A swim spa of this size only behaves on site if the drawings and the ground beneath it agree. The following walk-through uses Outdoor Swim Spa WS-130BⅬ as the worked example, and covers what a buyer or consultant should lock down on paper before production starts: shell envelope versus clearances, structure and drainage, power and control, delivery access, and the poolside furniture that has to sit around it.

What the catalog record already fixes, and what it leaves open

The published specification for this model gives a cabinet footprint of 9950 × 3000 mm with a depth of 1430 mm, one control system, one swim training system, one water pump, one filter pump, twenty jets, seven LED lights and a total power figure of 10.85 kW. The features listed are water jets, LED lighting, ozone and the swim training system. Treat those numbers as the starting point of a coordination exercise, not as an installation document: the same catalog family also carries the Outdoor Swim Spa WS-130BⅬ-U variant at the same 9950 × 3000 × 1430 mm envelope but with a different pump and jet count, which is precisely why configuration has to be frozen before anyone draws a footing.

Options listed for the range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each of those moves something on a drawing: a heat pump adds plant space and an electrical circuit, sand filtration adds a footprint and a route for media replacement, steps change the access geometry at one end of the shell.

Rule of thumb for the coordination meeting: every item on the specification sheet should have a matching line on either the structural drawing, the electrical single-line diagram or the delivery route plan. If it has none of the three, it is still an open question.

Reading the envelope into the site plan

A 9950 mm long shell rarely fails on length alone; it fails on what surrounds the length. Three dimensions need to appear on the landscape or architectural setting-out drawing before the spa is placed:

  • Plant and filter access. The filter pump and any sand filtration option need a reachable position and a path to it, not just a nominal gap behind cladding.
  • Steps and entry. Steps are listed as an option for the range, and they extend the usable footprint at one end. Fix which end, then set the deck level against it.
  • Maintenance clearance. Jets, lights and the control system all sit on the shell or inside the cabinet; leave enough working space that a technician can reach them without lifting fixed finishes.

Where the spa is partly recessed into a deck, the drawing should also state how the shell is supported along its base and perimeter. A slab sized for the footprint is not the same as a slab sized for a full water volume plus occupants, so hand the 9950 × 3000 mm outline to the structural engineer early rather than at tender stage.

Power, control and commissioning

The catalog figure of 10.85 kW total power is a configuration value. It tells an electrical designer how much capacity to reserve, but the final circuit depends on the options selected, on insulation and heat pump choices, and on what the local supply can deliver. Confirm included equipment and electrical requirements for the selected configuration with the supplier, then have the local engineer size protection, cabling and any dedicated circuits against their own rules.

Commissioning is easier to agree in advance than to argue about afterwards. A practical sequence that works on villa and resort sites:

StageWhat is checkedWho signs it off
Pre-deliveryConfirmed model code, options list, dimensions, power figureBuyer and supplier
Set and levelPosition against setting-out drawing, support arrangement, drainage routeSite contractor
ConnectionsSupply, protection, bonding as designed locally, control system wiringLocal electrical contractor
Function testJets, swim training system, LED lighting, ozone, filtration cycleSite contractor with supplier guidance

Delivery route and access

A shell close to ten metres long is a logistics item before it is an architectural one. The site plan should show the path from the delivery vehicle to the final position: gate widths, turning areas, overhead cables, and whether a crane or a walk-in route is realistic. On tight residential sites this single question often decides between a long model such as this one and a shorter unit from the same range. Freight by sea, air or rail, customs paperwork and door-to-door delivery are services we arrange for project orders, but the last leg across your own ground remains yours to plan, so settle it while drawings are still moving.

Poolside furniture that belongs in the same drawing set

The hard landscape around a swim spa ages badly when the seating is chosen after the deck is laid. Poolside furniture faces the same chlorine and salt-air exposure the spa cabinet does, so it should appear on the same sheet.

  • Aluminum Sling Sun Lounger Collection - Multiple Frame Designs with Adjustable Backrest - developed for commercial poolside use, with textilene mesh that dries quickly after splashing and an aluminium frame treated to resist chlorine and coastal air. Static sled base, wheeled and folding versions let you match the deck layout rather than compromise it. Frame finish and sling colour can be customised to a project palette.
  • Swimming Pools and Swim Spas - the category page where this model sits, useful when a project wants to compare envelopes across the range before fixing one length.

Keeping loungers, cabinets and spa on one drawing package also avoids the common site clash: a lounger recline arc that swings into the spa's steps, or a sun pad placed where the filter pump needs to be reached.

A short specification checklist before order

  • Model code and variant confirmed in writing, including whether the swim training system is included.
  • Dimensions taken from the confirmed configuration, then set out on site by the contractor.
  • Structural support for a full water volume reviewed by a local engineer.
  • Power reservation based on the catalog figure, final circuit design done locally.
  • Options list closed: heat pump, sand filtration, insulation, steps, UV sterilization.
  • Delivery route surveyed and recorded with photographs.
  • Poolside furniture on the same drawing sheet as the spa.

Send us your drawings

If you have a layout, a section through the deck, or only a sketch of the plot, send it over with your shortlist. We will confirm which model and option set fits the envelope, flag what has to be resolved on site, and quote against the same list your consultant is working from - so production does not start while a dimension is still open. Enquiries go through our contact page.