A hotel guestroom drawing that shows a tidy, modern WC is easy to approve. What usually slows the order down is everything the drawing does not say: which way the waste leaves the room, how many suites share the same model, and who is accountable when one shipment arrives short. If your brief already names the two piece washdown toilet 1038A, or simply asks for a durable two-piece WC for a hotel bathroom, the gap between that page and a confirmed purchase order can be closed in a handful of written decisions.
The steps below are the ones our project team works through with procurement managers, contractors and interior studios. They are written for the 1038A, but the same sequence applies to the rest of our ceramic range.
1. Read the brief for three facts no one should guess
Before any price is discussed, we ask the specifier to confirm three items. Each one changes what we produce and pack.
- Waste route. The 1038A is offered for both routes — a wall outlet on the 180 mm P-trap rough-in, or a floor outlet on the 250 mm S-trap rough-in — so the question is which one this room has, not which one to choose. A guestroom with a wall-hung cavity and the soil connection behind the stud wall is the P-trap case; a room where the waste drops through the slab is the S-trap case.
- Quantity by room type. Guestroom floors, public restrooms and staff facilities rarely need the same specification. Send the room schedule, not just a total count, so we can split the order sensibly.
- Handover standard. Say what must arrive installed and what the local tradesperson will finish — seat, cistern lid, flexible connector, pan fixings, sealant.
Practical point: the trap type and rough-in are set at production, not on site. A floor-outlet room cannot take a P-trap pan, and vice versa. Confirm both against the plumbing drawing before you release the order.
2. Match the model to the traffic it will see
The 1038A is a two-piece toilet in vitreous china ceramic with a full glaze. The washdown flushing design gives a strong wash with a low water line under the rim, which suits rooms cleaned daily by housekeeping rather than periodically by a contractor. The smooth glazed surface is what makes that routine work: it does not hold the staining that unglazed or poorly glazed pans collect around the waterline.
Two-piece construction is a practical decision, not a styling one. The cistern and pan are separate units bolted together, so a chipped pan is replaced without touching the cistern and its flush mechanism. Spares stay simple, and a damaged unit in transit does not condemn the whole assembly. That matters when the goods travel by sea and the replacement has to travel the same distance.
Where the design brief asks for a floating look with the floor left clear, the wall-hung option in the same 1038 family is the right discussion to have instead — see the 1038W wall hung toilet. Where a project wants matched pieces across the room, the floor-standing 1038F ceramic bidet sits alongside the 1038 pan. We will steer you to the variant your drawing supports rather than quote whatever is already in stock.
3. Send the specification sheet, not a photograph
A screenshot of a bathroom render tells us the look you want and very little else. A short specification sheet, even a spreadsheet, is what we can price and produce. Minimum fields we need:
- Model and quantity per room type, plus spares for the store room.
- Trap type and rough-in dimension for every room group.
- Seat requirement — soft-close, standard, or supplied locally.
- Marking and packing preference for multi-site deliveries, and the delivery address per phase.
- The name of the person who signs off the pre-production sample.
With those fields filled in, one enquiry usually covers the guestroom floors, the public WCs and the back-of-house facilities in a single exchange. Missing fields are the reason a quotation takes three rounds instead of one.
4. Approve one sample before production starts
For a hotel order we build a reference sample and send photographs and the recorded measurements for your sign-off: overall height, pan projection, cistern position, flush button or lever side, and the trap outlet dimension you specified. This is also the moment to test the pan in a mock-up bathroom with your own seat, connector and sealant. Any change to glaze tone or seat colour is cheap at this stage and expensive after the pans are on the line.
5. Confirm the delivery sequence with your programme
Ceramics arrive in the sequence they are used, so we plan packing against your site programme — phase one tower before phase two, public restrooms before guestrooms. As part of our turnkey hotel, villa and office project service, the same team that handled the specification arranges freight and door-to-door delivery with the paperwork your customs broker expects, and each carton is marked with the room group it belongs to. Unloading and stacking are on site; the room-group marking is what keeps installers from opening phase two cartons in week one.
6. Close out with a snag list and spares
When the last pan is fixed, we work through the list with the site foreman: chips found after installation, missing connectors, a cistern that runs. Replacement parts ship against that list rather than as a new order. We recommend holding a small buffer of pans and mechanism sets on site — the quantity depends on room count and how far the nearest hardware stock is from your property, so tell us the situation and we will suggest a number instead of guessing one.
A short example
A boutique hotel enquiry reaches us with a guestroom rendering, a room schedule that splits the guestroom floors from the public restrooms, and a note that the bathrooms were renovated with the waste carried through the slab. From that we confirm the guestroom pans on the 250 mm floor S-trap, split the public restrooms onto the wall-outlet specification, add the store-room spare allowance the client asks for, and send the sample for the general manager's approval before the pans are cast. Everything after that follows the same room schedule.
If you have a drawing, a room schedule or just a model number, send it to us. We will reply with the trap and rough-in questions that decide the order — not a price list.
SANTERSON — China-based manufacturer and one-stop supplier of furniture and building materials for hotel, villa and office projects. Enquiry: Contact us.