A swim spa quote is only as good as the brief behind it. Two buyers can ask for the same Outdoor Swim Spa WS-130BⅣ-U and receive very different prices, because this model is configured rather than fixed. The information you send your supplier decides whether the number you receive covers the shell only or a working, installed spa.

Start with the site, not the catalogue

Before any equipment discussion, send the physical conditions of the location. For this model the catalog lists an overall envelope of 9950 × 3000 × 1430 mm, so your supplier needs the clear internal dimensions of the deck, terrace, courtyard or plant room where it will sit, plus the access route from the delivery vehicle to that spot. Tell us whether the spa is above ground, semi-recessed or fully recessed, and whether a surround, coping or decking will be built around it by others.

Also state what sits under the spa: a reinforced concrete slab, a ground-floor room, an upper floor or a roof deck. A filled shell of this size is a heavy water load, and structural sign-off belongs to your engineer. We can supply the operating weight and point loads for that calculation, but we cannot design the support.

Confirm which configuration you are quoting

Model suffixes matter. In our catalog the WS-130BⅣ-U entry lists water jets, LED lighting and ozone as its shown features, while the closely related WS-130BⅣ entry additionally lists a swim training system. Please confirm which variant you want in writing, because the swim function changes pumps, power and price. The catalog figures for the WS-130BⅣ-U are:

Model: WS-130BⅣ-U  |  Catalog dimensions: 9950 × 3000 × 1430 mm
Control system: 1 set  |  Water pump: 4 pcs  |  Filter pump: 1 pc
Jet total: 23 pcs  |  LED lights: 5  |  Total power: 11.85 kW
Features shown: water jets, LED lighting, ozone

Treat these as catalog figures for the standard configuration, not as a promise about your finished unit. Send us your required feature list and we will quote against it line by line.

List the options you want priced separately

Catalog-listed additions for this range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Send each one as a separate line so you can compare what the base unit includes against what costs extra. Insulation and a heat pump in particular change running behaviour in cooler climates, so mention your local climate and whether the spa will be used year-round.

Send the electrical and services information

This is where most quotes stall. The catalog shows total power of 11.85 kW for this configuration, so we need to know:

  • Supply voltage and frequency at the site, and whether three-phase supply is available.
  • Where the main distribution board is relative to the spa, and who runs the dedicated circuit and isolator.
  • Whether a local electrician must work to a specific wiring standard, so we can match the connection arrangement rather than guess it.
  • Water inlet location, drain or waste point, and whether filling is by mains hose or a fixed connection.
  • Any requirement for drainage falls, overflow or pump-out arrangements in your setting.

If you can send a marked-up plan or photograph of the location with these points noted, we can usually return an accurate quotation faster than through several rounds of email questions.

Tell us who is responsible for what on site

ItemWhat we need from you
DeliveryFull delivery address, port of entry if applicable, and whether the site accepts a container or a large goods vehicle.
Offloading and placementWho provides the crane, forklift or manpower to move the shell into position, and any access restrictions on the day.
Civil worksSlab, recess, waterproofing, tiling and decking scope, and which contractor carries it out.
CommissioningWho energises, fills and tests the unit, and whether you want our guidance during that stage.
Maintenance accessWhether equipment access panels must remain reachable, which affects recess design.

Clear responsibility boundaries stop the two most common problems on swim spa projects: a shell that arrives before the slab is ready, and an electrical installation that cannot serve the agreed configuration.

Project context shapes the rest of the package

Tell us whether this is a private villa or a hotel, resort, gym or club. Commercial settings usually bring higher usage, additional control and hygiene requirements, and coordination with other fit-out trades. As a one-stop furniture and building materials supplier, we often place a swim spa alongside outdoor lounge furniture, pergolas, wall finishes and bathroom fixtures for the same project, which is why our services run from design consultation and production through logistics, installation support and after-sales.

If your project also needs surrounding furniture or finishes, send those requirements in the same enquiry. Our Custom & OEM Service covers bespoke sizing and finishes, so a single coordinated package is usually easier to manage than several separate orders.

A short checklist you can paste into your enquiry

  • Model and suffix exactly as required (WS-130BⅣ-U or WS-130BⅣ), plus your feature list.
  • Site photos, a dimensioned plan, and the installation method (above ground, semi-recessed, recessed).
  • Voltage, phase availability, and distance to the distribution board.
  • Water supply, waste and drainage details.
  • Delivery address and access constraints.
  • Who handles civil works, offloading, electrical connection and commissioning.
  • Target programme date and whether the project is private or commercial.
Please note: catalog dimensions, power figures and jet counts refer to the standard configuration shown on the product page. Confirm the specification of your selected configuration before ordering, and have structural support and electrical work checked by your local engineer and licensed electrician.

Send us the model reference, your site drawings and the checklist above, and we will return a quotation that states clearly what is included in the unit, what is optional and what remains with your site contractor. Enquiries about this model can reference Outdoor Swim Spa WS-130BⅣ-U directly, and you can review the wider range on our products page.