A wall-mounted display cabinet looks simple on a drawing: a box fixed to a wall, some shelves, a door or two. In practice it is one of the most specification-heavy items in a villa or apartment fit-out, because it has to clear structural constraints, match joinery already installed in the room, and arrive in a finish that lines up with everything around it. This article walks through how OEM sourcing works for these cabinets at SANTERSON — what we build to, what you supply, and what both sides confirm before production starts.

What We Manufacture

Our Santerson Wall Mounted Display Cabinets sit inside a wider Display Cabinets collection. The same wall-hung carcass logic carries across the range, which matters when one project needs several display types in different rooms:

Each of these is described on the product pages as configurable for residential living projects, with finish, layout and dimensions specified per space, and made-to-measure sizing listed in the configuration. So an OEM order is not a catalogue item with a logo added — it is furniture built to your drawing.

Step 1: Your Brief Becomes a Shop Drawing

The starting point is a brief, not a purchase order. For a wall-mounted cabinet we need the wall it is going on, the height and run you want, what sits inside it, and how the front should read against existing joinery. Our Custom & OEM service covers custom furniture design and prototyping, bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities, and brand customisation or private labelling.

From the brief we produce a shop drawing for your approval. That drawing is where the decisions get locked: overall dimensions, door type, shelf spacing, carcass construction, edge treatment, and how the unit meets the wall and skirting. Nothing enters production until the drawing comes back signed.

Our interior design service supports this stage with space layout planning, concept design and mood boards, furniture layouts and 3D visual renderings, and project design coordination covering drawings, production coordination and on-site guidance.

Step 2: Materials, Finishes and Branding

Our detailed Custom & OEM material mentions wood, metals, engineered stone and laminates as material choices, along with branding options such as engraving, embossing, logos and packaging. For a display cabinet, the finish decision usually runs in one of two directions:

  • Match what is already installed. A wall-hung cabinet beside kitchen or wardrobe joinery has to match door colour, sheen and grain direction. Send us the existing reference — a sample, a make and model, or a physical offcut — rather than a colour name.
  • Deliberate contrast. A display case that is meant to read as an object can carry a contrasting carcass and a lit interior. This is where illuminated cabinets do most of their work.

For private-label and OEM programs, branding can be applied to the product itself and to packaging. Confirm which options are available for your specification, along with current minimum order quantities and capacity, before you commit a program.

Step 3: What We Need From You Before Cutting Anything

Most rework on custom display cabinets traces back to information that arrived late. This is the checklist we work from:

ItemWhy it matters for a wall-mounted unit
Wall construction and fixing pointsCabinet weight, load rating and the fixing method depend on what is behind the finish. Stud, masonry and framed partitions behave differently.
Set-out dimensions from siteMade-to-measure sizing only works if the dimensions come from the completed wall, not the drawing stage. Confirm finishes are set out before we finalise.
Electrical routing and driver accessFor an illuminated cabinet, the transformer needs a route to the wall and an accessible point for servicing. Retrofitting a cable path after the wall is closed is expensive.
Contents and shelf loadingCeramics, glassware and books impose different shelf spans and thicknesses than decorative objects.
Door and hardware preferenceHinged, sliding or open affects clearance, swing paths and whether the unit can sit close to a circulation route.
Packaging and labelling requirementPrivate-label programs need the packaging spec agreed before production, not after cartons are printed.

Step 4: Production, Quality Control and Consolidation

Once the drawing and material selection are confirmed, the unit goes into production under our project process. The One-stop Solution page describes design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then final installation and handover.

For buyers assembling a whole fit-out, display cabinets rarely ship alone. We also manufacture kitchen cabinetry, wardrobes, vanities, media walls, doors and panelling, plus building finishes such as engineered wood flooring, decorative wall panels and aluminium ceilings. Ordering these together means one production schedule, one quality-control pass and one container plan instead of several.

Our logistics service covers global freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. The detailed page also mentions cargo insurance options and dedicated logistics coordinators.

Note on import terms: Incoterms, duties, insurance cover, transit time and the delivery point are agreed case by case for each destination. We do not publish a fixed service level for any country, and your customs broker should confirm local requirements before shipment is booked.

Step 5: Site Coordination and Handover

A wall-mounted cabinet fails on site in two ways: the wall was not prepared for it, or the fixing sequence happened after the wall finish was completed. Our service navigation lists installation and after-sales support, including on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance.

Two practical points worth settling at drawing stage rather than at handover:

  • Solid fixing line should be confirmed with your builder before the wall lining closes. If the cabinet is going onto a wall that is already built, tell us at the survey stage so the fixing method accounts for what is behind the finish.
  • Lighting commissioning for illuminated cabinets should be scheduled after the unit is hung and levelled, so drivers are not left inside a closed wall cavity.

Warranty terms, response times and exclusions vary by project. We confirm them in writing against your specific order rather than quoting general figures from our site copy.

How OEM Orders Are Priced and Sequenced

The cooperation steps on our interior design page are straightforward: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Pricing follows the specification, not a fixed price list, because wall-mounted cabinets are made to measure.

What moves the number is measurable: total linear run and depth, carcass and door construction, glass versus solid fronts, whether lighting is integrated, the finish system, and how many separate configurations sit inside one order. Repeat runs across units of the same configuration cost less per unit than a set of one-off sizes, which is worth knowing if you are specifying display walls across several dwellings in one development.

A Straight Test of Whether the Fit Is Right

Before you send an enquiry, three questions will tell you quickly whether we are the right manufacturer for this order:

  • Do you have a drawing or a reference image, even a rough one? Made-to-measure work starts far faster with either.
  • Is the wall finish complete or nearly so? If not, we can plan around it — but only if we know at survey stage.
  • Are you ordering display cabinets alone, or as part of a wider fit-out? Consolidated orders let us coordinate one production and delivery schedule.
Send us the wall dimensions, a reference image and your finish requirement, and we will come back with a shop drawing and a quotation for review. Full product details are on the Wall Mounted Display Cabinets page, and enquiries go through our contact page.