A single round mirror cabinet rarely looks difficult to ship. It is one box, one line on the purchase order, and yet it sits directly above the basin, against a finished wall, and has to arrive without a chipped edge or a cracked mirror. When the same item is part of a residential bathroom package that travels from our factory in China to a site overseas, delivery planning starts long before production begins. This guide walks through how we prepare a project order for the Santerson Round Mirror Cabinet so that it reaches your site complete, correctly specified and ready to install.

Why a made-to-measure mirror cabinet needs delivery planning before production

The round mirror cabinet is not a stock item pulled from a warehouse shelf. Its finish, layout and dimensions are specified for each space, which means the order is cut to your drawings. A measurement taken on site that never reaches the workshop cannot be corrected once the carcass is machined, and a correction after shipment means either a second production run or an on-site compromise nobody wants.

That is why we treat delivery as part of the order, not as the step after it. Before the first panel is cut, your team and ours agree on three things: the confirmed dimensions of every unit, the room layout showing where each cabinet hangs in relation to the basin, tapware and tiling lines, and the date the units must be on site so that wall finishes, plumbing and joinery installers are not waiting on one another.

Step 1: Lock the specification while there is still time to change it

For each bathroom in the project, we ask for the same set of information so that nothing has to be guessed during production:

  • Confirmed opening and fixing dimensions — wall-to-wall width, ceiling height, and the position of the basin centre line and water supply.
  • Finish selection — the material and finish you have chosen, recorded against the same reference used for your vanities and cabinetry so the whole bathroom matches on site.
  • Layout and internal configuration — shelf positions and storage arrangement for each unit.
  • Electrical position — where the supply is set out, which matters most if your project uses a lit unit; electrical specification is confirmed per project before production.
  • Quantity by room — a room-by-room schedule rather than one total figure, so partial deliveries and site sequencing stay possible.

If your bathroom package also includes other sanitary fixtures, we coordinate them as one order. The Santerson LED Mirror Cabinet, the Tall Mirror Cabinet and the Standard Mirror Cabinet are configured the same way, so a project that mixes round units in the main bathroom with tall units in the ensuite is produced, packed and shipped as one coordinated set.

Step 2: Choose the shipping route against your site programme

Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail. For a bathroom package on a residential project, the route is chosen against your site programme rather than habit:

  • Sea freight suits full bathroom packages ordered together with cabinetry, flooring or other fit-out items, where the units can share a container and the programme allows production time.
  • Air freight suits a small number of replacement or late-added units, where the value of keeping the site on schedule outweighs the freight cost.
  • Rail sits between the two on eligible corridors and is worth pricing when sea transit is too long and air is not justified.

We do not quote a transit time as a promise. Every project has its own port, clearance route and delivery window, so the schedule we give you is confirmed for your specific order and destination, and it is written down with the quotation.

Step 3: Pack mirror-fronted units for a long journey

A mirror cabinet carries three things that travel badly: a glass front, a mirrored door surface, and a square-edged carcass that shows every knock. Packing is therefore specified with the order rather than left to the packing line. Units are protected edge to edge, separated so that no two finished faces touch, and crated so they can be lifted and stood upright in the sequence they will be unloaded at the site.

Two practical decisions made at this stage save a great deal of trouble later:

  • Carton and crate markings that match your room schedule. Each unit is labelled with the room it belongs to, so the crew on site does not sort through crates trying to work out which cabinet is for which bathroom.
  • Loading order set by installation order. The units needed first are loaded so they come off first. On a multi-apartment or multi-villa job this keeps the bathrooms being fitted first from being buried at the back of the container.

Step 4: Prepare customs documents that describe what is actually in the crates

Documentation errors are the most common cause of a delivery sitting at the port. We prepare the commercial invoice, packing list and certificate of origin for your order, along with any import paperwork your country requires, and we keep the descriptions consistent across every document: same product names, same quantities, same values. A packing list that lists "12 units" while the invoice shows a room-by-room breakdown invites questions nobody needs to answer.

Cargo insurance is available as an option on the shipment, and a dedicated logistics coordinator follows the order from production through to delivery, so there is one point of contact for tracking rather than a chain of forwarders. Import duties, Incoterms and clearance requirements differ by destination, and we confirm those terms with you case by case before the order is confirmed.

Step 5: Sequence the delivery so the cabinets arrive when walls are ready

A mirror cabinet cannot be installed before the wall tiling, the set-out of the water supply and the electrical position are finished. Arriving too early means crates standing in a dusty site for weeks; arriving late means the bathroom cannot be signed off. We schedule the delivery against your site programme and keep you informed while the shipment is in transit, so the receiving date can be booked with your installers.

On arrival we ask your team to check each crate against the packing list before the installers open them — door faces, corners and glass condition recorded on the day of receipt. Our installation and after-sales support covers inspection and snags, spare parts and replacement, so if a unit is damaged in transit we deal with it against that record instead of arguing about what happened.

A short checklist before you place the order

  • Room-by-room schedule with quantities, dimensions and finish references signed off.
  • Basin, tapware and tiling set-out drawings shared with us before production.
  • Electrical requirements confirmed for any lit units in the package.
  • Required on-site date agreed, and the freight route chosen against it.
  • Incoterms, duties and import paperwork confirmed for your destination.
  • Receiving and inspection responsibility named on your side for delivery day.

Planning the delivery around a single made-to-measure product sounds like extra work at the start of a project. In practice it is what keeps one small item from holding up an entire bathroom handover. If you are specifying mirror cabinets for a residential or hospitality project, send us your room schedule and drawings and we will confirm the specification, packing plan and delivery route for your order.

Talk to us about your bathroom package — contact SANTERSON, phone / WhatsApp +86-13928214007, email santerson@qq.com.