A swim spa quotation is easy to compare on price and hard to compare on substance. Two proposals for the same model can carry different pumps, different jet counts and very different site works behind them. If you are evaluating a quote for our Outdoor Swim Spa WS-PC05 — whether for a private villa or a resort — the sections below set out what to verify line by line before you sign, and which questions to put back to the supplier in writing.

1. Confirm the model designation matches the specification sheet

Configurable swim spa ranges use model suffixes to mark real equipment differences, not marketing labels. In our range, the WS-PC05 base configuration is listed without a swim training system, while the WS-PC05ST variant lists one. The two also differ in cabinet depth and jet count, which changes both the installation footprint and how the unit is used day to day.

Before reviewing any other detail, check that the model code on the proforma invoice, the specification sheet and the packing list are identical. If a quotation offers a "similar" or "upgraded equivalent" without repeating the exact model code and its equipment list, treat it as a different product and price it separately.

2. Read the catalog dimensions as a site constraint, not a marketing figure

The catalog dimension for this model is 5000 × 3000 × 1100 mm. That number is only useful once you have applied it to your own ground conditions:

  • Slab and edge support. Confirm what the unit needs under and around it, and who is responsible for the base — the supplier or your civil contractor.
  • Access route. Measure gates, side passages and turning points against the shell size, not against the advertised water area. Craning over a fence or wall is a cost line that appears late if it was never planned.
  • Clearance for service. Pumps, filters and the control system need reachable access. Ask the supplier where each item sits in the configuration you have chosen.

Ask for dimensioned drawings rather than a brochure image, and hand those drawings to your site contractor before any concrete is ordered.

3. Match the equipment list against how the spa will actually be used

The catalog entry for this model shows water jets, LED lighting, ozone and four water columns. The specification block lists a control system, one water pump, one filter pump, eighteen jets, two LED lights and a total power figure of 2.25 kW. Two checks matter here:

  • Usage fit. If the brief is daily lap swimming rather than hydrotherapy and relaxation, a configuration without a swim training system will not deliver it, however attractive the jet layout looks.
  • Completeness. Where the catalog records an item as "not listed", ask explicitly whether it is excluded or simply omitted from the table. Get the answer in writing on the revised quotation.

If your project needs a swim current, compare the base configuration with the swim-training variant instead of assuming a field upgrade will be possible later.

4. Separate standard equipment from priced options

Options catalogued for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each of these changes the delivered price twice over: once as an item cost, and again through the electrical and civil work it triggers.

Ask for a three-column option table

  • Option included as standard / priced extra / not available for this model
  • Electrical load and supply requirement that option adds
  • Site work the option requires (power feed, insulation, base detail, access)

A heat pump is the clearest example. Selecting it without confirming the supply arrangement and the running load means your electrician later quotes for work nobody budgeted.

5. Verify the electrical information before the quotation is fixed

The catalog records a total power figure of 2.25 kW for this configuration, and its own note asks buyers to confirm included equipment and electrical requirements for the selected configuration. That instruction is worth following literally:

  • Request the supply requirement for the exact configuration quoted — phase, circuit and protection.
  • Ask whether the figure covers all installed equipment or only the standard package.
  • Have a local electrician confirm the installation against your site's rules. Importers and manufacturers do not design to every local wiring code; that responsibility sits with the installer in your country.

6. Check what the supplier covers between factory and handover

For an imported unit, most disputes arise in the middle of the process rather than at either end. Our service pages describe global freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, alongside installation support and after-sales service. Ask the supplier to state, for your order specifically:

  • The Incoterms and which costs sit with you — duties, local taxes, inland haulage to site.
  • Which documents are provided: commercial invoice, packing list, certificate of origin and any import paperwork your country requires.
  • Who performs on-site installation and commissioning, and what inspection or snag list closes the job.
  • What after-sales cover means in practice for your location: which parts are held, how replacements ship, and what response time is actually committed to you in writing.

Marketing pages state service levels; a purchase order defines them. If a response time or warranty term matters to your decision, it should appear in the contract documents, not only on the website.

7. Compare proposals on one page

Put every quotation into the same table before deciding. For this model we would expect each line to state:

Model codeExact suffix, repeated on invoice and packing list
Catalog dimensions5000 × 3000 × 1100 mm, plus required site clearance
Pumps and filtersWater pump, filter pump, sand filtration if quoted
Jet totalNumber and type of jets in the delivered configuration
Lighting and water featuresLED count, water columns, ozone or UV sterilization
Total powerFigure for the quoted configuration, with supply requirement
OptionsIncluded, extra-priced or unavailable — stated per item
Delivery and installationIncoterms, documents, installer responsibility, handover checklist

Two quotations that look similar in price usually part company on the last three rows.

8. Red flags worth pausing over

  • A specification table with no pump, jet or power detail, only feature names and photographs.
  • Model codes that shift between documents without explanation.
  • Options quoted as "free of charge" with no note on the electrical or civil work they create.
  • Delivery terms written as "door to door" while duties, taxes and site-side haulage remain undefined.
  • Warranty or response commitments that appear in correspondence but never reach the contract.

How a single supplier simplifies this checklist

A swim spa is rarely bought alone. Poolside loungers, shade structures and the surrounding paving or cladding are specified by the same team on the same programme, and split suppliers multiply the coordination work described above. As a one-stop furniture and building materials supplier, we produce and supply outdoor collections alongside interior fixtures and finishes, so one specification set, one production schedule and one shipment cover the poolside and the building around it. Our custom furniture and OEM service also covers bespoke finishes and configurations where a project brief calls for them.

Browse the wider range in Swimming Pools and Swim Spas, and see how villa and hospitality projects are coordinated end to end under Turnkey Solutions.

Send us the model code, your site dimensions and the options you want quoted, and we will return a specification sheet with the equipment list, supply requirement and delivery terms for that configuration. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com to start.