A swim spa that fits the site drawing but not the plant room, or one ordered without a confirmed supply arrangement, stalls a villa or resort programme long after the design is signed off. Outdoor Swim Spa WS-PC03 sits in our configurable outdoor swim and hydrotherapy range, and it is specified the same way as any other built element on a project: with measured site data, a clear statement of how the unit will be used, and a confirmed equipment list. This guide sets out the measurements and project inputs to send us, so that quotation, production and delivery proceed without rework.
Measurements to Take First, Then Add Your Own Margins
The catalog dimensions for WS-PC03 are 3000 × 3000 × 1000 mm. Treat that as the shell envelope, not as the space you need to allow. Send us the clear opening in the deck or terrace, the finished level of the surrounding surface, and the access route from the delivery point to the final position — gate width, turning radii, overhead clearance, and whether a crane or a hoist will be needed. A square 3 m footprint is easy to place on paper and awkward through a side boundary, so the access path decides the rigging method as much as the pit does.
Tell us which installation you are planning: fully recessed into a deck, partly sunken with a surround, or surface-mounted on a slab with steps. Each option changes the excavation, the structural support, the waterproofing detail and the position of the service access panel. Send drawings at whatever stage you have — even a marked-up landscape layout is enough for us to comment before anything goes into production.
Confirm the Equipment List Before Anyone Signs Off a Budget
The specification shown on the site for this model covers the following:
Model: WS-PC03
Catalog dimensions: 3000 × 3000 × 1000 mm
Jet total: 50 pcs, with 4 water columns
Water pump: 1 pc | Filter pump: 1 pc
Control system: 1 set
LED lights: 1 pc
Total power: 2.75 kW (catalog figure for the base configuration)
Features shown: water jets, LED lighting, ozone
A swim training system is not listed for this model in the catalog data. If your client expects lap swimming against a current rather than jet-based hydrotherapy, raise that at the enquiry stage — we will steer you to a configuration or a neighbouring model in the range that carries the swim system, instead of letting the assumption travel into the order.
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the option list you send back is what we confirm against, not a general catalogue page. For hospitality work, decide early whether guests will use the spa year-round; that decision drives the heat pump and insulation choices and, in turn, the running load.
Electrical and Plant Inputs That Have to Come From Your Side
- Supply arrangement: available supply voltage, phase, and the rating of the distribution board nearest the spa. The 2.75 kW figure in the catalog data belongs to the base configuration; adding a heat pump or extra pumps changes the load, so we confirm the electrical requirement for the selected configuration rather than working from the catalog number.
- Cable route and isolation: where the supply will terminate, the distance from the board, and who provides the isolator and protection device.
- Drain and overflow: location of the drain connection for drainage and maintenance work.
- Plant room or equipment niche: dimensions if the control system, pumps and filtration sit outside the shell.
- Structural support: slab or frame details once the installation option is fixed.
We do not design the electrical installation. What we do is confirm the load and connection requirements for the configuration you select, so your engineer can size the circuit correctly on the first pass instead of after the unit arrives on site.
Use and Occupancy Decide the Configuration More Than Aesthetics Do
Tell us who will use the spa and how often. A private villa spa used by a family, a resort spa running sessions through the day, and a gym facility with high turnover place different demands on filtration capacity, water treatment and maintenance access. For a hotel or resort installation, include expected daily bather load and opening hours in the enquiry; for a villa, tell us whether the space doubles as a plunge pool after exercise or is used mainly for hydrotherapy seating.
Because WS-PC03 belongs to a configurable range rather than a fixed off-the-shelf product, the use case feeds directly into equipment selection. Send your requirements in writing and we will reflect them in the specification sheet that accompanies the quotation.
How the Spa Coordinates With the Rest of the Package
Poolside work rarely stands alone. The same project usually needs aluminium sling sun loungers for the deck, shaded pergolas and swing benches for the terrace, and outdoor dining sets for the adjacent terrace — all specified to matching finishes and delivered on one schedule. Ordering them together with the spa means one production window and one shipment rather than several competing ones.
As a one-stop furniture and building materials supplier, we handle villa, hospitality and office projects end to end: design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then delivery and handover. The project services cover custom and OEM work, door-to-door logistics and installation support, so the swim spa is tracked in the same programme as the joinery, flooring and lighting around it.
Before You Send the Enquiry: Project Inputs Checklist
- Site plan and section at the spa location, with finished levels and clear opening dimensions.
- Installation option: recessed, partly sunken or surface-mounted, plus access route for delivery.
- Intended use and expected daily bather load.
- Options you want quoted: heat pump, insulation, UV sterilisation, sand filtration, steps, spare control set.
- Electrical data: supply voltage, phase, board rating, cable route, isolator responsibility.
- Drain and overflow location, and any equipment niche dimensions.
- Target delivery location and required site date.
With those inputs we can return a specification sheet and quotation that match the drawings on your table. If you are comparing WS-PC03 with other sizes in the same range, send the site constraints first — the envelope dimensions usually narrow the shortlist faster than the feature list does.
Send your drawings and the checklist above to discuss Outdoor Swim Spa WS-PC03 for your project, and we will confirm the configuration, included equipment and electrical requirement before production starts.