A swim spa is not a shelf item. Two projects asking for the same model can end up with different configurations, different shipping arrangements and very different prices. If you are evaluating the Outdoor Swim Spa WS-S38 for a villa, resort or residential development, the quality of your first quotation depends almost entirely on how much usable information you hand the supplier. Below is the practical checklist we work from when preparing a WS-S38 quotation, so you can send one clear enquiry and compare like-for-like offers from every vendor.

1. The model and the configuration you actually want

Start with the exact model name — WS-S38 — rather than a photo or a general category. Model numbers are what let a supplier pull the right shell, pump set and jet layout from production records. For reference, the published catalogue entry for this unit lists external dimensions of 3760 × 2080 × 1110 mm, one control system, three water pumps, one filter pump, 51 jets including six water columns, LED lighting (four main lights plus twelve small LEDs), and a total power figure of 14.05 kW. Treat these as catalogue baselines: the final specification follows whatever you select, and the supplier will confirm the equipment list and electrical requirements for that configuration in writing.

Tell the supplier which features matter to you. The WS-S38 page shows water jets, LED lighting, ozone sanitation and a waterfall as standard highlights. Optional items in the range include an upgraded control system, UV sterilisation, additional water pumps, a heat pump, sand filtration, extra insulation and access steps. Each option moves the price, so list what you want included and what you are prepared to source locally.

2. Site conditions: where the unit will sit

Send a simple site plan or a few photographs together with the key measurements. The supplier needs to know whether the spa goes on a reinforced slab, a raised terrace, a garden deck or a semi-recessed pit, because that affects the base detail, the access steps and how the cabinet is delivered and lowered into place. Include:

  • Clear opening dimensions and the route from the delivery vehicle to the final position
  • Slab or substrate type, and whether a structural engineer has confirmed the load case
  • Distance from the spa location to the electrical panel and to a drainage point
  • Whether the area is exposed to wind, salt air, heavy snow or direct afternoon sun

This information also decides whether a standard rectangular shell is the right answer at all. Where the plot is irregular or the design calls for a square, round, oval or curved outline, it is worth asking about a customizable shape outdoor spa instead of forcing a standard model into an awkward space.

3. Power, water and drainage specifics

Electrical mismatch is the most common cause of rework on swim spa projects. Give the supplier your local supply details: voltage, phase (single or three), frequency, and the breaker/fuse arrangement available at the panel. A unit in this range draws a substantial connected load, so ask the supplier to confirm the required circuit size, cable run expectations and whether a dedicated isolator is needed on site.

Also state how the spa will be filled and drained, how often the water will be treated, and whether you want ozone, UV or sand filtration in the quoted scope. Heating intent matters just as much: an unheated garden spa in a mild climate and a year-round heated spa used for daily training need different insulation packages and heat pump sizes.

4. Intended use and expected duty cycle

A private villa, a hotel wellness floor and a residential development clubhouse put very different demands on the same shell. Tell the supplier who will use the spa, roughly how many users per day, and whether it will run for lap swimming, hydrotherapy and massage, or children's play. That drives jet selection, seating layout, water feature choices and the durability of finishes.

Where fitness laps are a priority, ask the supplier to confirm in writing which configurations in this range provide a swim training system and what that system consists of — it is not itemised for every model, so treat it as something to verify rather than assume. If your brief leans toward massage-focused leisure with strong water features and lighting, ask for a luxury outdoor swim spa with massage jets, LED and water features from the same catalogue to be quoted alongside the WS-S38, on an identical option list, so the comparison is honest.

5. Quantity, timeline and project stage

One unit for a single villa and ten units for a resort phase are different manufacturing conversations. State the quantity you are targeting, any phased delivery plan, and the date your site needs the units on the ground. Add whether your design is still being fixed or already tendered — suppliers handle an enquiry differently when drawings are frozen versus when finishes may still change.

6. Delivery terms and after-sales expectations

Swim spas ship as bulky, high-value cargo, so delivery terms change the real cost more than most buyers expect. Give the supplier the delivery city or port, and tell them which Incoterms you work with. SANTERSON's logistics service covers sea, air and rail freight forwarding, customs paperwork, packaging and container loading, tracking and door-to-door delivery; your enquiry should say whether you want that full arrangement or a simpler port-to-port quote so you can appoint your own forwarder.

Also set out what you expect after installation: commissioning support, spare parts availability, warranty scope and who performs the on-site work. Ask the supplier to state these terms in the quotation itself rather than in a separate document you have to chase later.

7. Budget range and decision criteria

A rough budget band is useful. It lets the supplier propose an option set that fits instead of quoting everything at maximum specification, and it surfaces where money can be saved — insulation grade, filtration type, lighting count — without touching the shell or the core pump package. If your decision will come down to life-cycle running cost rather than purchase price, say so, and ask for the power and equipment list that supports that comparison.

A ready-to-send enquiry template

Copy this into your message and fill in what you know; note anything you do not know rather than leaving it blank, because a supplier can advise on gaps but cannot read them.

Model of interest: Outdoor Swim Spa WS-S38
Quantity and phasing: ___
Project type: private villa / hotel / resort / residential development
Site: country, city, ground condition (slab, deck, terrace, pit), access route notes
Required options: heat pump / UV / sand filtration / insulation / steps / control system
Feature priorities: jets, swim use, waterfall, lighting
Electrical supply: voltage, phase, frequency, panel location
Water fill and drainage: ___
Delivery: destination city or port, preferred Incoterms
Target on-site date: ___
Budget band and decision criteria: ___
Drawings available: yes / no / draft

What a complete quotation should contain

Before you compare bids, check that each one answers the same questions: confirmed model and dimension set; itemised equipment list with pump, jet and lighting counts; the options included and excluded; electrical requirements for your supply; packaging and container plan; delivery terms and destination; lead time from payment to dispatch; warranty and spare-parts terms; and a named contact who stays with the order through production and shipping. If any of these are missing, send one clarification round before you treat the prices as comparable.

Send that level of detail once, and the WS-S38 quotation you receive will be specific enough to act on — and easy to place side by side with every other offer in your tender file. Share your site details and target configuration with our team and we will confirm the specification, options and delivery plan for your project.