slab. An integrated basin is machined from the same piece as the deck — top, rim and fall are one continuous surface. That gives you the seamless look and the easy wipe-down, but it also means the basin geometry is fixed the moment the slab is cut or moulded.
Two consequences follow, and both belong in your procurement file rather than in a site conversation:
- There is no field correction. A bowl that is a few millimetres too shallow, or an overflow placed behind the tap, cannot be adjusted by the installer once the slab has been cut.
- Replacement is unit-level, not part-level. If one basin in a batch is damaged in transit or on site, the replacement has to match the original colour, grain direction and finish, not just the model name.
Document 1: the deck material and how it is being formed
"Stone basin" is not a specification. The same visual result can be produced by machining a solid slab, by casting engineered stone with a moulded bowl, or by fabricating a surface from the stone and marble surfaces family with a formed basin shroud. Each route behaves differently under load, at the fall to the waste, and when you order a spare.
Record in the specification sheet:
- Material name as the factory states it, plus slab or batch reference where the surface has veining.
- Formation method — machined from solid, cast/moulded, or fabricated with a formed bowl.
- Surface finish on the bowl interior and rim (polished, honed, textured), since a single material is often offered in more than one finish.
- Sealing or treatment requirement, if the supplier states one for that surface.
For natural veined material, ask for the cutting layout or at least a photograph of the block before fabrication. Grain position is the fastest way to end up with a basin that matches on paper and not on the wall.
Document 2: dimensions, but the ones that actually fail
Overall length and depth are already on the drawing. The measurements that cause rework are the internal ones, and they should be listed as a dimensioned sketch signed by both sides — not as a single "as discussed" note.
| Item to record | Why it fails if left open |
|---|---|
| Bowl length, width and internal depth; radius of internal corners | Tight radii are not producible in every material; square internal corners concentrate stress and are hard to clean. |
| Deck thickness at the rim and the thinnest point of the bowl wall | A thick decorative edge can be carried down into a bowl that becomes too shallow for everyday use. |
| Fall to waste and its direction | Standing water and slow draining are the most common complaints, and the fall is set during fabrication. |
| Waste position and centre from the back wall | Waste position dictates trap type, cabinet cut-out and whether the vanity carcase can be built as drawn. |
| Overflow presence, size and position | Not every integrated basin carries one; if it does, the position affects tap choice and the front shroud. |
| Tap hole set-out or no-drill confirmation, with spout reach and height | A tall vessel tap that splashes outside a shallow bowl, or a deck-mounted tap landing on the bowl rim, both come from unrecorded set-out. |
| Front and side edge profile, plus any splashback return | Edge detail is where visual matching between rooms and between batches is judged. |
| Cut lines for basins that cross a join or an appliance cut-out | A bowl straddling a joint cannot be fabricated as drawn on a long run. |
Document 3: the hardware you are buying separately
Integrated basins are usually supplied without waste, trap, tap and fixings. That is normal — but it means three separate purchase orders have to agree with each other. Put the following in one line item table so nobody assumes the other trade covered it:
- Waste type and whether it needs an overflow connection, plus the thread/size standard being ordered to.
- Trap configuration (in-wall or below-counter) and the clearance it needs inside the integrated countertop vanity carcase.
- Tap mounting method (wall, deck or basin-rim) and spout reach relative to the recorded bowl depth.
- Who supplies sealant, brackets and the load-bearing support for a cantilevered or wall-hung deck.
Document 4: load, support and substrate
A machined slab deck is heavier than the carcase drawings often assume, especially on long vanities or where a double basin is being formed from one piece. For any double basin countertop arrangement, record the total weight per unit as declared by the fabricator, the support method along the span, and whether the carcase, wall framing or a steel subframe takes the load. Wall-hung installations need the fixing detail and the substrate it is fixed into, not just "wall mounted".
Document 5: batch, spares and the matching rule
Because the bowl and deck are one piece, damaged units are replaced as whole units. To protect a multi-unit order, record:
- Quantity per room or floor per unit, so a replacement can be traced to its location.
- The exact finish and material reference used for the batch, with the approved sample retained on site.
- Whether spares are being ordered with the main batch — usually cheaper and safer than re-ordering after handover, when the original batch reference no longer exists.
- Fabrication photographs of each unit before packing, particularly for veined material.
Document 6: tolerance, packing and inspection at delivery
Ask the fabricator to state, in writing, the dimensional tolerance they hold for bowl depth and waste position, and how units are packed (vertical or flat, crated individually or palletised together). Then inspect at delivery against the same document: check for transit damage on the bowl interior, verify waste centre against the drawing, and confirm each unit carries its room label. Anything found at delivery can be replaced in production; the same defect found after installation becomes a demolition cost.
How this fits into a project workflow
For villa and hotel fit-out, an integrated basin is rarely ordered alone — it sits inside a package with vanities, mirrors, tapware, shower sets and wall finishes. Coordinating that package with the same supplier removes most of the interface risk described above: one set of drawings, one cut-list, one packing schedule and one point of contact for production coordination. Our custom & OEM service covers made-to-measure sizing, material and finish selection and layout tailored to the project, with drawings confirmed before production starts. Where a project needs it, design consultation, production coordination and logistics and door-to-door delivery run through the same team, so the specification that was approved in the office is the one that arrives on site.
If you are preparing a tender or a purchase order for bathroom fixtures, send us the room set, the deck material preference and the tapware selection. We will return a dimensioned basin detail with waste position, tolerance and packing schedule for your review before anything is cut.