A pair of classic French double doors looks simple on a drawing: two leaves, glazed lights, a shared frame. In practice it is one of the more coordination-heavy items in a villa or apartment fit-out, because the opening, the floor finish, the hardware and the joiner all have to agree before anything is cut. OEM sourcing is how buyers get that agreement made in the factory instead of on site. This article walks through what the process actually involves, using our Classic French Double Doors as the reference item.
What OEM sourcing means for doors
OEM (original equipment manufacturer) sourcing means your drawings, dimensions and finish schedule drive production, and the factory builds to your specification rather than offering you a catalogue size. For interior doors this matters more than buyers expect: openings in refurbished villas and apartment towers rarely match one another, wall build-ups differ between partitions, and floor levels shift once tiling and screed are in.
Our French doors collection is built around that reality. Each item is described as being designed for residential door projects where the finish, layout and dimensions are specified per space, with made-to-measure sizing and material and finish options. The same approach covers the wider range, from Santerson Arched French Doors to Santerson Modern Slim Frame French Doors, so a project can mix profiles without changing supplier.
The OEM process, stage by stage
Our Custom & OEM Service covers custom furniture design and prototyping, bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities and brand customisation. Applied to a door package, the sequence looks like this:
- Brief and drawings. You send opening sizes, elevations and the room schedule; we review them against the door type you have chosen.
- Specification. Leaf construction, glazing type and divided-light layout, frame detail, edge profile, finish sample, ironmongery preparation. This is where a classic profile is usually adjusted rather than accepted as-is.
- Prototyping or first-article review. For a new profile or an unusual finish, the sample is confirmed before the full set is committed.
- Production and quality control. The whole door set — leaves, frames, architraves, linings — is produced together so finishes and material behaviour travel together.
- Packaging, freight and handover. Doors ship with the rest of the joinery package where possible, through our logistics and door-to-door delivery service.
The commercial step that surprises first-time buyers is the quotation. A door price means little without knowing whether frames, architraves, glazing beads, ironmongery preparation and hanging direction are inside it. Ask for the inclusions list before comparing two quotations; a lower figure usually means fewer of those items are included.
What to confirm before production starts
| Item to confirm | Why it decides the outcome |
|---|---|
| Opening width, height and wall thickness | Frames are built to the finished wall build-up. Measure once plasterboard, screed and the final floor finish are accounted for. |
| Floor level and threshold detail | Determines the under-leaf gap and whether a sill or threshold piece is needed at the opening. |
| Which leaf carries the lock, and hanging direction | Reversing this after production is not a small correction. State it on the schedule for every opening. |
| Glazing: light layout, glass type, glazing bead detail | Divided-light spacing changes the character of a classic door more than the frame profile does. |
| Finish sample and grain direction | Painted, lacquered and veneered doors each behave differently on edges and mouldings; approve a physical sample. |
| Ironmongery cut-outs and hinge preparation | Lock bodies, hinges and door furniture should be prepped in the factory if you are supplying them. |
Product pages for this range state made-to-measure sizing and finish options, and they also carry a standing instruction to confirm dimensions and selected specifications for each project. Treat that as binding: we do not publish fixed sizes or fixed technical figures for these doors, because the correct values come from your opening schedule.
Buying doors as part of a package, not as a line item
Doors rarely fail on their own; they fail where they meet something else — a wardrobe return, a wall panel, a skirting run, a stone threshold. When joinery, panelling and doors come from one manufacturer, profiles and finishes are cut in the same shop and the interfaces get resolved once instead of three times.
That is why we work as a one-stop furniture and building materials supplier. A door package normally travels alongside wardrobes, kitchen cabinetry, wall panelling, flooring and lighting on the same project. For buyers sourcing from Australia, our turnkey solutions cover villa and hospitality projects end to end, and published case references include villas in Sydney, Melbourne, Perth, Willoughby and North Turramurra. Those are project locations we have worked on — not a claim of a local office, or of certification against any particular national code.
Common questions
Can I supply my own ironmongery?
Yes. Send the hinge and lock-body data with your order so cut-outs and preparation are done in production. If the hardware is not yet selected, we can leave the openings blank and mark the schedule for site preparation.
Is a classic French double door suitable as a room divider as well as an entrance?
The collection covers both uses. What changes is leaf construction, glazing choice and hardware set, so state the intended use when you specify rather than after.
How many openings make an OEM order worthwhile?
Our service describes flexible minimum order quantities, so a single villa stairwell can work as well as a multi-unit package. Share the quantity and we will confirm what is practical.
Do you publish standard dimensions for these doors?
No. The range is made to measure, and each project's dimensions and selected specifications are confirmed with us before production.
Where to start
If you have a door schedule ready, send it over with the finish references for the project. If the design is still open, our interior design services cover space planning and layout before anything goes into production. Either way, browse the full windows and doors range first, so you know which profiles can be mixed on one order.