An outdoor swim spa is not a parcel. The WS-S10-T leaves the factory at catalogue dimensions of 10000 × 2200 × 1420 mm, and it has to arrive intact on a villa terrace or a resort pool deck thousands of kilometres from the loading dock. At that size the delivery plan matters as much as the shell itself. Below is how we structure an international project order for the Outdoor Swim Spa WS-S10-T, from configuration sign-off to handover on site.

Start with the configuration, not the container

The WS-S10-T is a configurable unit, and every option you choose changes what ships, how it is crated and what the site electrician has to be ready for. The catalogue specification for this model lists a single control system, one swim training system, two water pumps, one filter pump, 76 jets in total, LED lighting with 40 small lights, ozone sanitisation and a total power figure of 7.65 kW.

  • Catalogue dimensions: 10000 × 2200 × 1420 mm
  • Total power (catalogue): 7.65 kW
  • Jet total: 76 pcs; water pump 2 pcs, filter pump 1 pc
  • Catalogue options: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps

Confirm the selected configuration in writing before production starts. A heat pump, a sand filter or an added set of steps each adds volume and weight to the shipment, and a specification agreed after the shell is made usually means either a second consignment or a change order. If your site conditions call for something outside the standard range, our Customizable Shape Outdoor Spa line covers square, round, oval and curved layouts in an acrylic shell with structural reinforcement.

Match the site to the unit before it is built

Send us the pool-deck drawing, a photograph of the access route and the electrical supply details for the location. We check three things against those documents: whether the footprint and 1420 mm catalogue depth suit the prepared plinth and drainage; whether the delivery path — gate width, turning radius, lift or crane access — can take a crate of this size; and whether the supply at the site can carry the installed equipment load for the configuration you have chosen. Electrical requirements are confirmed for the selected configuration rather than assumed from the catalogue power figure.

This step avoids the delays that come from site conditions being discovered after production starts, and it costs nothing to do early. Once the site conditions are agreed, we can lock the production slot and the shipping plan at the same time.

Packaging, container loading and the shipping mode

Long spa shells travel in export crating designed around the shell geometry, with the pumps, control system, jets and lighting packed so that they can be inspected and installed without unpacking the whole unit. We arrange the container loading at the factory rather than leaving it to the forwarder, because a badly loaded long crate is a common cause of transit damage on this product type.

Our Logistics & Door-to-Door Delivery service covers sea, air and rail freight forwarding, commercial invoices, packing lists, certificates of origin and the customs paperwork your import requires, plus shipment tracking through to the delivery address. For a project order we normally quote both port-to-port and door-to-door so you can compare landed cost against what your own forwarder offers. Cargo insurance options are available, and Incoterms, duties and transit time are set case by case for the destination — we do not publish a single blanket figure.

Customs clearance and the receiving party

Name the importer of record before the goods are loaded. We prepare the shipping documents to match that party, which keeps clearance moving; a mismatch between the invoice consignee and the entity actually clearing the cargo is a frequent cause of demurrage charges on bulky goods sitting at the port. Tell us early if your country requires an import permit or a specific declaration for pool equipment, so the paperwork is prepared with the packing list rather than after arrival.

Agree the delivery appointment and confirm who will be on site to receive the crate, with enough people and equipment to move it off the vehicle. A unit this long cannot be left at a kerbside for someone to sort out later.

Inspection on arrival, then installation and handover

Open the crate together with your site supervisor, photograph the shell and check the equipment list against the packing list while the packaging is still available. We handle inspection and snags through our Installation & After-sales Support service, along with spare parts and replacement for components such as jets, pumps and lighting, plus ongoing maintenance guidance. Warranty coverage is confirmed per order in writing, so the terms that apply to your project are on record rather than inferred from marketing material.

Commissioning follows the sequence agreed at the specification stage: fill, run the filtration and sanitisation circuit, test each jet bank and the swim training system, then verify the control readings under load. Handover is complete when your team has the equipment list, the wiring arrangement for the installed configuration and the maintenance notes.

A short checklist before you place the order

  • Configuration signed off: jets, pumps, control system, swim training system, and any of UV sterilisation, heat pump, sand filtration, insulation or steps
  • Site drawing, access photographs and supply details sent to us
  • Importer of record named; permit requirements declared
  • Incoterms, insurance and delivery address agreed on the quotation
  • Receiving crew and lifting arrangements booked for the delivery date
  • Inspection, snag list and commissioning sequence agreed with your site team

Ordering through a one-stop project supplier

Swim spas rarely arrive alone on a project. The same villa or resort order usually needs outdoor furniture for the surrounding deck, and consolidating those lines with the spa into one coordinated shipment saves both freight cost and receiving effort. As a China-based one-stop furniture and building materials supplier, we manufacture to order through our custom and OEM process, then coordinate production, freight and site coordination under a single project contact — see the One-stop Solution page for the full workflow.

Send us the model you are specifying, the destination city and your site drawings, and we will return a configuration sheet, a landed-cost comparison covering the shipping options above, and an available production slot.