A concealed door looks simple on a drawing: a flush leaf, no visible frame face, no handle in the way. It is one of the easiest details to approve and one of the most expensive to change once the wall is closed. Before your team signs off Santerson Decorative Concealed Doors, the questions below are the ones worth putting in writing, because each one decides who pays for the next revision.
1. What exactly is being approved: the door alone or the wall around it
Concealed doors fail most often at the boundary between trades. Our Santerson Handleless Concealed Doors and Flush Wall Aligned Doors are supplied made to measure for each opening, with the finish, layout and dimensions specified per space. That flexibility only works if someone has already decided who builds and supports the wall cavity, who sets the frame line, who finishes the surrounding surface, and who is on site when the leaf is hung and adjusted.
Put that split of responsibility into the approval sheet before the drawing package is frozen. If your builder assumes we handle the opening and we assume your framer has set it, the door becomes the thing that gets blamed for a wall that was never square.
2. Are the openings measured off the finished design or off the current site condition
Made-to-measure sizing is the core of this product, so the measurement basis has to be agreed before anything is cut. For each door in the schedule, confirm and record:
- The opening width and height at the point of installation, not the design dimension on a drawing that predates the last revision.
- The finished floor level under the swing path, and the gap you expect between leaf and floor covering.
- The total build-up of the wall finish, so the leaf sits proud or flush exactly as intended.
- Which side the hinge line and the opening direction sit on, checked against furniture layout and traffic flow.
- Whether adjacent doors share a wall, because two concealed leaves close to each other change what each frame can be fixed to.
We work from drawings and site information you send us; the measurement confirmation should come from your side of the project once finishes are fixed. If levels move after that point — a thicker screed, a different floor covering, a relocated service run — tell us before production starts, not when the doors arrive.
3. Which finish is being signed off, and against what reference
A decorative concealed door is judged by how little it reads as a door, so the surface matters more than the substrate beneath it. Material and finish options are specified per project, and we produce to the approved reference rather than to an approximation of it. Before approval, confirm:
- The finish reference itself — sample number, physical sample or approved panel — and that the same reference appears on the joinery, panelling and door schedules.
- Grain direction and board orientation for wood and veneer finishes, which is where a matching job most often goes wrong.
- Sheen level and how the surface behaves under the room's lighting, especially along a corridor with grazing light.
- Whether the door leaf, Integrated Door & Paneling, and adjacent wall panels are ordered together from one specification, so they age and reflect light as one surface.
Where the door has to disappear into a paneled wall, order the leaf and the paneling against the same reference at the same time. Two separate orders that each look correct on their own are the usual cause of a visible seam.
4. Hardware, movement and access expectations
Handleless detailing means there is no obvious place to grab, so the way the door is opened and the clearance it needs must be agreed with the design intent. Confirm the opening method for each leaf, the swing or sliding path, and any restriction from skirting, reveal returns, lighting, or door furniture nearby. For accessible rooms and corridors, check the clear opening width against your access requirements before the opening is framed — this is a dimension your project team owns, and it is far cheaper to change on paper than in plasterboard.
5. What happens after approval: production, delivery and installation
Once the specification is confirmed, our workflow runs through design and detail confirmation, then production, shipment tracking and door-to-door delivery, with on-site installation support and inspection afterwards. For projects abroad this means sea, air or rail freight with the customs paperwork handled for you, and coordinated delivery to site rather than a drop at a port. Two practical points matter more than the transport mode:
- Book the delivery window against your wall-closure programme, so concealed leaves arrive before the openings are closed up, not after decoration has started.
- Keep one person on site responsible for receiving and storing the doors flat and protected until hanging, and keep the approved schedule with the door sets.
The approval checklist worth copying into your project file
- Scope split between our supply and your site trades, written down and countersigned.
- Opening dimensions confirmed at finished level, with floor build-up and wall finish thickness recorded.
- Finish reference, grain direction and sheen approved against a physical sample.
- Hinge side, opening direction, clear opening width and access requirement checked per leaf.
- Door and paneling ordered from one specification where the leaf must disappear into a wall.
- Delivery date aligned with the wall-closure programme, with storage and installation responsibility named.
If you are specifying concealed doors as part of a wider fit-out, send us the door schedule together with the joinery and paneling drawings. We will confirm what can be produced to your specification and flag any dimension or finish conflict before approval, so the revision happens on paper. Talk to our project team about your schedules at Contact Us.