A rug quote is rarely a single number. Two buyers can ask for the same "luxury area rug for the living room" and receive prices that differ by several times, because pattern complexity, surface material, size and finishing are all priced separately. If you send your supplier a short list of project details up front, you will get comparable quotations instead of guesses, and you avoid re-making samples after the design is already locked in. Below is the checklist we use when preparing those quotations.

Start With the Room, Not the Pattern

Before discussing designs, tell the supplier how the rug will be used. A living room in a private villa and a hotel lobby that receives luggage trolleys place very different demands on pile height, surface material and backing. Send us:

  • The room type and daily traffic level — family home, guest villa, show flat, lobby lounge or model home.
  • Whether the rug sits under a sofa and coffee table, in front of a fireplace, or floats in an open plan where all four edges are visible.
  • Floor covering underneath: engineered timber, marble, porcelain tile or existing floor finish. Tell us what the rug will sit on so we can confirm a suitable backing; our luxury living room decorative area rugs use high-density weaving for a soft, smooth foot feel.
  • Whether the space has underfloor heating, direct sunlight through full-height glazing, or pets and children in daily use.
  • Your target installation date and the country the rug must arrive in.

Give Exact Sizes and the Shape of the Space

Size is the largest single driver of price, and "about 3 by 4 metres" is not enough to quote from. Please supply:

What we needWhy it changes the quotation
Overall length and width in centimetres, plus shape (rectangle, round, runner)Loom set-up and material usage are calculated per square metre; non-rectangular outlines require hand carving.
Whether the rug must fit a niche, go under furniture legs, or wrap a columnDetermines whether we produce one piece or join panels on site.
Number of identical pieces per floor typeRepeat quantities affect unit price and how much of the design can be shared across a run.
Thickness you expectPile height changes yarn consumption and cost. Our polyester shiny silk area rug, for example, is built at 12 mm total thickness, which sits comfortably in a residential living room without blocking door clearances.
Standard or oversized formatOur standard sizes ship faster; large formats such as 400 x 500 cm are made to order.

Send the Design Reference You Actually Want

A photograph of a rug you like tells us more than a written description. Attach the reference image and, if you have it, the drawing file (AI, PDF or high-resolution PNG). Then confirm three things:

  • Pattern family. Classic Persian and oriental medallions, contemporary abstract textures, or a custom artwork of your own. Our range covers both ends — traditional medallion layouts sit alongside modern abstract art texture area rugs in beige, blue and earth-brown tones.
  • Colour source. Pantone references or a physical swatch. Screen colours vary widely between screens; without a reference we can only approximate.
  • Scale of the motif. A medallion that reads well on a 2 x 3 m rug looks cramped on a 4 x 6 m one. Tell us the room scale and we will rescale the repeat before weaving.
If you are furnishing several rooms or units, send the floor plan and the room list together. We can then propose one coordinated rug family across the project instead of unrelated pieces quoted one at a time.

Specify Surface Look, Pile and Performance Requirements

Surface material decides both price and how the rug behaves after handover. Tell us which of these matter most for your project:

  • Filament or staple surface. Bright silk-effect yarns give a soft lustre suited to formal living rooms; matte textured yarns hide foot-traffic marks better in busy family rooms.
  • Cleaning regime. Housekeeping, professional cleaning or owner self-care. Our woven surfaces are stain-resistant, so everyday spills can be blotted without specialist treatment.
  • Traffic expectation. Hallways and open-plan living areas need a denser, wear-resistant construction than a bedroom.
  • Acoustic and comfort targets. Rugs absorb impact noise — worth stating explicitly in apartments above occupied floors and in villa home theatres.
  • Household safety. Low-odour, eco-friendly raw materials for homes with children and pets.

For full floor coverage rather than a loose rug, the same brief works: our customizable commercial carpet is made to your size, colour, pattern and material specification, with samples available before production.

State the Commercial Terms You Need Quoted

A quotation you can compare line by line should show the following. Ask your supplier to itemise all of them:

Line itemDetail to request
Unit price and currencyPer piece or per square metre, with the exchange basis stated.
Sample cost and lead timeWhether the sample charge is refunded against the bulk order.
Minimum order quantityFlexible MOQs matter for trial orders and phased villa projects.
Packing specificationRoll, carton or crate, with edge protection so the rug arrives flat and ready to lay.
Shipping termsFOB, CIF or door-to-door. We arrange sea, air and rail freight with customs paperwork and tracking, so the destination port or site address should be in the brief.
Production scheduleSample approval date, then production window, stated as calendar dates rather than "a few weeks".
After-sales scopeWhat is covered if a piece arrives damaged or a shade batch varies.

A Short Brief We Can Quote From Today

Here is the format that produces an accurate quotation in one round. Copy it and fill it in:

  • Project name, city, and whether it is a private residence, villa development, hotel or show home.
  • Room list with rug sizes in centimetres and quantities.
  • Reference images and Pantone or swatch colours.
  • Preferred pile look (silk sheen, matte, textured) and required thickness.
  • Floor type beneath and any underfloor heating.
  • Destination address, preferred shipping mode, and required on-site date.
  • Budget range per piece — this helps us steer you to a feasible construction rather than a rejected design.

Frequently Asked Questions

Can I order a sample before committing to a full rug? Yes. Samples are available before production so you can check colour, pile height and hand feel against your own finishes.

Do you make sizes outside the standard list? Custom size, pattern and colour are supported for wholesale and project orders, including large formats such as 400 x 500 cm.

What if I only have a photograph of a rug from another brand? Send it. We use it as a construction reference and quote an equivalent design in our own materials rather than reproducing someone else's artwork.

Can the rug be coordinated with other furnishings in the same project? Yes. SANTERSON supplies furniture and building materials for villa, hospitality and office projects, so rugs can be specified alongside flooring, wall panels, lighting and cabinetry from one supplier.

Send your room list, sizes and reference images to PHILLIP — Phone / WhatsApp +86-13928214007, email santerson@qq.com — or through our contact page. We reply with an itemised quotation and a sample plan rather than a single headline price.