A request for quote is the document that decides how comparable your cabinet bids really are. For a two-tone, made-to-measure kitchen such as our Black & Light Grey L-Shaped Kitchen Cabinets with LED glass display, the difference between two quotations is rarely the headline number — it is what each supplier assumed about dimensions, appliance niches, lighting and delivery. The checklist below is the same information we need at our end to price an L-shaped kitchen package properly, so you can use it as a buyer-side template before you send anything out.
1. Drawings and measured dimensions
Cabinetry is made to measure, so a quote based on a rough plan is not a firm price. Give each supplier:
- A dimensioned floor plan of the kitchen showing overall wall lengths, the run that forms the L, and the corner return.
- Floor-to-ceiling height, plus positions of beams, downstands, pipework and existing electrical outlets.
- Window and door openings with head heights, because wall units and a glass display cabinet stop at those levels.
- The finish level of the completed floor — not the structural slab. A 20 mm difference changes every base unit height.
If drawings are still moving, say so in writing and ask for a budgetary quotation with a stated validity period. A firm price on unsettled geometry is the fastest route to variations later.
2. The appliance schedule before the cabinet carcasses
In this layout the appliances drive the joinery: a single oven sits in a central housing, while the tall unit on the return leg takes stacked ovens. Send the exact model numbers and cut-out dimensions of every built-in appliance — oven, steam oven, microwave drawer, dishwasher, fridge, wine cooler — or state clearly that the schedule is still to be selected and ask for appliance housings sized to a range you specify.
Ask each bidder to confirm in writing how they handle ventilation gaps, heat shielding, power outlets and isolator positions behind and beside tall housings. Where the appliance list is not fixed, integrated appliance tall cabinets can be configured to a defined appliance envelope, but the quotation should still name the assumed dimensions so bids are compared on identical assumptions.
3. Panel specification and finish
"Black and light grey flat panel doors" is not enough for an apples-to-apples comparison. Specify:
- The door construction and core material the supplier is quoting, and what they recommend for a high-use kitchen.
- The surface system — matte, high gloss, acrylic, lacquer, melamine or wood veneer — and whether both colours in the two-tone scheme use the same system.
- Edge treatment on visible edges, and whether panel colour is matched across doors, drawer fronts, plinths and any open shelving.
- Whether the black panels are a solid colour or a wood-effect grain, and which side of the panel is finished.
Ask for physical samples of both colours plus one edge sample before you accept any bid. Photographs and renders shift noticeably between screens, and a matte grey photographed in warm light reads as beige.
4. The glass display cabinet and its lighting
The illuminated display section is the most commonly under-specified item in this type of quote. State the glazing type, door mechanism, shelf spacing and whether shelves are glass or panel. Then specify the lighting: colour temperature, dimming, transformer location and how the driver is accessed for servicing. Our product page describes warm LED lighting in the display cabinet; treat colour temperature as a specified value you confirm on the order, not an assumption.
If the same supplier is also quoting integrated cabinet lighting elsewhere in the scheme — toe-kick, shadow gaps, wardrobe interiors — put those circuits on the same quotation so drivers and control gear are consolidated instead of duplicated.
5. Internal fit-out and hardware
Hardware is where low quotations quietly lose value. Ask each bidder to list, item by item:
- Hinge brand and type, including soft-close and the number of hinges per door.
- Drawer system, runner load rating, full extension or partial, and whether soft-close is included on every drawer.
- Corner solutions — carousel, pull-out rack or plain shelf — priced as an option so you can decide later.
- Wirework: cutlery inserts, pantry bins, spice racks, appliance shelving, and whether these are quoted or excluded.
- Support legs, plinth material, connecting brackets and any wall-fixing details for the wall units.
For project orders, ask whether hardware is supplied by the cabinet maker or sourced locally. We supply matching hinges, slide rails, support legs and brackets with our custom built-in kitchen cabinets, which removes one coordination risk when the fit-out crosses borders.
6. Worktops, splashback and interfaces
Decide now who is quoting the worktop and the splashback. In this design a stone splashback runs behind the hob and preparation zone; if it sits with the cabinet supplier, ask for the material, thickness, joint locations and edge detail. If it sits with a stone fabricator, ask the cabinet maker to provide setting-out dimensions and a site survey date so the two trades do not survey at different levels.
7. Project delivery terms and responsibilities
The commercial section of the RFQ should be as detailed as the technical one. For an overseas-supplied kitchen, state your project address and ask each bidder to price against a named set of terms:
| Item to specify | Why it changes the price |
|---|---|
| Delivery location and access conditions | Narrow apartment lifts and basement loading bays change packaging size and handling labour. |
| Incoterm and who arranges freight | Ex-works, FOB and door-to-door quotations look wildly different for the same cabinets. |
| Packaging standard and container loading plan | Cabinet weight, panel protection and how many units fit a container drive cost per project. |
| Customs documents supplied | Commercial invoice, packing list and origin paperwork must be listed as included or excluded. |
| Production lead time measured from what date | From deposit, from drawing sign-off or from PO — compare bids on the same trigger. |
| Payment schedule | Deposit, progress and balance stages change your cash flow more than the headline price. |
| Site coordination and installation support | Whether a supplier provides fitting guidance or hands over crates at the kerb. |
| Warranty scope and spare parts route | Panel, hardware and lighting components are often covered differently. |
Our own project workflow runs consultation, design and planning, production, logistics, installation and after-sales as one sequence, which is why we ask buyers for the site conditions early rather than at order stage. Read the service stages on our services page and check any supplier's process against them.
8. Quality evidence worth asking for
- A completed project reference in your region with a similar two-tone flat-panel specification.
- A prototype or first-article panel for sign-off before full production starts.
- The inspection points the supplier will show you: panel dimension check, edge banding, assembly, and pre-shipment packing review.
- Written confirmation of what happens if a panel arrives damaged — replacement lead time and who pays freight.
9. A comparison sheet that actually works
Build one spreadsheet row per requirement above, and enter each supplier's answer in its own column. Compare price only at the end. Three patterns usually appear once bids are lined up side by side:
- A cheaper bid that excludes corner hardware, appliance housings or the display lighting driver.
- A mid-priced bid that assumes a different panel system from the one you specified.
- A higher bid that includes site survey, packaging to your access conditions and named hardware — often the lowest true cost on site.
10. Common RFQ gaps we see on L-shaped kitchens
Putting it together
A good RFQ for this kitchen reads like a specification, not an enquiry. It fixes the geometry, names the appliances, describes the two-tone panel system, details the display cabinet and its lighting, itemises hardware, states who supplies the worktop and splashback, and prices delivery to your site under named terms. Suppliers can then quote the same job, and you can defend the award decision to a client or a project owner.
Send us the drawings and appliance schedule for an L-shaped two-tone kitchen — LED display cabinet, stacked-oven tall housing and matching hardware included — and we will return a line-by-line quotation for review.