A wall panel enquiry rarely fails because the buyer asked for something unusual. It stalls because the supplier was handed a product name and nothing else. When you are specifying Santerson Acoustic Panels for a villa, apartment or hospitality fit-out, the difference between a quotation you can act on and one you cannot comes down to what you bring to the first conversation. Below is the practical checklist our project team works from.

1. The room, not just the wall

Start with the space the panel has to serve. A bedroom wall behind a headboard, a home office where a call needs to sound clean, a media room and a hotel corridor all place different demands on a wall system. Tell us which room it is and what happens in it through the day. That single sentence changes which of our paneling systems we put in front of you, and whether a fixed wall panel or an operable acoustic sliding panel is the more sensible answer.

If you are working on several rooms at once, say so. Panels specified as one package across a floor are produced, packed and shipped differently from one-off feature walls, and knowing the full extent early keeps pricing honest.

2. Measurements we can actually build from

Our acoustic wall panels are made to measure for each project, so dimensions are the item that holds everything else up. A rough plan sketch is a good start; a dimensioned set of elevations is better.

What to sendWhy it matters
Floor-to-ceiling height and wall widths, in one unit (mm or m)Sets panel module sizes and whether full-height panels are feasible.
Elevations showing doors, windows, switches, sockets and radiatorsDetermines cut-outs, end trims and where a run has to stop.
Existing finishes on the substrate (plasterboard, masonry, tile, old panelling)Affects fixing method and any preparatory work your local contractor carries out.
Squaring and level notes, or a survey where walls are oldOlder villas and renovated properties are frequently out of square; panels must be detailed for that reality.
Services you want concealed: cabling, back boxes, lighting driversPanels are fabricated around what needs to sit behind them, not after.

Where drawings are not ready, a phone walkthrough of the room with photographs and spot measurements is enough for an initial layout proposal. We will mark what still needs confirming before production.

3. What you want the wall to do

Describe the sound problem in plain words: television noise carrying between rooms, a hard room that sounds hollow and echoey, a study that needs quiet in the daytime. That description tells us where to look first, and it lets us confirm the acoustic performance of the specific configuration against your requirement rather than assuming it.

We do not publish one performance figure that covers every panel we make. Acoustic behaviour depends on the material build-up, the fixing detail and the wall behind the panels. Ask us to state the tested performance for the exact specification you are buying, in writing, before you commit.

4. Finish, texture and how the panel sits with the rest of the scheme

Finish and layout are specified per space, so bring the design intent with you. Colour samples, a mood board, or a photograph of the joinery, doors and flooring already chosen for the project all help us match tone rather than approximate it. Paneling is usually judged against what sits next to it: our textured panels and stone and marble panels are often specified alongside flush interior doors and integrated storage walls, and those details need to be coordinated as one set of drawings.

Also tell us how the wall will be used. A panel next to a bed head, in a child's room, in a bathroom corridor or in a guest room takes different surface choices and edge details. Wear, cleaning and light exposure are decisions you should make now, not at handover.

5. Your programme, your site, your delivery point

Made-to-measure work runs to the date you give us. Please have three dates ready: when drawings must be signed off, when panels must arrive on site, and when the trades that follow need the wall complete. Then confirm where the goods land - a villa address, a hotel loading bay, a builder's compound - and who receives them.

As a China-based furniture and building materials manufacturer handling door-to-door delivery, we arrange freight, packaging and container loading around your site conditions. Tell us about lift sizes, stair access, parking restrictions and any floor-protection rules early; they shape packing as much as they shape the delivery day.

6. Budget range and what it must cover

A workable range lets us propose a specification you can actually approve, instead of a quotation you have to send back three times. Be clear about whether your figure covers panels only, or also the fixing substructure, trims, lighting integration and installation support. As part of a turnkey project, panels are usually quoted together with the joinery, doors and fixtures they sit beside, which gives you one coordinated package rather than several disconnected orders.

7. Who signs off, and who installs

Name the decision-makers on your side - architect, designer, main contractor or owner - so approval cycles do not stall mid-production. And state who fixes the panels on site. We provide installation guidance and after-sales support; if your own crew is installing, send us their questions before fabrication so the substructure detail matches what they will build.

A short enquiry template you can copy

  • Project type and location; number of rooms or square metres of panelled wall.
  • Room-by-room elevations with heights, widths and openings marked.
  • The sound issue in your own words, plus any acoustic target set by a consultant.
  • Preferred finish direction, with samples or reference images attached.
  • Fixed panels or sliding panels, and why - access, storage, or space that has to change use.
  • Target drawing approval date, delivery address and required on-site date.
  • Budget range and the scope it includes.
  • Your decision-makers and your installing contractor.

Can you quote from a photograph alone?

We can give an indicative figure from photographs plus spot measurements, and produce a first layout for discussion. A firm quotation follows once dimensions and the panel build-up are confirmed.

What if my walls are not straight?

Send us the survey or your contractor's notes. Out-of-square walls are normal in renovated villas, and panels can be detailed to accommodate them - but only if we know before fabrication.

Can acoustic panels match my existing joinery?

Yes. Material and finish options are specified per project, and where colour matching matters we work from your samples or from the other SANTERSON products already on the same project so that panels, doors and cabinetry read as one set.

Send us the room list, the elevations and the sound problem in your own words, and we will come back with a panel layout, a specification to confirm and a quotation you can compare. As a one-stop furniture and building materials supplier, SANTERSON covers design coordination, custom manufacturing, logistics and installation support for villa, hospitality and office projects.