Two tone melamine cabinets are one of the easiest ways to give a kitchen depth without committing to a full palette of custom finishes. A darker lower run grounds the room, a lighter upper run keeps sightlines open, and the melamine surface itself is the workhorse finish that most residential and hospitality kitchens specify day in, day out. The difficulty is rarely the look. It is the ordering: how many linear metres of which door, how carcasses pair with those doors, where the transition between the two tones falls, and what has to be agreed before production starts so that nothing arrives on site in the wrong size or the wrong shade.

This guide walks through quantity planning and product coordination for Two Tone Melamine Cabinets, using the way we actually build them at SANTERSON — made to measure, finish by finish, layout by layout, for each project.

What a two tone melamine specification actually consists of

Before quantities make sense, it helps to separate the parts that carry the design from the parts that only carry the load. A cabinet order is normally split into these groups:

  • Doors and drawer fronts — the visible faces, and the only elements that need to be split between your two tones.
  • Carcasses and boxes — the boxes behind the doors. Their interior and exterior surfaces are usually specified in one coordinating tone or a standard board colour.
  • Worktop, splashback and trims — separate materials with their own lead times and their own measurement requirements.
  • Internal fittings — drawers, runners, hinges, shelves, corner systems and appliance housings, which drive the internal dimensions of each unit.
  • Non-standard elements — panels that return a finish around a corner, scribes to an uneven wall, plinths, end panels, and any tall unit that breaks the two tone line.

Our Two Tone Melamine Cabinets are supplied with made-to-measure sizing, material and finish options, and a layout tailored to the project. That flexibility is exactly why the quantity list has to be built from drawings rather than from a catalogue count.

Step 1: Lock the layout before you count anything

Quantity errors almost always trace back to a layout that was still moving when the order went in. Fix these first:

  • Appliance schedule — which oven, hob, dishwasher, fridge and extraction unit are confirmed, with their dimensions.
  • Worktop depth and thickness, because they set the carcass height and the scribe allowance.
  • Ceiling height and any bulkhead, beam or window sill that limits tall units.
  • Door swing and traffic clearances for islands and peninsulas.
  • The exact point where the two tones meet — horizontally along a run, vertically at a corner, or by unit type.

A practical rule: the tone break should sit on a natural edge of the design, not cut across a door. Ending the darker tone at a tall unit or at a return panel gives you a clean production line and a clean site installation. A break that lands mid-run forces extra scribe panels in two finishes.

Step 2: Count by module, then convert to faces

Cabinet quantities are easiest to control when everything is counted as modules and every module is drawn to a width. Two numbers matter for each one: the carcass size and the number of doors or fronts hanging on it.

ElementHow to quantify itWhat commonly goes wrong
Base unitsCount per module, note width and whether the front is one door, two doors or drawers.Plinth height assumed instead of measured, so fronts arrive too tall or too short.
Wall unitsCount per module with height and depth; record the underside level relative to the worktop.Ceiling clearance ignored, so the top row cannot be installed.
Tall unitsSpecify each one individually — oven housing, pantry, fridge housing, integrated appliance housing.Appliance ventilation gaps not built into the carcass dimensions.
Island / peninsulaGive both elevations; state which faces are visible on both sides.Only one elevation drawn, so the return side has no finish specified.
Corner unitsState the corner system first, then the door size that system requires.Door sized from the run length rather than from the fitting.
End panels and scribesMeasure on site after the layout is fixed; order in the tone of the adjacent run.Ordered too early, or ordered in only one of the two tones.

When you list doors separately from carcasses, your two tone split becomes a simple arithmetic problem. Count lower-run fronts as Tone A and upper-run fronts as Tone B, then add the tall-unit fronts to whichever side of the design they belong to. If a project mixes drawer banks with hinged doors on the same run, keep those counts separate — drawer fronts and door panels are cut and edged differently even in the same melamine.

Step 3: Coordinate the second tone across the whole package

A two tone kitchen rarely stops at the doors. The second colour usually reappears on open shelving, a tall unit, a pantry run or a dining-side cabinet, and those items are often bought from a different part of the order. Coordinating them means matching three things:

  • The board — same melamine decorative paper and same supplier batch wherever a tone repeats, so grain direction and shade read consistently across rooms.
  • The edge — matching edging on every visible cut, including the tops of open shelves and the returns of tall units.
  • The hardware — handle or handleless profile, hinge type and drawer system, specified once and applied consistently unless a deliberate contrast is intended.

