On a villa or hotel job, the flooring decision rarely stays a flooring decision. The parquet pattern you choose sets how the room reads underfoot, but it is the rest of the brief — subfloor, heating, room dimensions, handover sequence, even the joinery schedule — that decides whether that floor lands cleanly on site or turns into a variation order.
1. What the floor has to sit on
This is the first question we ask, because it governs everything after it. A floating parquet field laid over a levelled screed behaves differently from a bonded field fixed to a structural deck, and both behave differently again over an existing raised floor in a refurbishment.
- Substrate type and flatness. Parquet modules with a geometric pattern show up unevenness sooner than straight planks. Tell us the screed or deck type, and whether the site team can supply a measured flatness record before production starts.
- Residual moisture. New screeds need to be dry enough to receive timber. Share the reading your site team takes, not just the age of the slab.
- Floor build-up height. Parquet plus adhesive plus underlay has to meet thresholds at doorways, thresholds to balconies, and lift lobbies. We have seen a beautiful floor ruined by a 12 mm clash with an existing marble reveal.
2. Underfloor heating, wet rooms and other conditions
Engineered construction is what makes European oak practical where solid timber is not: the cross-layered base resists the movement that heat and humidity changes cause. Several of our parquet lines are described as compatible with underfloor heating — including the European Oak Parquet Engineered Hardwood Flooring in our catalogue — but we still want the details before quoting, because the fixing method and the acclimatisation plan change with the heat source.
- Hydronic or electric mat? What is the maximum surface temperature the system is set to?
- Is a screed-over-pipe system being heated gradually before the floor goes down, or is heating switched on straight after handover?
- For coastal and tropical sites: what is the expected year-round humidity band in the room once the HVAC commissioning is finished?
Where a project sits in a humid climate, we look at board format and fixing method together rather than treating the finish colour as the decision. A darker field such as European Oak Parquet Engineered Wood Flooring in a deep brown grain reads very differently under warm, humid light than in a dry, artificially lit interior.
3. Pattern, board format and the room's proportions
Parquet is a layout decision as much as a material one. Chevron and herringbone draw the eye along the axis of the pattern, which can stretch a narrow corridor or shorten a long gallery depending on which way you run it. Square and brick-set parquet fields feel calm in guest rooms but need careful setting-out against the joinery lines.
| Pattern | What it asks of the project | Where we usually place it |
|---|---|---|
| Herringbone | Needs a clear setting-out line from the main entrance; more cut waste at irregular room shapes. | Reception, lounge, master suite. See European Oak Herringbone Engineered Wood Flooring in a light bleached tone. |
| Chevron | Requires precise angle matching at the perimeter; site cutting is less forgiving. | Formal living rooms, hotel lobbies, corridors with a strong axis. |
| Classic parquet block / basketweave | Tolerant of small dimensional drift; easier for local fitters to set out. | Guest rooms, apartments, family living areas. |
| Plank format with parquet border | Border and field must be produced together so grain and finish match. | Large open-plan villas, banquet-adjacent lounges. |
4. Surface treatment and how the floor will be used
The same oak in two finishes performs very differently once people are walking through it with luggage, heels and service trolleys. When you send us the room schedule, tell us the traffic level per space, and we will match the treatment rather than pushing one finish across the whole building.
- Light, natural finishes show dust and grit but hide light scattering; they keep interiors bright in rooms with limited glazing.
- Smoked and honey tones such as our smoked-antique European oak work well where you want warmth without a heavy dark floor.
- Charcoal and dark brown tones hide daily wear well and give a sleek base for pale joinery, but show light dust between cleans — relevant for high-turnover hospitality rooms.
- Brushed, saw-cut or hand-textured surfaces grip better under wet feet near pool approaches and disguise micro-scratches; they need a different cleaning regime than a smooth lacquer.
Ask us which wear layer and finish system sits behind each product page. Our parquet lines are built with a solid oak wearing layer over a multilayer base, and the exact construction affects whether a floor can be refreshed later in its service life — a real consideration on a hotel asset held for ten years or more.
5. Quantities, phasing and how the floor arrives
Project quantities are never just square metres. The number that decides your cost per square metre is how much material you actually lay versus how much you cut off the end of each run.
- Send a room-by-room schedule, not one total area. Parquet laid in multiple small rooms wastes more than the same area laid as one open field.
- Tell us the phasing. If guest-room floors go down in three tranches over a year, we plan production runs and carton sizes around that, and keep dye-lot consistency across the batches.
- Confirm the delivery address for each phase. A city hotel with a single loading bay and no overnight storage needs smaller, sequenced drops; a villa compound can take full containers. Our logistics and door-to-door delivery service covers freight, customs paperwork and container loading, so the phasing plan needs to reach us before production, not after.
- Order the same lot for one continuous field. Restocking a single room two years later from a new production run is where natural oak grain stops matching.
6. Coordination with the rest of the fit-out
Flooring is on the critical path whether people plan it that way or not. It has to arrive after wet trades finish and before furniture lands, and its level has to agree with everything that meets it.
- Thresholds and transitions to stone, tile and carpet — decide the material and the detail at design stage, not on site.
- Kitchen cabinetry and wardrobes: if units sit on the parquet, the floor must be laid first; if units are scribed over a finished subfloor, the sequence reverses. This changes our packing list and the installation guidance we issue.
- Stair and skirting profiles: send us your profile schedule early so matching oak edges and reducers ship with the floor rather than in a second consignment.
Where flooring is part of a wider package, this coordination is exactly what Turnkey Interior Project Solutions are for. We produce cabinetry, wall panelling, joinery and finishes alongside the floor, so one factory resolves the level and detail clashes instead of three suppliers trading emails across time zones.
7. Installation method and who is doing it
Tell us whether the floor goes down with your own fitters or ours. Both are workable, and the difference is what we send in the box.
- Your fitters: we supply fixing-system guidance, setting-out drawings for the pattern, and a written acclimatisation and site-condition checklist, so the warranty position is clear before the first board is opened.
- Our team: we arrange on-site installation, inspection and snagging as part of installation and after-sales support, with spare boards held against future repairs.
- Either way: photograph the substrate condition on the day the floor arrives. It protects your claim if the screed was not ready, and it lets us advise remotely within the same working day.
8. Budget band — say it early
The honest budget number is more useful than a wish list. Parquet cost moves with board size, pattern complexity, wear-layer thickness, finish system and how much of the build is bespoke sizing versus standard cartons. Once we know the band per square metre for each room type, we can put three real options in front of you — usually a straight-plank engineered oak, a classic parquet block, and one statement pattern such as herringbone in a smaller format — instead of quoting one specification and watching it get value-engineered out later.
The details to send with your enquiry
Substrate: screed, deck or existing floor; measured flatness; moisture reading; available build-up height.
Conditions: underfloor heating type and set temperature; HVAC humidity band; traffic level per room.
Design: pattern and format preference; tone direction (light, smoked, dark); surface texture; edge and skirting profiles.
Numbers: room-by-room areas with a stated wastage allowance; phasing dates; delivery address per phase.
Sequence: who installs, when wet trades finish, and whether cabinetry sits on or over the floor.
Send us the drawings, not just the area
SANTERSON has manufactured furniture and building materials since 2008, and we supply European oak parquet and engineered flooring as part of a whole fit-out package — joinery, wall panelling, doors and loose furniture from one production schedule. Send the floor plan, the room schedule and your target band, and we will come back with a specification that fits the subfloor, the heating and the programme you actually have.