A tall mirror cabinet rarely arrives on site as a standard box. Height, door layout, finish and the way it clears a basin or towel rail all have to be settled before production starts. This guide walks through exactly what to send us so that the quotation for a Santerson Tall Mirror Cabinet comes back accurate the first time, instead of going through three rounds of revisions.

Why a tall mirror cabinet is quoted as a made-to-measure item

Our tall mirror cabinet sits in the Mirror Cabinets collection alongside the round and standard formats. The product page lists made-to-measure sizing together with material and finish options, which means dimensions, layout and surface are specified per project rather than picked from a fixed size chart. Two bathrooms that look identical on a drawing can need different cabinets because of a window reveal, a concealed cistern, a shower screen line or the direction a door has to swing.

That is also why we do not publish a single price list for this item. The quote depends on the size envelope you give us, the carcass and door material, the glazing and mirror specification, internal fit-out, and the quantity and destination of the order. Sending those details at the enquiry stage is what keeps the lead time short.

What to send with your enquiry

The list below is what our project team works from. You do not need every line filled in, but the more of it we receive at the start, the closer the first quotation will be to the final one.

ItemWhat we need from you
Location and room typeGuest bathroom, main ensuite, shared family bath, guest suite or a commercial washroom. This drives the material and hardware specification we propose.
Wall opening and clearancesFinished width and height of the wall section, ceiling height, distance from the finished floor to the basin rim and tapware, plus any window reveal, pipework or cistern that intrudes into the zone.
Mirror-to-basin relationshipCentre line of the basin or basins, whether the cabinet must sit above a vanity top or stand clear of it, and how far the mirror face may project from the wall.
Layout preferenceDoor type and count, open shelf versus closed storage, full-height mirror panel or mirrored doors, and which side the hinges should be on.
Finish directionCabinet colour or woodgrain sample reference, handle style or handleless profile, and whether the finish should match other joinery in the project.
Lighting expectationIf you want an illuminated unit, send the switching arrangement and where the power feed will land. If lighting is not required, say so explicitly so we quote a non-illuminated version.
Quantity and scheduleNumber of units, split across room types if relevant, and the date the site needs them delivered.
Delivery destinationPort or door address, and your preferred Incoterms. We arrange freight by sea, air or rail with the customs paperwork handled on our side.
Drawings or photographsA marked-up plan, elevation or even site photographs are enough to start. Send whatever exists; we will ask for the gaps.

How your specification affects the price

Once we have the enquiry, the quotation is built up from a small number of variables. Knowing them in advance helps you decide where to spend and where to simplify.

  • Size envelope. Height and width set the panel cuts and the door geometry. A cabinet that runs floor to ceiling, or one that wraps around a corner, is engineered differently from a modest wall unit.
  • Carcass and door material. We work in board materials, lacquered and veneered surfaces, glass and metal frames. Bathroom humidity makes substrate choice and edge treatment a specification point rather than a cosmetic one.
  • Mirror and glazing. Clear mirror, tinted or smoked glass, ribbed glass and framed versus frameless edges all price differently. The same range of door treatments appears across our Clear Glass Wardrobes, so if you are specifying a bathroom and bedroom together we can keep the glass tone consistent.
  • Internal fit-out. Adjustable shelves, shallow trays for bottles, drawers, integrated sockets and shaver points are all quoted as options against the base unit.
  • Lighting. An illuminated cabinet needs an electrical specification: light position, colour temperature, IP rating appropriate to the bathroom zone and the switching method. Confirm these per project; we do not assume a default.
  • Quantity and grouping. Cabinets ordered together with vanities, wall-hung WCs or other bathroom sanitary fixtures are produced and packed in one batch, which simplifies both the unit price and the freight plan.

The enquiry-to-production path

Our workflow follows the same sequence we use on villa and hotel fit-outs: consultation, design and planning, production, logistics, installation, then after-sales support. For a mirror cabinet enquiry specifically it looks like this.

1. Brief and dimension check

We review your drawings and measurements and come back with questions on anything ambiguous, typically the projection depth, the door swing and the position of services behind the wall.

2. Specification and quotation

You receive an itemised quotation covering materials, finishes, hardware, lighting if specified, packaging and freight to your chosen destination. Where a detail is still open, it is listed as an option rather than quietly priced in.

3. Sample and confirmation

Where finish matters, we confirm the board or lacquer sample against your reference before cutting. If you are also ordering joinery, this is the point at which we align colour and handle choices across rooms.

4. Production and inspection

Units are made to the confirmed drawing. Before packing we check door alignment, mirror edges and hardware against the approved specification, and we send you photographs of the finished units.

5. Packing and shipping

Mirrored fronts are protected individually and crated for ocean or air freight. We prepare the commercial invoice, packing list and other export documents, and share tracking through to delivery.

6. Installation and support

We supply fixing details suited to the wall construction you tell us about: stud, timber batten or masonry. We also remain available for alignment queries and replacement parts after handover.

Related configurations worth comparing

Before you lock in a tall format, it is worth checking whether the room suits one of the other units in the same collection. A Santerson LED Mirror Cabinet suits bathrooms where task lighting at the mirror is the priority and the wall space above the basin is limited. A Santerson Round Mirror Cabinet works better in a small powder room or where a softer shape is wanted against rectilinear tiling. Both are specified the same way as the tall version, so one enquiry can cover all three if you want the options priced side by side.

A note on what we do not promise in advance. Dimensions, substrate choices, hardware series, lighting ratings and installation requirements are confirmed per configuration. We would rather settle them on a drawing with you than publish figures that may not match the unit your project needs.

Questions we are asked most often

Can I order one unit to test the quality first?

Yes. A single sample unit can be produced before a batch, and it is a practical way to check finish and internal layout in your own bathroom before committing to quantities.

Can the cabinet match my existing vanity or wardrobe?

Send the colour code or a photograph of the existing joinery. We match board decor and lacquer across the order, which is also how we keep cabinetry consistent throughout a whole-house project.

Do you ship directly to site?

We arrange door-to-door delivery by sea, air or rail and handle the export documentation. Tell us the delivery address and your preferred Incoterms and we will quote freight alongside the cabinets.

What if my wall is not flat or has pipes behind it?

Flag it in the enquiry with a photograph and, if possible, the depth of the obstruction. We design the recess, scribe or cut-out into the carcass so the unit sits plumb on site.

Send us your dimensions. Email santerson@qq.com or contact PHILLIP on +86-13928214007 with the measurements and drawings listed above, and we will return an itemised quotation for your tall mirror cabinet configuration.