Grey is the colour most homeowners and project buyers reach for when they want a kitchen that stays quiet, clean and workable for years — and grey matte cabinets sit at the centre of that request. The trouble is that a matte grey door looks almost identical from one supplier's catalogue to the next, while the carcass behind it, the hardware inside it and the drawing that sized it can differ enormously.

A buying checklist is what closes that gap. Below is the list we work through with every residential kitchen enquiry, in the order the decisions actually have to be made. Tick each item before you sign an order, not after the doors arrive on site.

1. The scope: what exactly is being quoted

Before any finish discussion, confirm that the quotation covers the same things your drawings show. A cabinet price that excludes items you still have to buy elsewhere is not a low price — it is an incomplete one.

  • Every run on the layout: base units, wall units, tall units, pantry and any island or peninsula carcase.
  • Tall and appliance housings — oven towers, fridge housings, integrated dishwasher compartments — priced in, not left as site carpentry.
  • End panels, scribes, cornices, plinths and toe kicks, finished to match the doors on both faces where they are visible.
  • Worktop, splashback and basins: stated whether included, supplied-only or excluded entirely.
  • Interior items — shelves, drawer boxes, baskets, dividers — listed unit by unit against the layout.

2. Dimensions: whose numbers govern the build

Made-to-measure cabinetry only works if one set of numbers is authoritative. Our custom and OEM service starts from your room dimensions and elevations, and we ask for the same from every buyer: a dimensioned drawing with ceiling heights, floor-to-ceiling levels, window and door reveals, and the positions of soil stack, flues and existing services.

  • Confirm which drawing is the production reference — supplier elevation or designer layout — and have both parties initial it.
  • Record out-of-plumb walls and uneven floors as measured deviations, not as assumed straight runs.
  • Check clearances for appliance doors and drawers when they swing open into the room, including over an island edge.
  • Note the worktop thickness you intend to install, because it changes door heights and the reveal at wall units.

3. Finish: what "grey matte" actually specifies

Two buyers can order grey matte and receive completely different surfaces. Write the finish down in the same detail you would write a paint specification, and ask for a physical sample before production.

  • Undertone: warm greige, neutral or cool blue-grey. Cool greys shift green or violet against different lighting.
  • Sheen band: soft-touch matte versus a low-satin matte. The difference shows up immediately under under-cabinet lighting.
  • Surface type and how it is made — laminate, lacquer, acrylic or foil-wrapped door — since this drives cleanability more than colour does.
  • Sample size: request a full door panel or at least an A4 sample, viewed in the actual kitchen light at both day and night.
  • Direction of the grain or texture on solid-colour doors, so all doors are pressed and trimmed the same way.

Grey is not a single product in our range either. The same matte-finish collection covers white matte cabinets for brighter galley kitchens, black matte cabinets where a darker envelope is wanted, and two tone matte cabinets that pair a grey run with a lighter wall-unit colour. Choosing the whole family at one supplier keeps edge banding, sheen and hardware boring — which is exactly what you want.

4. Construction: what the door hides

The door gets the attention; the box decides how long the kitchen lasts. Ask for the construction specification in writing.

Element What to confirm on the quote
Door core and facing Board type, facing material, edge treatment. Moulded or routed doors need a different finish spec than flat slab doors.
Carcass board and thickness Panel thickness, moisture-resistant board in wet zones, and the same board throughout — not mixed by unit.
Edge banding Matching colour and thickness on all visible edges; ask whether ABS or PVC and how thick the band is.
Back fixing Grooved back panel versus stapled; this changes racking resistance once the unit is loaded.
Shelf support Adjustable pitch, shelf span and the load each shelf carries before it deflects under stacked plates.

5. Hardware: hinges, runners and the handle decision

Hardware is the cheapest place to protect a kitchen and the most expensive place to replace it later. Specify brands or grades, not the word "quality".

