A swim spa is not a catalogue item you simply add to an order. The shell has to clear the access route, the plant has to match the supply available on site, and the options that matter most — heating, sanitisation, filtration — are usually decided after the first conversation. This guide sets out exactly what we need from you to price Outdoor Swim Spa WS-PC05ST-L properly, and what you should expect back.
Start With the Application, Not the Model Number
WS-PC05ST-L sits in our configurable outdoor swim and hydrotherapy range. The catalogue specification is a starting point that we confirm line by line against your project before anything goes into production. Tell us who will use the spa and how, because that decision drives the rest of the quotation:
- Daily training. The swim training system and jet layout determine whether the swimming lane is usable for sustained laps or better suited to short sets and water walking.
- Hydrotherapy and recovery. Jet count and position matter more than shell length here, and heating capacity follows from the target water temperature rather than the shell size alone.
- Villa, resort or clubhouse installation. Finishes, lighting and how the unit presents from the deck become part of the scope, alongside how many bathers it needs to serve at once.
If you are specifying several units for a development, say so. Mixed configurations across one shipment are usually easier and cheaper to arrange than repeat orders, and we handle swim spas as part of the same one-stop furniture and building materials supply as the surrounding terrace furniture, screens, lighting and finishes.
The Catalogue Specification for WS-PC05ST-L
So that your enquiry starts from the same numbers we do, here is what the published specification shows. Treat these as the reference configuration; each line is confirmed in writing at quotation stage.
| Model | WS-PC05ST-L |
| Catalogue dimensions | 5490 × 2400 × 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 pcs |
| Total power | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Two lines on that table need your attention before you commit. The water pump is not listed in the published specification for this model, so we confirm which pump is fitted with your chosen configuration rather than assuming one. And the total power figure of 6.55 kW reflects the reference build — add a heat pump, upgrade the filtration or change the sanitisation route, and the electrical load changes with it.
Options to Decide Before We Quote
The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options for this range. Availability and compatibility vary by model, so we confirm each one against the WS-PC05ST-L shell you are ordering. Three choices carry most of the cost difference:
Heating
A heat pump keeps the water at a usable temperature outside summer, and it is the single largest addition to both the equipment list and the running load. Tell us the target water temperature and how many months a year you intend to hold it — that is what determines the capacity we quote, not the shell volume on its own.
Sanitisation
Ozone appears in the reference specification. UV sterilisation is listed as an option for the range. Commercial settings such as resort villas and clubhouses usually need a sanitisation package specified against expected bather load, so flag the setting early.
Filtration and Insulation
The reference build shows one filter pump; sand filtration is an option in the range. Insulation is worth pricing at quotation stage rather than as a later variation, because it interacts with the shell build and with how the unit performs in a cold climate.
What to Send in Your Enquiry
A complete enquiry turns around in one exchange instead of five. Please include:
- Site photographs and the clear opening dimensions along the delivery route — gate, driveway, stair or crane lift — plus the finished deck level.
- The prepared base or plinth detail, and whether the unit is to sit above ground, recessed, or partly sunken.
- Your available electrical supply: phase, voltage, and where the isolator and plant access will sit.
- Intended use and bather load — private villa, rental pool, resort or clubhouse.
- The options you want priced, with heating target and months of use if a heat pump is in scope.
- Delivery location, port or site, and whether you want door-to-door delivery arranged.
- Target programme date, so production and freight can be planned backwards from it.
If the spa forms part of a wider fit-out, send the drawings for the surrounding area as well. Coordinating the swim spa with outdoor furniture for villas and resorts, wall screens and lighting under one supplier removes the interface problems that appear when several vendors work to separate drawings.
How the Quotation Is Prepared and Confirmed
Our cooperation steps run from project brief to design proposal, then quotation and detail confirmation, before production, shipment and follow-up. For a swim spa that means:
- Brief review. We read your site information against the WS-PC05ST-L configuration and come back with questions rather than a price built on assumptions.
- Specification confirmation. Shell, equipment list, options and finishes are written out item by item. Anything the catalogue leaves open — the water pump, the electrical load after your option choices — is settled here.
- Priced quotation. Equipment, packing and freight to your named destination, with lead time stated against your programme date.
- Production and quality control once the specification is signed off, then logistics and door-to-door delivery arranged around your site access.
- Installation support and after-sales covering commissioning, inspection and spare parts. Ask for the written terms that apply to the configuration you order before you sign off.
Where a project needs something outside the published range — a different shape, an unusual access constraint, or a finish that has to match the rest of the development — our custom and OEM service covers bespoke design and prototyping alongside standard production.
Questions Buyers Ask Us at Quotation Stage
Can the unit reach my site intact?
This is the most common problem, and it is solved with information rather than equipment. Send the access route dimensions before we quote, and we confirm the delivery configuration against them.
What does installation involve on my side?
Base preparation, electrical supply and an isolator positioned for plant access sit with your local contractor. We tell you what is required at quotation stage so those trades are scoped into the programme, not discovered during it.
Can I see the wider range before deciding?
Yes. WS-PC05ST-L is one configuration in our swimming pools and swim spas category, alongside longer swim channels with separate relaxation areas and spa shells made to customised shapes for gardens and terraces. Comparing the range before you lock a specification is normal, and we will tell you plainly when a different model suits your site better.
Request a Quotation for WS-PC05ST-L
Send your site dimensions, intended use and the options you want included, and we will return an itemised quotation with the confirmed specification and freight to your destination.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Enquiry page: Contact Us