If the same tones need to carry into bedrooms or wardrobes in the same project, order those together rather than later. Our Two Tone Melamine Wardrobes are specified on the same made-to-measure basis as the kitchen range, which makes it straightforward to keep one palette across a villa or apartment package instead of matching shades after the fact.

Step 4: Decide finishes and construction per zone, not per aesthetic

Melamine panels are specified for how they behave in use, so it is worth deciding finish by zone. In our melamine kitchen range the same cabinet logic is offered across several surface options, which helps when one project needs different durability in different areas:

A two tone design is therefore not one decision but two: which surface for the darker zone and which for the lighter. Choose them as a pair and look at both samples together in the actual room lighting before anything is signed off. A wood grain that reads warm next to a soft grey can read orange next to a cool white.

Step 5: Build a quantity sheet your supplier can price without guessing

The most reliable enquiries we receive contain the same fields for every line. Use this structure and most coordination problems disappear before production starts:

FieldWhat to record
Module referenceUnique code per unit, matching the drawing number.
Width / height / depthIn one consistent unit of measure, with finished dimensions including doors.
Front typeDoor, drawer front, tall door, or panel — and the count per module.
Tone assignmentWhich of the two tones each face belongs to, named by board reference.
Carcass finishInterior and exterior board colour for each unit.
FittingsDrawer stacks, runners, hinges, shelves, corner systems, appliance housings.
Elevation referenceWhich drawing shows the unit, so nothing is counted twice.
Site condition noteScribe allowance, uneven wall, beam, or service run affecting the module.
Two checks before you send it: confirm that every elevation on the drawing has a matching line on the sheet, and confirm that no door is counted both as a door and as part of an assembled unit. Those two errors account for most re-orders.

Step 6: Sequence production, delivery and installation

Custom cabinetry only installs cleanly when the trades around it are sequenced properly. For a two tone melamine kitchen on a residential or fit-out project, the practical order is:

  • First fix complete — services, plasterboard and levels confirmed, walls squared where cabinets will sit flush.
  • Site re-measure against the fixed layout, then final drawings released to production.
  • Production with finish and edge banding matched across both tones in one run.
  • Packing by zone — tall units, base run, wall run and panels kept separate so installation follows the drawing order.
  • Delivery to site with worktop and appliance dates aligned to the cabinet installation date.
  • Installation, then snag inspection on door alignment before handover — misaligned doors are the most visible fault in a two tone design, because the colour break exposes every gap.

For projects outside China, we handle freight and door-to-door delivery as part of the package, which matters for cabinetry: a container that arrives before the site is ready creates storage damage risk, and one that arrives late stalls the whole fit-out. Confirm your delivery window against your own programme rather than assuming standard transit.

Common coordination mistakes worth avoiding

  • Mixing tone rules between rooms. If the kitchen breaks tone at the tall unit but the pantry run breaks it at the corner, the two spaces read as unrelated.
  • Specifying handles after doors are cut. Handleless profiles and integrated channel pulls change door sizing and edge detail; decide before panels are machined.
  • Ordering glass or display elements separately. Where the design includes glazed fronts, they need to be coordinated with the same tone frames as the solid doors around them.
  • Ignoring lighting in the quantity list. In-cabinet lighting needs a decision at carcass stage — drilled shelving and cable routes cannot be added after panels are edged.
  • Treating plinths and scribes as accessories. They carry the two tone break visually and should be ordered in the matching board, not sourced locally.

How SANTERSON supports a cabinetry package

We manufacture furniture and building materials for villa, hospitality and office projects, supplying kitchens, wardrobes, joinery and interior fixtures. For cabinet work, our Custom Kitchen Cabinets for Residential and Hotel Projects are produced to project dimensions with the finish and layout specified per space, and where a project needs a bespoke profile, texture or branding, our custom and OEM service covers prototyping, material selection and production coordination.

For larger fit-outs, cabinetry is normally only one line in a wider package that also includes doors, wall panelling, wardrobes, bathroom fixtures, lighting and flooring. Ordering them together keeps shades, profiles and hardware consistent across the building, and it puts one production and delivery schedule behind the whole job. That is the model behind our Turnkey Interior Project Solutions, which run from design coordination through production, logistics and installation support.

If you have drawings ready, send the elevation set and your module list and we will price the two tone melamine package against them, flag anything that will not build as drawn, and confirm dimensions and selected specifications for your project before production begins.