A swim spa is one of the few site amenities that combines civil works, mechanical plant and electrical load in a single purchase order. On a villa or hospitality project, an error at the ordering stage rarely stays on paper: it surfaces later as a slab that has been poured to the wrong footprint, a distribution board with insufficient capacity, or a container that arrives without the accessories the installer needs. The catalogue entry for Outdoor Swim Spa WS-PC07A is a good worked example of what to interrogate before a purchase order is raised.
Start with the footprint, not the finish
The published catalogue lists this model at 7000 × 3000 × 1470 mm. Before anything else, procurement should confirm that figure against the shell and site drawings, because the number drives four separate trades: the slab or plinth size and its load path, the waterproofing and drainage falls around the vessel, the access route from the delivery vehicle to the setting point, and the clearance needed for later servicing of pumps and filters. A 7 m × 3 m vessel that fits on a rendering can still fail on the last item if plant access is squeezed behind a boundary wall or a glazed facade.
Ask the supplier to state which dimension is the finished outer shell and whether steps, coping or an integrated deck edge sit outside that envelope. Then have the site team mark the setting-out on the ground, not only on screen.
Treat the specification sheet as a starting point
The detail page for this model lists one control system, four water pumps, one filter pump, 62 jets in total and one LED light, with a stated total power of 9.55 kW. Those figures are useful for early budgeting and for sizing the electrical supply, but they should be reconfirmed on the quotation for the exact configuration you intend to buy.
Why this matters: within the same 7000 mm length family, adjacent configurations carry different equipment counts and different power totals. One variant in that group is listed with a single water pump, 56 jets, four LED lights and a total power of 11.55 kW, plus a swim training system; another shares the 7000 mm length but a narrower 2400 mm width, six jets and 6.55 kW. Same shell length, different plant, different electrical demand. A quotation that names only the length family is not enough to book a circuit.
Where the catalogue itself marks an item as not listed for a given model — on this record, the swim training system — do not infer its presence or absence from photographs or from a sibling model. Request written confirmation of what is included and what is optional.
Options change both price and site preparation
The range lists configurable additions such as control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each of these has a procurement consequence beyond the line-item cost:
- Heat pump and insulation — affects running load, the location of outdoor plant, noise proximity to neighbouring amenity spaces, and whether an insulated surround is required in the specification.
- Sand filtration — needs space for the filter vessel, a drain connection, and a maintenance route that does not cross guest or resident areas.
- UV sterilisation and ozone — clarify which is included as standard on the selected model and which is an add-on, so water-treatment scope is not quoted twice by different subcontractors.
- Steps and access — confirm whether steps are fixed to the vessel, site-built, or supplied loose for local installation.
Availability and compatibility of options vary by model, so every option should be quoted against the specific model code rather than the range in general.
Electrical and commissioning scope needs a named owner
The detail page prompts buyers to confirm included equipment and electrical requirements for the selected configuration. That single sentence covers several items that commonly fall between packages: the main supply and protective device sizing, dedicated circuits for pumps and the control system, bonding and earthing around the wet zone, the location of the control panel, and who performs commissioning at handover.
A practical step is to request, before ordering, a wiring load schedule for the exact configuration plus the manufacturer's installation requirements. Hand that pack to the project electrical engineer and ask them to return a marked-up version. Any gap between the two documents becomes a question now rather than a variation later.
Ordering across borders adds its own risk list
SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, with named services covering design coordination, custom and OEM production, freight and door-to-door delivery, installation and after-sales support. For imported swim spas, procurement should keep the commercial scope explicit in writing: Incoterms and who carries insurance, packaging and container loading plans, customs documentation such as commercial invoices, packing lists and certificates of origin, the delivery point (kerbside, site entrance or setting point), and what the installation visit actually covers.
Import terms, duties and transit arrangements differ by destination and change over time. Confirm them for the specific shipment instead of relying on a previous project's paperwork, and do not assume local code compliance from marketing material — that sign-off belongs to the project's local engineers and certifiers.
A short pre-order checklist
Confirm in writing before the purchase order is raised
- Exact model code, dimensions and whether steps or coping sit inside or outside those dimensions
- Pump count, jet count, lighting count, control system and total power for the quoted configuration
- Which options are standard, which are add-ons, and which are unavailable on this model
- Electrical load schedule, protection requirements and commissioning responsibility
- Delivery point, Incoterms, insurance and customs documents
- Installation scope, snag process, warranty terms and spare-parts availability
If a project needs a different shell geometry, the supplier also lists customisable outdoor spas in square, round, oval and curved layouts for gardens, terraces and leisure areas, which is worth reviewing when a standard footprint does not suit the site.
Where to get the missing detail: configuration, options and electrical requirements for this model are set out on the product page, and SANTERSON's service pages describe design coordination, custom/OEM production, freight with door-to-door delivery, and installation and after-sales support. Send your drawings and required configuration through the contact page and request a written specification for the exact model code before the order is raised.