A swim spa in a hotel is not a single product purchase — it is part of the wellness area, and every decision around it touches structure, services and daily operations. When a leisure team or main contractor evaluates Outdoor Swim Spa WS-PC05ST, the model name is only the starting point. What matters at handover is whether the shell fits the allocated slab, whether the plant room and power supply match what the unit actually needs, and whether one supplier can carry the swim spa through the same coordination process as the rest of the fit-out.
This guide walks through the selection sequence we recommend for hotel and resort projects: fixing the footprint first, reading the equipment list honestly, planning the services interface, and then confirming the configuration with the factory before order placement.
Start With the Footprint, Not the Finish
WS-PC05ST is catalogued at 5000 × 2400 × 1470 mm. That single line drives three separate decisions on site.
- Structural allocation. A filled shell of this size is a heavy concentrated load. The slab, deck or terrace structure must be designed for the wet load plus occupancy, not just the dry shipping weight. Give the structural engineer the catalogue dimensions early, and confirm the filled weight with us before the slab is poured.
- Circulation around the shell. Guests need a clear approach, and maintenance needs access to the equipment compartment. A unit placed flush against a boundary wall becomes expensive to service. Allow working space on the pump and control side.
- Water depth versus user profile. At 1470 mm overall height the shell suits standing hydrotherapy and swim training rather than diving or full family swimming. If your brief calls for lap swimming over a longer distance, a longer model from the Swimming Pools and Swim Spas range will serve guests better — and we would rather tell you that at quotation stage than sell the wrong shell.
Reading the WS-PC05ST Specification
The figures below are what our catalogue records for this model. Treat them as the baseline configuration, because options change both the equipment list and the power draw.
| Model | WS-PC05ST |
| Catalogue dimensions | 5000 × 2400 × 1470 mm |
| Jet total | 6 pcs |
| Filter pump | 1 pc |
| Control system | 1 set |
| Swim training system | 1 set |
| LED lights | 4 pcs |
| Total power (catalogue) | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Two points deserve attention in a commercial context. First, six jets across a shell of this size is a hydrotherapy provision, not a high-intensity jet layout; if your wellness concept promises a heavy massage experience, compare the jet count against other models in the range before specifying. Second, the catalogue figure of 6.55 kW reflects the listed configuration. Adding a heat pump or upgrading the water pump changes connected load, and electrical design should follow the final specification sheet — never the brochure number.
Options That Change the Specification
The catalogue lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options. For a hotel, three of these usually move from "optional" to "specified":
- Heat pump. A spa used year-round has to hold water temperature without an outsized energy bill. Specify the heat pump at quotation so it appears on the same electrical schedule as the rest of the plant.
- Ozone plus UV sterilization. Commercial bather loading is very different from domestic use. Ozone is shown as standard on this model; adding UV supports water quality between filter cycles and reduces chemical demand in a heavily used facility.
- Insulation and steps. Insulation matters wherever overnight temperatures drop, and it directly affects running cost. Steps are an access and safety item — in a guest-facing area the entry detail should be reviewed with your accessibility requirements, not left to the standard catalogue option.
The Services Interface You Must Plan Early
Most swim spa problems on hotel projects are not faults in the shell — they are gaps between disciplines. Before the unit is ordered, these items need an owner on your project programme:
- Power. Dedicated supply, protection and a local isolator, sized to the final specification including any heat pump. Confirm voltage and phase for your country at the enquiry stage.
- Drainage and overflow. A drain point near the shell makes periodic draining practical; without it, housekeeping cannot empty the spa without pumping.
- Foundation and levelling. A level, load-rated base is a condition of warranty on shells of this type. State clearly in the contract who prepares and signs off the base.
- Ventilation and enclosure. If the swim spa sits inside a wellness room or under a pergola, moisture extraction has to be designed around it.
- Access for installation. The delivery route from the truck to the final position — gate widths, crane or forklift access, overhead obstruction — should be checked before the unit arrives, not on the day.
Why Buying the Swim Spa Inside a Turnkey Package Helps
On most of our hospitality jobs the swim spa is one line among dozens: outdoor lounge settings, pergolas and daybeds on the same terrace, tiling, screens, lighting, cabinetry and bathroom fixtures in the rooms behind it. When these come from several suppliers, each one assumes someone else coordinated the interface — the base, the power, the waterproofing upstand, the handover date.
SANTERSON is a China-based furniture and building materials manufacturer that supplies hospitality and villa projects under one roof, covering design consultation and space planning, custom and OEM production, logistics with door-to-door delivery, installation support and after-sales service. Our Hospitality Project Furnishing service runs a defined workflow — consultation, design and planning, production, logistics, installation, after-sales — so the swim spa, the poolside furniture around it and the interior fit-out behind it sit on one production schedule and one coordination contact. For procurement teams that means fewer interface gaps and one set of shipping documents rather than six.
A Pre-Order Checklist
Confirm these before you release the purchase order:
- The structural engineer has the catalogue dimensions and the confirmed filled weight for the final configuration.
- Jet count, swim training unit and LED provision match the guest experience your concept promises.
- Heat pump, UV sterilization, insulation and steps are priced in or explicitly excluded, so the electrical schedule is complete.
- Voltage, phase and dedicated circuit requirements for your country are stated on the order.
- The scope split for base preparation, power connection and commissioning is written into the contract.
- Delivery route and final installation position have been surveyed.
- Spare-parts and after-sales contact are recorded before handover, so housekeeping knows who to call.
If you are specifying a swim spa for a hotel, resort or villa wellness area, send us the allocated area, your target configuration and the country of installation. We will confirm which model in the range fits — WS-PC05ST or a closer alternative — with an itemised specification sheet, equipment list and power requirement, so your engineers are designing against real numbers.
Talk to our project team about swim spas and poolside furnishing for your hotel fit-out. Email santerson@qq.com or contact us through the Contact Us page — quote your project location and installation area for a configuration proposal.