A tall bar cabinet is one of those pieces that looks simple on a spec sheet and then turns out to shape the whole room. It holds glassware, bottles and small appliances; it defines the line of a wall; and in an open-plan living or dining space it becomes the visual divider between zones. Because it is usually made to measure for a specific project, the buying decision is really a set of decisions: height, internal layout, material, finish, and how the unit will be delivered and installed.

The guide below walks through those decisions in the order most project teams actually face them, using the Tall Bar Cabinets in our Bar Cabinets collection as the reference point. Our tall bar cabinets are made to measure, with the finish, layout and dimensions specified to suit each space, so the questions here are the same ones our own project team works through at the drawing stage.

Start with the role the cabinet has to play

Before choosing any finish, decide what the unit is being asked to do. In a private residence a tall bar cabinet usually serves one of three purposes: a drinks store that also works as a display piece in the living room; a tall store beside the kitchen that keeps bottles and glassware out of the main kitchen run; or a full bar wall with a preparation counter, glass shelving and lighting. Each of these needs a different internal plan, and the difference only becomes visible once you draw the elevation.

For an apartment, hotel suite or show home where the bar is a supporting feature rather than the focus, our Santerson Compact Bar Cabinets cover the same job in a smaller footprint, with finish, layout and dimensions set per project. Where the brief is a complete bar wall, the Santerson Integrated Bar Systems are the better starting point, because the services, worktop and storage are designed together instead of being added one after another.

Measure the room, not the furniture

Height is the first number to settle. A floor-to-ceiling unit uses the full wall and reads as joinery, which suits a renovation where the wall can be brought back to a true line. A free-standing unit stops below the ceiling and leaves a shadow gap, which is usually the better choice in an occupied property where you would rather not disturb the plaster and cornice.

  • Confirm the finished floor level. Thresholds, screed and floor finishes all move a height that looked fixed on the drawing.
  • Check skirting, architraves, sockets and switches before you set the carcass line, and note any pipework behind the wall.
  • Allow for door swing and drawer run. A glazed door needs clearance in front of it, and deep drawers need room to pull out without fouling a table leg.
  • Record the delivery route as carefully as the room itself. Stair widths, lift doors and turning radii decide whether a one-piece carcass can get in.

Every tall bar cabinet we make is dimensioned against the site, and dimensions and selected specifications are confirmed for each project before production. That confirmation step is not a formality. It is where an out-of-plumb wall, a low beam or a services run gets resolved on paper rather than on site.

Plan the inside before the outside

Tall units fail in daily use for one of two reasons: shelves set at heights that waste the space, or bottles and glassware stored where they are awkward to reach. Work from what you actually own. Full-height spirit bottles, a decanter, stemware, a small wine fridge and a coffee machine all need different depths and shelf heights, and none of them belong on the top shelf.

A practical layout puts the working zone, meaning the counter and the shelves within arm's reach, at the middle of the unit, glass display above it where the light falls well, and heavier or rarely used storage below. Glass shelving with integrated lighting makes the display zone read as part of the room, while closed doors at the base keep everyday clutter out of sight. If display matters more than concealment, the Santerson Glass Front Bar Cabinets take the same made-to-measure approach with glazed fronts and project-tailored layouts.

Match the material and finish to the rest of the joinery

A tall bar cabinet rarely stands on its own. It sits next to a kitchen run, a media wall or a wardrobe, and it is judged against them. Where the cabinet is part of a wider scheme, specify it together with the other joinery so the veneer, lacquer or panel profile comes from one source and the door language holds across the project.

In a kitchen-adjacent position the bar cabinet and the surrounding Custom Built-in Kitchen Cabinets should come from one set of drawings, so carcass heights, handles and worktop returns line up. On an apartment or hotel project this is also the moment to group the bar cabinet, the tall store and the remaining built-in furniture into a single order instead of buying them at different stages.

Read the commercial terms, not only the price

Made-to-measure pricing is only comparable when the scope is identical. When you review quotations, look at what is included: the carcass and doors, internal fittings and shelving, glass and lighting, the worktop, plinths and scribes, and protective packing for site. A low quotation that leaves internal fittings out is rarely the cheaper option once they are added back.

For an order travelling internationally, confirm how the unit is packed, how it will be lifted into place, and who sets and aligns it on site. Our scope covers custom and OEM production with door-to-door delivery, plus installation and after-sales support, so the same drawings govern the cabinet from the factory through to the finished wall.

A short pre-order checklist

  • Elevation drawing signed off, with finished floor and ceiling levels marked.
  • Internal layout fixed against the items you intend to store, including appliance dimensions.
  • Material and finish samples viewed in the room's own light, next to the adjoining joinery.
  • Delivery route and installation responsibility written into the order.
  • Final dimensions and specifications confirmed in writing before production starts.

An informed decision about a tall bar cabinet is mostly a matter of sequence: settle the role, measure the room, design the inside, then match the finish and read the terms. Work through them in that order and the specification very nearly writes itself.

Send us your drawings, room dimensions and a note on what the cabinet needs to hold, and our project team will come back to you with a layout, material and finish specification for the space.