  • Hinges: soft-closing on every door, with the opening angle stated for corner and bi-fold applications.
  • Drawer runners: full-extension, soft-close, and a load rating matched to what the drawer will actually hold — cutlery and pans are different problems.
  • Handleless fronts: if you want the clean slab look, confirm the profile of the integrated pull or the push-open mechanism, and see a working sample drawer. Handleless matte cabinets depend entirely on that profile feeling right in the hand.
  • Corner solutions: carousel, pull-out magic corner or plain shelf — each has a different usable-depth result and a very different price.
  • Spare parts: confirm hinges, runners and any discontinued door panel remain orderable years later.

6. Layout and internal fit-out

A grey matte kitchen photographs beautifully and still fails if the working triangle fights the storage. Settle internals before the doors are cut.

  • Work sequence: store, prepare, cook. Keep the fridge-to-sink and sink-to-cook runs clear of traffic.
  • Deep drawers at the base run rather than shelf stacks — they hold more with half the bending.
  • Dedicated homes for the items you use daily, sized to those items rather than left as generic shelving.
  • Tall-unit height: full-height pantry doors are heavier than they look; confirm hinge count and the drawer weight below them.
  • Integrated lighting positions — under wall units, inside glass-front units, at toe kick — decided before drilling, with the driver located somewhere serviceable.

7. Documentation and sign-off

Production should not begin until the drawing package is complete. We treat this as a hard gate on every order, and it is worth insisting on from any supplier.

  • Signed elevations with unit codes, overall dimensions and door/finish codes on every face.
  • A cut list or 3D model that matches those elevations, issued back to you for confirmation.
  • Appliance specification sheets with cut-out dimensions, ventilation requirements and electrical loads.
  • Written confirmation of the finish sample reference you approved, quoted against the order number.

8. Packaging, delivery and site readiness

Cabinetry is damaged in transit far more often than in use, so the delivery terms belong on the checklist. Our logistics and door-to-door delivery service covers packing, container loading, freight and documentation; what we ask buyers to confirm in return is who receives the goods and when.

  • Packaging specification: edge protection, corner guards, separated doors and carcases, and a labelled carton list matched to unit codes.
  • Delivery address, access constraints and the receiving party — a site with no storage is where cabinet panels get chipped.
  • Inspection on arrival: count cartons against the packing list, open damaged cartons before signing, photograph everything.
  • Site readiness: first-fix plumbing and electrical complete, screed and plaster dry, floor levels checked — installers should not be waiting on other trades.

9. Installation, warranty and after-sales

The last items on the checklist are the ones most often left blank. Fix them while the order is still open.

  • Who installs: supplier's team, your builder or a local fitter — and who is liable for alignment and snagging.
  • Warranty scope in writing: what is covered, for how long, whether hardware is included, and what voids it.
  • Spares route: how to order a replacement door or runner later, and the lead time you can expect.
  • Cleaning guidance for the matte surface — the wrong cleaner leaves permanent shine marks on a soft-touch finish.
The short version of the checklist: scope, dimensions, written finish specification with an approved sample, construction and edge banding, hardware grades, internal fit-out, signed drawings, packaging and delivery terms, and finally installation plus warranty. Any one of these left open is where a grey matte kitchen project turns into a variation order.

How we work through it with you

SANTERSON has manufactured furniture and building materials since 2008, and kitchen cabinetry is specified per project rather than sold as a fixed module — finish, layout and dimensions are set to the space in front of us. Send us your elevations, appliance list and preferred grey sample, and we return a quotation with unit codes, construction detail and hardware schedule itemised, so you can compare it line by line against any other offer.

For whole-home work, the same cabinetry language carries across grey minimalist cabinets, wardrobes and media walls, which keeps one finish specification running through the joinery instead of three separate ones. Our turnkey solutions cover design coordination, production, delivery and installation support on villa and hospitality projects.

Have the checklist filled in before you send it — a complete enquiry gets a complete quotation. Contact PHILLIP at santerson@qq.com or by phone/WhatsApp on +86-13928214007 to start the specification.