A swim spa in a hotel garden or rooftop terrace has to work hard: it serves fitness guests in the morning, hydrotherapy guests in the evening, and it sits outdoors all year without closing for the season. Outdoor Swim Spa WS-S06CT-L is one of the longer units in our configurable outdoor swim and hydrotherapy range, and it is often specified for hospitality fit-outs where floor area allows a full-length swim lane plus a massage zone. This guide walks procurement teams through what the model offers, how it differs from the shorter variant beside it, and which details to confirm before you place an order.
Where this model fits in a hotel project
Hotels rarely need a full competition pool. What they usually need is a compact water feature that gives guests a place to swim laps, do physiotherapy, or relax after travel — without the excavation, plant room and building works of a conventional pool. A swim spa is delivered as a self-contained shell with its pumps, filtration and controls built in, so it can sit on a prepared deck, a terrace slab or a podium level.
The WS-S06CT-L suits projects where guests expect genuine lap swimming rather than only jet massage. The catalogue lists the unit at 6670 × 2380 × 1400 mm with a swim training system as standard equipment, which means the water column is long enough for continuous swimming against the current. For tighter plots, the shorter WS-S06CT keeps the same width and depth at 5880 mm overall length, so both models can share one deck detail while serving different room categories or outdoor zones.
What the catalogue specification covers
The figures below are transcribed from the published product page for WS-S06CT-L. Treat them as the starting point for your technical review, not as a substitute for confirming the final configuration with our project team.
| Model | WS-S06CT-L |
| Catalogue dimensions | 6670 × 2380 × 1400 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | 1 pc |
| Filter pump | 1 pc |
| Jet total | 31 pcs |
| LED lights | 4 |
| Total power | 8.35 kW |
| Features shown | Water jets, temperature setting, LED lighting, ozone, swim training system |
Thirty-one jets across the shell give enough variety to zone the spa — a firmer seat bank for guests with sore shoulders, gentler lines along the bench for longer soaks. The temperature setting lets operations hold a warmer hydrotherapy range in the treatment area and a cooler range in the swim lane. Ozone is listed as part of the standard feature set; ask our project team how it interacts with the sanitising regime your housekeeping or pool contractor already runs.
Options that change the commercial result
The catalogue lists optional accessories for this range: additional control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Which of these you specify affects guest experience and running cost far more than the shell itself.
- Heat pump — if the spa is to stay open through cooler months for wellness guests, confirm whether a heat pump is included in your quotation or quoted separately.
- Insulation — relevant for terraces and podium decks where pipework is exposed to wind; it also matters for energy budgeting over a full year of operation.
- UV sterilisation and sand filtration — worth reviewing against your existing water-treatment contract, so one system does not duplicate another.
- Steps — hotel guests expect a graded entry rather than a ladder; this is an accessibility point as much as a comfort one.
Availability and compatibility of these options vary by model, so the safest approach is to send your layout drawing with the enquiry and let our engineers mark up what fits the selected shell.
Site and services checks before you order
Three items cause most of the delay in swim spa installations, and none of them are the spa itself.
- Electrical supply. The catalogue shows total power of 8.35 kW for this configuration. Have your electrical contractor confirm the supply capacity, protection device and cable route at the exact installation point before production begins — and confirm the electrical requirements for the selected configuration with us in writing.
- Structural support. A filled shell of this size is a heavy concentrated load. On upper levels, the structural engineer needs the delivered weight and footprint early enough to design the bearing detail.
- Access and lifting. The unit arrives as a complete shell. Confirm the delivery route, crane or forklift access, and whether the terrace can be opened before the façade is closed off.
As part of our one-stop furniture and building materials supplier service, production, door-to-door logistics, installation guidance and after-sales support sit under one contract, so the spa does not become an orphan package managed by a separate subcontractor. For hospitality fit-outs we coordinate it alongside the rest of the scope — Swimming Pools and Swim Spas, outdoor furniture, bathroom ceramics, lighting and interior fixtures — which removes the interface risk between suppliers.
Selection summary
Choose WS-S06CT-L when the site can take a 6.67 m shell and guests expect real swim training; choose the shorter WS-S06CT when the same feature set must fit a tighter footprint. In both cases, lock down the included equipment list, the electrical requirement and the structural bearing detail before you commit to a programme date — those three confirmations are what separate a smooth handover from an expensive variation order.