Open storage looks simple on a drawing. A shelf, an alcove, a run of cubbies — and then the site question arrives: who is actually manufacturing it, to what size, in what finish, and how does it arrive with the rest of the fit-out? If your project includes Santerson Open Storage or any of the related open shelving and storage wall systems, the supplier's answer to those questions matters more than the brochure photograph. This article sets out what to check before you commit an order.

What "configurable" actually commits you to

The open storage listings in the Santerson catalogue are described as configurable: finish, layout and dimensions can be specified for each space, with made-to-measure sizing and material and finish options. That is a strength for project work, because bathroom joinery rarely fits a standard module — but it also means the product is only as well defined as the documentation behind your order.

Ask the supplier to confirm, in writing and per configuration, the dimensions and set-out drawings, the substrate and finish specification, edge treatment, the hardware being used, and how the unit is meant to be fixed and installed. For open shelving in particular, ask what loading each span is intended for and how that was determined. The catalogue pages themselves carry the same instruction: dimensions, materials, loading and installation requirements are verified per selected configuration rather than assumed from a model name.

Check 1 — Does the supplier make it, or resell it?

SANTERSON presents itself as a China-based furniture and building materials manufacturer and one-stop solution provider, operating since 2008, with custom and OEM service described on its own pages. That is a meaningful distinction from a trading intermediary: the same organisation that cuts panels and applies finishes also handles prototyping, material selection and production coordination.

For an open storage package this matters in practical ways. Made-to-measure work generates changes — a reveal that moves, a finish substitution, a shelf height that shifts once the basin and countertop are set out. A manufacturer can absorb those revisions inside one production plan; a reseller passes them on as a variation with a delay attached. When you request a quotation, ask which factory the joinery is produced in, who signs off the shop drawings, and how revisions are priced and timed.

Check 2 — Can they hold one specification across several product families?

Open storage almost never travels alone. In a bathroom package it sits alongside vanities, mirror cabinets, tall cabinets and ceramics; in a living area it becomes part of a media wall or an integrated storage wall. If those items come from different suppliers, the visible lines, panel thicknesses and finishes will not match, and that mismatch is permanent.

SANTERSON's catalogue spans bathroom storage units and open shelving — Corner Storage, Drawer Units and Freestanding Open Shelves among them — plus built-in wall systems such as Full Height Storage Walls and Mixed Open & Closed Storage, together with sanitary ware, lighting, cabinetry, flooring and wall finishes. Test the supplier's consistency claim by sending them one finish across three families — an open storage unit, a tall cabinet and a media wall — and asking whether the same board, edge band and lacquer specification applies to all three.

Check 3 — Who coordinates the drawings, production and site?

The company's service pages describe a staged workflow: consultation, design and planning, production, logistics, installation and after-sales, with project design coordination covering drawings, production coordination and on-site guidance. What you want to establish is whether that sequence is delivered by one named coordinator for your job or split across departments you each have to chase.

A concrete way to test it: ask for the drawing revision process for an open storage run — who issues the shop drawing, who marks up the site dimension, and what happens when the two disagree. Suppliers who do this routinely answer with a process. Suppliers who do not answer with names and stages.

Check 4 — Logistics and handover, not just manufacture

Open storage units are long, flat and easily damaged at the edges, which makes packaging and container loading part of the product specification rather than an afterthought. The logistics pages describe freight forwarding by sea, air and rail, customs paperwork including commercial invoices, packing lists and certificates of origin, packaging and container loading, shipment tracking and door-to-door delivery.

Confirm for your specific order: the packing method for panel edges, how the joinery is loaded relative to heavier items such as ceramics, who prepares which documents, and what "door-to-door" covers at your end — delivery address only, or placement and unpacking. Import terms, duties and transit arrangements should be settled case by case; do not carry a general marketing statement into a contract.

Check 5 — What happens after handover

The installation and after-sales pages list on-site installation, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance. Read those as a scope to be pinned down rather than a promise already given: ask which of them apply in your country, whether installation is by the supplier's own team or a local contractor they brief, what the warranty actually covers on finishes and hardware, and how a replacement panel for an open storage bay is ordered years later when the original configuration is long gone.

A short pre-order checklist

  • Shop drawings signed off against site dimensions, including reveals, skirting and any basin or countertop interface.
  • Written specification per configuration: substrate, finish system, edge treatment, hardware, fixing method.
  • Stated intended loading for open shelves, with span and thickness noted.
  • One finish specification shared across storage units, tall cabinets and wall systems, confirmed by the same source.
  • Named coordinator for drawings, production queries and site coordination.
  • Packing and loading method for panelised goods, plus a document list matched to your import route.
  • Warranty scope, spare-part route and installation responsibility stated in the order documents.

Suppliers working on villa, hospitality and office projects — including Australian residential references such as the villas at Willoughby, Perth, North Turramurra, Melbourne and Sydney shown in the project case listings — will normally be able to answer all seven points without hesitation. If the answers are vague on any of them, the risk is not the open storage unit itself; it is everything downstream of it.

Bringing it together

A supplier who can support your Santerson Open Storage requirements will demonstrate four things: direct manufacturing control, one specification held consistently across related product families, a named coordination path from drawing to site, and after-sales terms written down rather than implied. Assess the supplier against those, and the configurable nature of open storage stops being a risk and becomes the reason it fits your project at all.

Project enquiries about bathroom storage units, integrated wall systems or a wider furnishing package can be discussed with the SANTERSON team through the contact page.