A swim spa quotation is only as good as the information behind it. Two projects can both ask for the Outdoor Swim Spa WS-PC08ST and end up with different prices, because this model is sold as a configurable unit: shell size is fixed in the catalogue, while pumps, heating, filtration and control options are selected per project. This guide walks through what to send us so the quotation you receive matches what will actually be delivered.
Start from the model, not the price
WS-PC08ST sits in our configurable outdoor swim and hydrotherapy range. It combines an eight-metre shell with a counter-current swim station and a jetted seating area, so one unit serves lap training and recovery sessions at the same time. Before pricing makes sense, we need to know which role the spa plays on your site: a private villa garden installation, a resort or clubhouse wellness area, or a fitness facility. That choice drives equipment sizing, control layout and the access arrangements our team plans around.
The catalogue baseline for WS-PC08ST
Every quotation begins from the published configuration below. Treat these as reference values; final figures follow the specification sheet we confirm with you in writing.
Catalogue configuration shown for WS-PC08ST
Shell dimensions: 8000 × 2400 × 1470 mm
Control system: 1 set
Swim training system: 1 set
Filter pump: 1 pc
Jet total: 6 pcs
LED lights: 4
Total power (catalogue figure): 6.55 kW
Features shown: water jets, LED lighting, ozone, swim training system
A closely related variant, WS-PC08ST-L, is listed with a longer shell at 8490 × 2400 × 1470 mm and the same equipment counts. Tell us which one you are comparing, or send your available footprint and we will tell you which fits.
Options that move the quotation
The catalogue lists optional accessories for this range. Please mark each one as included, excluded or "advise", so nothing is assumed on either side:
- Control system specification and user interface
- UV sterilization alongside the standard ozone system
- Water pump capacity for the swim station
- Heat pump, including whether year-round water temperature is required
- Sand filtration as an alternative to the standard filtration arrangement
- Insulation package for the shell and equipment bay
- Steps and access arrangements at the entry end
Availability and compatibility of these options vary by model, so we confirm each item against the selected configuration before we price it.
Site information we need with your enquiry
The following details let us quote once instead of three times:
- Location and delivery address — city and port of entry, so we can plan freight to site.
- Installation setting — in-ground, semi-recessed or on a deck or slab, with any structural notes from your engineer.
- Electrical supply — available phases, voltage and the rating of the distribution board near the spa. The catalogue power figure above is a starting point, not an electrical design.
- Intended use and duty cycle — residential, hospitality or gym use, plus rough daily running hours.
- Target completion date — this drives production scheduling and the shipping method we recommend.
- Related scope — poolside decking, paving, outdoor furniture or bathroom fit-out that you would like quoted in the same package.
How the order moves from enquiry to handover
As a one-stop furniture and building materials supplier, we handle swim spa projects through the same workflow as the rest of your package: project brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up. Our custom and OEM service covers bespoke finishes and configuration changes where the model allows them. Freight is arranged as door-to-door delivery with the customs paperwork handled on our side, and installation and after-sales support complete the package.
Send your WS-PC08ST enquiry
Include the model or variant, your option selections, site and electrical details, and target date. Our team replies with an itemised quotation covering equipment, delivery scope and installation support. Start at our contact page, or browse the wider swim spa range first.