A set of metallic high gloss cabinets only looks right once it is on the wall. The reflective surface shows every uneven floor, every out-of-plumb partition and every gap between carcass and wall, which is why the plan written before delivery matters more than the fixing method used on site. Metallic high gloss fronts are usually specified as made-to-measure units for residential kitchen projects, with finish, layout and dimensions set per project — so the installation plan has to be built around drawings that were checked against the actual space, not a generic fitting sequence.

Start with the information the plan must record

Before anyone books a fitter, the plan should be a single document that answers six questions: which units go where, what the finished dimensions are against site levels, who prepares the walls and floor, when the crates arrive, who carries them inside, and what happens if a panel is damaged in transit. A kitchen order rarely arrives as one delivery, so record each carton or crate against its position on the layout drawing. When the same supplier also handles furniture logistics and door-to-door delivery, the packing list, container loading notes and shipment tracking reference belong in the same file as the installation sequence.

Site conditions to verify before the crates open

High gloss metallic fronts are unforgiving of a square that is out, so the plan should list the checks with a name and a date against each one:

  • Floor level and finished floor height at every run, including where tiles meet the plinth line.
  • Wall plumb and square at carcass positions, plus the setting-out line that carries across returns and corners.
  • Positions of soil, water, gas and electrical outlets against the approved layout drawing, with any movement documented before production.
  • Appliance recess dimensions — oven, refrigerator, dishwasher and extractor — confirmed against the appliance data sheet, not the design intent.
  • Clear route from the kerb to the kitchen: lift dimensions, stair turns, corridor widths and door openings for the longest crate.
  • Storage area on site that is dry, locked and large enough to hold the delivery without stacking gloss panels against each other.

Write down the tolerance you will accept at the wall interface and how it will be closed — scribe, trim or shadow gap — so the decision is not invented on the afternoon of installation.

Protecting a reflective finish during the works

The plan should say who handles the panels, in what order they are unwrapped and when protective film comes off. Practical rules worth stating explicitly: keep crates flat and off the floor until their turn; carry doors vertically rather than dragging them; unwrap only the unit being fitted that day; and leave film on adjacent fronts while sealants and paints cure. Metallic gloss shows fingerprints and adhesive residue, so solvent-free cleaning cloths belong in the fitter's kit, along with a note that no blade or scouring pad touches the surface.

Sequencing matters as much as handling. Doors, drawers and worktops should be fitted after the wet trades have finished in that room, and after lighting is set, because glare from a downlight will reveal any panel that was adjusted to hide a crooked wall.

Coordinate the plan with the rest of the fit-out

A kitchen is rarely an isolated order. Cabinetry meets engineered wood flooring at the plinth, and it sits under a ceiling that may carry lighting or ventilation. Where the project also includes wall cladding, joinery or bathroom fixtures, the installation plan should record which trade has priority in each zone and who signs off the interface. For projects handled as a single package — cabinetry, flooring, wall panels, sanitaryware and furniture installation and after-sales support from one supplier — that coordination sits with one project contact instead of being negotiated between several vendors on site.

Inspection and handover items to write into the plan

Close the plan with a snags list that can be walked through in one pass:

  • Every door aligned and opening freely, with no rub against the carcass or an adjacent front.
  • Drawer runners and hinges adjusted so fronts sit parallel across the run.
  • Worktop joints, splashback joins and silicone lines clean, with no excess on gloss surfaces.
  • Appliance recesses checked for clearance and ventilation as specified.
  • Spare panels, handles and hardware labelled by unit and stored where the owner can find them.
  • Care instructions recorded — what to clean with, what to avoid, and which contact to reach for warranty or replacement parts.

Because these cabinets are made to measure, dimensions and selected specifications should be confirmed for each project before production is released; the installation plan is where those confirmed figures get used rather than rediscovered.