Media walls in a hotel do not behave like ordinary loose furniture. They are fixed to the structure, they carry screens, cabling and sometimes lighting, and they sit in front of guests every day of the property's life. That is why Santerson Full Height Media Walls are usually specified through a procurement package rather than bought as an item off a catalogue: dimensions, finish, storage layout and the technical interface with the wall all have to be settled before production starts.

This guide walks through the stages we see work well on hospitality projects — from the room survey to the handover checklist — so that purchasing teams, contractors and interior consultants can put the request together once and get it right the first time.

1. Confirm what the media wall has to do in each room type

Start with the function, not the finish. A guest suite, a serviced-apartment living room and a hotel lounge have very different requirements, and mixing them into one specification is the most common cause of change orders later.

  • Guest rooms and suites: screen mounting position, viewing angle from the bed, clear service access to sockets and signal cables, and enough closed storage that housekeeping can work quickly.
  • Serviced apartments and residential-style hospitality units: a fuller wall system with open display niches, drawers and shelving, since guests live there rather than stay for two nights.
  • Lounges and reception areas: presentation and durability take priority — panel materials that resist fingerprints and impact, plus integrated lighting if the design calls for it.

Where a project needs several of these roles, it is usually more economical to group them as separate line items in one order than to force one design across every room type.

2. Lock the survey data before anything goes into production

Full-height systems run floor to ceiling, so they inherit whatever the building gives them. For each room or room type, record:

  • Finished dimensions — width and clear floor-to-ceiling height at the wall line, taken after the floor and ceiling finishes are specified, not before.
  • Wall substrate and fixing condition — what the panels will be fixed to, and whether any packing or framing is needed.
  • Services positions — socket outlets, TV and data points, switches and any lighting circuits, with their heights from finished floor level.
  • Adjacent elements — doors, radiators, headboards, curtains and reveals that affect how the wall reads in the room.

The product listing for these systems is deliberately configurable: finish, layout and dimensions are set per project, and the listed note asks buyers to confirm dimensions and storage configuration for each project. Treat that as a hard gate in your schedule — production should not be released until the surveyed dimensions and the room-by-room elevation drawings have been signed off by the same person who approves the finish schedule.

3. Specify the build, not just the appearance

Two media walls that look identical in a rendering can perform very differently over ten years of hotel use. Put these items in the specification sheet you send with the enquiry:

Item to specifyWhat to state clearly
Panel and carcass materialSubstrate, surface material (veneer, lacquer, laminate or glass) and the grain direction for any wood-look panels.
Finish and colour referenceA named sample reference rather than a colour name alone; request a physical sample before the order is confirmed.
HardwareHinge and runner type, soft-close requirement, and handle or handleless detail — hospitality traffic wears cheap hardware first.
Screen supportScreen size, weight and mounting method, plus whether the screen sits flush, recessed or on an articulating arm.
Cable managementWhere cables drop, which panels need cut-outs, and how service access is maintained afterwards.
Lighting interfaceIf the design includes integrated or backlit lighting, specify driver location, switching and the maintenance route for replacement.

For hospitality work we normally recommend consolidating the media wall with the rest of the joinery package. The same turnkey project service covers design coordination, production and site follow-up, so wardrobe, vanity and media wall finishes come from one production run and match properly on site.

4. Use the related wall-system options deliberately

A full-height media wall is often the wrong answer in one or two room types of the same building. Rather than compromise the main design, specify a companion system where the room demands it:

Keeping these as separate but coordinated line items lets you protect the guest-facing rooms with the full-height design while spending the joinery budget where it actually matters.

5. Sequence the order around production and delivery, not around the trade calendar

Fixed joinery sets the pace of a fit-out. Work backwards from your on-site installation date and leave room for each step the supplier's process actually contains: design and detail confirmation, sample approval, production, packing and container loading, freight, then delivery to site.

  • Approve one prototype or first-article unit for a repeated room type before the full quantity is released. It exposes dimension, finish and hardware issues while they are still cheap to change.
  • Group the media walls with other built-in furniture in the same shipment where practical, so site storage and installation crews are mobilised once.
  • Confirm delivery terms in writing — who handles customs clearance, which port or site the goods land at, and who is responsible for the last leg to the building.
  • Check site readiness before the container arrives: finishes complete, services first-fix inspected, and a clear route to the rooms.

SANTERSON's logistics service covers freight forwarding, customs paperwork, packing and door-to-door delivery; for each project we still confirm import terms, insurance and delivery scope with the buyer rather than assuming them.

6. Installation and handover: what to inspect

Built-in wall systems are where snagging lists get long if the inspection is left to the end. Give the site team a short, repeatable checklist per room type:

  • Level, plumb and gap consistency between panels; no visible movement when the screen is touched.
  • Doors and drawers open clear of adjacent finishes and handles, with soft close functioning.
  • All cut-outs align with the as-built services positions; nothing pinched behind a panel.
  • Lighting, if fitted, switches correctly with drivers reachable for replacement.
  • Finish condition after installation — protective film removed, edges and joints clean, no transport damage.

Record the approved finish reference, the as-built elevation and the hardware schedule in one handover file per room type. Housekeeping and maintenance teams ask for exactly this information two years later, and having it on file is what keeps a media wall serviceable instead of replaced.

Putting the enquiry together

A complete enquiry for full height media walls on a hospitality project should carry: room-by-room schedule with quantities, surveyed finished dimensions, elevation drawings, finish sample reference, hardware selection, screen sizes and mounting method, services positions, delivery location and terms. Send it as one package and the quotation you get back is directly comparable between suppliers.

As a China-based manufacturer of furniture and building materials working on hotel, villa and office projects worldwide, SANTERSON handles these wall systems through the same custom/OEM and project coordination process used for cabinetry and interior fixtures. If you are assembling a joinery or FF&E package, send your room schedule to our one-stop furniture and building materials team and we will confirm dimensions, configuration and finish options for each room type before production is released.