A laundry and storage combo looks like a small item on a furniture schedule until it is the only place housekeeping can hide linen, detergent and a spare vacuum. In both hotel rooms and villa utility areas, this one joinery unit decides whether the back-of-house workflow runs quietly or spills into the corridor. Below is how we specify these units for hospitality and residential projects, and what to check before you place an order.

What a laundry and storage combo actually has to do

A combined unit carries three jobs at once: it houses the washing and drying appliances, it stores consumables such as detergent, linen and cleaning tools, and it keeps all of that out of sight in a finished space. In a serviced apartment or villa that means the unit sits next to a bathroom, hallway or kitchen wall and must match the surrounding cabinetry. In a hotel guest suite or staff floor it usually has to survive daily use by people who are not the owner.

That double duty is why we treat it as part of the fit-out package rather than as loose furniture. Our Laundry & Storage Combo sits in the Laundry Integration collection and is made to measure, so the width, height and depth follow the actual wall opening instead of a nominal catalogue size.

Match the unit to the room type, not the other way round

Three layouts cover most project situations:

  • Stacked units put the washer and dryer one above the other and free up the floor. They work in narrow hotel utility alcoves and villa bathrooms where the door swing has to stay clear. See Stacked Laundry Units.
  • Pull-out hampers solve the sorting problem. Drawers on runners let staff or residents drop soiled linen and pull it straight to the machine, which removes the extra trip that makes small laundry corners messy. See Pull Out Laundry Hampers.
  • Full-height cabinets with appliances integrated hide everything behind one tall door line, useful when the unit faces a guest area or an entrance hall. In the same collection, Multi Function Tall Cabinets combines appliance housing with linen and consumables storage in one run.

Where the room is very tight, a compact configuration keeps machine access and consumables storage in one narrow run. Compact Laundry Solutions is specified for exactly those situations, where every centimetre of a bathroom or corridor wall is already committed to pipework or a door swing.

Six decisions to settle before you order

  1. Appliance first, carcass second. Send the appliance model and its service dimensions with your enquiry. Door opening direction, water inlet and drain position all change the internal layout, and it is far cheaper to move a shelf than to move a standpipe.
  2. Ventilation for the dryer. A built-in dryer needs an air path that matches the machine type. Confirm whether the project uses vented or condenser appliances before the carcass is drawn, and leave access to whatever ducting or condensate route is required.
  3. Finish that suits damp conditions. Utility rooms cycle between humid and dry. We offer material and finish options across the collection, including moisture-resistant board and laminate choices, so the unit can be matched to the rest of the cabinetry without using the same board everywhere. Specify the wet-zone surfaces separately from the display surfaces.
  4. Storage split that fits the operation. Hotel staff need tall shelving for bulk linen; a villa owner usually needs more drawers and less open shelf. Decide the open-to-closed ratio per unit, not per project.
  5. Hardware rated for daily cycles. Runners and hinges are the parts that fail first in a hospitality setting. Ask for hardware suited to frequent use and confirm load ratings for linen storage.
  6. Access panels, not cut-outs on site. Valves, filters and meters need a planned opening. Detail these into the drawing so nothing is trimmed into the panel on the day of installation.

How it fits into a whole-project package

The practical advantage of sourcing this joinery with the rest of the fit-out is consistency. When cabinetry, vanities, wardrobes and wall panelling come from one manufacturer, door profiles, edge treatments and colour references carry across rooms, and there is one production schedule and one shipment to coordinate rather than several. SANTERSON works as a one-stop furniture and building materials supplier for villa, hospitality and office projects: design consultation and space planning, material selection and product specification, manufacturing with quality control, project coordination, then delivery and installation support.

For an end-to-end project package, we produce the laundry units alongside the bathroom cabinetry and wardrobes they sit next to, so the joinery line reads as one design. Project references published on our site include villas in Sydney and Melbourne and apartment projects in Perth, Willoughby and North Turramurra.

A simple specification you can send with your drawing

To get an accurate quotation for a laundry and storage combo, include:

  • Clear opening dimensions, plus the position of doors, pipework and any existing standpipe.
  • Appliance models, with service and ventilation requirements.
  • The required internal layout: stacked or side-by-side appliances, number of hampers, shelf heights, drawer count.
  • Board and finish choice for the carcass and the doors, matched to the adjacent joinery.
  • Quantity per room type, and the delivery location for the project.

Send us the room drawing and that list, and we will confirm the dimensions and selected specifications for each unit before production starts. Because these units are made to measure, dimensions and finishes are confirmed per project rather than fixed in advance.

FAQ

Can a laundry and storage combo be built to an unusual ceiling height?

Yes. The units in the Laundry Integration collection are made to measure, so height, width and depth follow the site opening. Confirm the finished floor level before we dimension the carcass.

Can the doors match existing kitchen or wardrobe fronts?

Yes. Material and finish options are available across the collection, and door profiles can be aligned with the cabinetry and wardrobes specified for the same project.

Do you ship these units to Australia?

Yes. Freight is arranged by sea, air or rail with customs paperwork and door-to-door delivery; import terms, duties and transit times are confirmed case by case for each project.