A swim spa that reaches site with the wrong shell size, an unmatched jet layout or an electrical load the distribution board cannot carry turns a straightforward purchase into a rebuild. Before production starts on Outdoor Swim Spa WS-S06C, buyer and factory need to agree one written configuration sheet covering shell size, jet layout, pump set, water treatment, power supply and site preparation. The list below follows that sheet item by item, using the WS-S06C catalogue entry as the working example.

Why confirmation has to happen before production

Swim spas in this range are made to an ordered configuration rather than stocked as one fixed product. Shell, jet positions, pump set and control system are assembled together, so a change requested after the shell is laid up usually means either a replacement shell or equipment retrofitted on site at the installer's cost. Confirming the configuration in writing before production protects both sides: the buyer receives what the design drawing assumed, and the factory produces against an approved document instead of an email thread.

The output of this stage is a single configuration sheet carrying the model code, overall dimensions, equipment list and electrical data. Purchase order, packing list and installation drawings should all refer back to it.

Shell size and how the spa will be set

The catalogue lists WS-S06C at 5880 × 2380 × 1400 mm. Those are the spa's own dimensions, not the space it needs on site. Before production, check three separate measurements against the site plan:

  • The clear delivery route — gate width, turning radius, and how the shell passes from the truck to the pad without lifting over a wall or through a stairwell.
  • The finished pad or plinth, including perimeter drainage and the service clearance needed later for pump and filter access.
  • The relationship between finished water level and deck height, which drives step design, coping detail and how users enter the water.

Depth matters more than it appears on a spec sheet. At 1400 mm overall height, seat depth, jet height above the shell floor and the working position of a swimmer all shift relative to user height. Where the spa serves rehabilitation or older users, fix the step arrangement at this stage rather than after delivery.

Jets, pumps and what the model actually includes

The captured specification for WS-S06C shows 33 jets in total, three water pumps and one filter pump. Jet count is only half the question — layout decides whether the hydrotherapy zone performs as intended. Request a jet position drawing showing each jet's location relative to the seats, and read it against the brief: a massage-led configuration and a training-led one are not interchangeable.

One detail that catches buyers out: the captured specification for this model does not list a swim training system. If the brief calls for daily lap swimming or resistance work, treat that as an open question for the factory before ordering, and ask whether a swim unit can be added to this shell or whether another model in the swim spa range suits the brief better.

Then separate standard inclusions from options. The catalogue lists control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps as optional accessories, with availability and compatibility varying by model. Anything absent from the approved configuration sheet should be treated as not supplied until confirmed in writing.

Water treatment, heating and running cost

WS-S06C is shown with ozone and a temperature setting function. Establish how sanitation divides between ozone and any optional UV sterilisation, which consumables the owner will keep buying, and what filter cycle the filter pump runs by default. For year-round use in a cool climate, the heat pump option and the insulation package are the two line items that decide running cost; price them at quotation stage rather than adding them after handover.

Total power for this configuration is shown as 9.95 kW. That figure has to reach the site electrical designer before the cable schedule is fixed, because it determines supply capacity, protective device sizing and whether a dedicated circuit is required. Send the equipment list with it — the same connected load can produce very different starting currents depending on pump selection.

Customising beyond the standard shell

Where the site cannot accept a rectangular shell, or where the design sets the spa into a terrace edge or courtyard wall, a made-to-shape unit is a different route. The Customizable Shape Outdoor Spa covers square, round, oval and curved forms in an acrylic shell with structural reinforcement, for gardens, terraces and leisure areas. A custom shape opens a design conversation that a catalogue model does not, so allow more lead time and settle the same equipment questions again — jets, pumps, treatment and power do not disappear because the shell changes.

In a villa or resort package the spa rarely stands alone. Poolside loungers, shade structures and wet-area flooring are usually specified alongside it, and coordinating them through one turnkey project solution keeps finishes, delivery windows and site access on a single schedule rather than three.

Documentation to hold before the order is released

  • Configuration sheet — model code, dimensions, jet count with layout drawing, pump set, treatment system, options included.
  • Electrical data — total connected load, supply requirements, control system details, earthing expectations.
  • Delivery plan — packing dimensions, container arrangement, access route checked against the site plan.
  • Site preparation scope — who builds the pad, who runs the supply and who makes the connection, agreed in writing before shipment.
  • Spares and service items — consumables and replaceable jets and seals listed on the packing list so later replacements match.

Each of these is inexpensive to settle on paper and costly to alter after production begins. Where a figure or an inclusion is unclear on the product page, raise it as a written question and get the answer onto the configuration sheet instead of working from an assumption.

Send us your site plan, intended use and delivery location, and our team will confirm the WS-S06C configuration — shell, jets, treatment system and electrical data — in writing before production begins. Enquiries go through our contact page.