A corner tall cabinet looks simple on a drawing: one vertical run of storage tucked into an angle. On site it is the joinery item most likely to arrive with the wrong depth, the wrong door swing or an appliance that no longer fits the box built around it. The checklist below follows the order in which decisions actually have to be made, using Santerson Corner Tall Cabinets as the reference item and the rest of the Tall Cabinets collection as the comparison set.
1. Confirm the corner geometry before anything else
Every later decision depends on how the corner is formed, so record it first:
- The angle of the two walls and whether they are square to each other as built, not as drawn.
- Whether the run terminates at a wall, a doorway or an opening, and which side the door has to clear.
- Clear floor-to-ceiling height at the corner itself, including any skirting, cornice, services or ceiling set-down that reduces usable height.
- The depth available on each leg of the run, checked at the finished floor and finished wall level rather than the structural one.
Santerson makes these units to measure, so the cabinet follows the site condition instead of the other way round. That flexibility only helps if the dimensions handed over are the finished ones.
2. Decide what the unit has to hold
Write down the actual contents, because a tall corner unit earns its cost by consolidating things that would otherwise sit in several pieces of furniture:
| Linen, towels and bulk supplies | Adjustable shelving at heights matched to the stock being stored, with deeper bays at the bottom. |
| A washer, dryer or other appliance | Integrated Appliance Tall Cabinets apply. The opening, ventilation and electrical requirements are set around the specific appliance model. |
| Cleaning equipment, hoovers, brooms | Full-height hanging or pull-out storage so nothing has to be lifted out of a low bay. |
| Items you want on display | Open Shelf Tall Cabinets or Glass Front Tall Cabinets where the corner sits in a living or hallway space. |
| Household consumables and supplies for a whole floor | A general Utility Tall Cabinets run, or Multi Function Tall Cabinets when the same box has to serve laundry and storage duties. |
3. Set the internal layout, not just the carcass
Two units with identical external dimensions can perform very differently inside. Specify:
- Shelf positions and whether shelves are fixed or adjustable, and by how much.
- Drawer bank height — deep base drawers waste less corner space than a stack of shallow ones.
- Hanging rail heights, if the unit doubles as outerwear or linen storage.
- Whether the door is hinged or sliding, which decides how much clearance the corner needs to stay usable.
4. Match the finish to the joinery it sits beside
A corner tall cabinet usually reads as part of a wall, so its finish has to match adjacent work rather than stand alone:
- Door profile — flat, shaker or paneled, consistent with the kitchen and wardrobe fronts in the same project.
- Surface and colour — matte, high gloss, lacquer, melamine or wood veneer, sampled against the neighbouring units under site lighting.
- Hardware — handles, hinges and soft-close fittings, including whether the project calls for a handleless detail.
Where the corner unit continues into bedroom storage, the same finish logic applies to L Shaped Corner Wardrobes, which keeps the joinery language consistent across rooms.
5. Check the services and the floor before production
- Water, waste and power outlets that fall inside the footprint — relocated before the unit is made, not after.
- Ventilation and clearances for any appliance being enclosed.
- Floor level and finish build-up, which changes the plinth height and whether the doors clear the floor covering.
- Wall loading, if the unit is fixed back to a partition rather than a masonry wall.
6. Cover the supply side of the checklist
For a project running several units across several rooms, the purchasing items matter as much as the design ones:
- A confirmed dimension set for each unit, taken from finished levels and signed off before manufacture starts.
- One finish schedule covering tall cabinets, wardrobes and kitchen fronts, so sampling happens once.
- Packaging, container loading and delivery arrangement to site, coordinated with the other fit-out items on the same shipment.
- Installation sequence — tall units usually go in before flooring trades and soft furnishing are finished.
- A route for snagging, spare parts and replacement hardware once the units are in use.
7. Sign off against the specification you approved
When the units arrive, check dimensions against the approved drawings, open and close every door and drawer, confirm the appliance openings fit the models actually purchased, and compare finishes against the signed sample. Anything that fails goes back through the same supplier that made it.