A handleless concealed door looks simple on site: a flush leaf, no visible frame line, no hardware. Ordering one is not simple. The result depends on the wall build, the opening, the hidden hardware and the finish schedule, and those items usually sit with three different suppliers. OEM sourcing brings them under one specification. Below is how that process runs for our Santerson Handleless Concealed Doors, from the drawings you send to the delivered crate, covering residential projects where a door has to read as wall.

What Changes When You Buy These Doors as OEM Product

A stock door is bought against a size chart. An OEM concealed door is made against your project: opening widths and heights taken from site survey, the wall build it will sit in, the swing direction, the threshold detail, and the surface that has to match the surrounding Wood Veneer Panels or painted panelling. On our side this means the door leaf, the concealed frame and the hidden hardware are configured to one set of dimensions before production starts, rather than adjusted on site.

For villa and apartment packages this matters most where several doors repeat across floors. One agreed detail drawing, approved once, is repeated through the unit types, so the second and tenth door arrive with the same setting-out, the same finish code and the same leaf thickness.

Step 1: Send the Information We Need to Quote

A quotation for handleless concealed doors cannot be built from a room list. What we need at enquiry stage:

  • Door schedule. One line per opening: reference number, clear opening width and height, leaf thickness required, swing direction and hand, and whether the leaf is single or double.
  • Wall build. Stud and lining arrangement, total wall thickness, plasterboard or other board type, and the structural support available above the head. Concealed frames need a solid fixing line; a hollow partition behaves differently from a masonry wall.
  • Finish intent. Painted to match the wall surface, lacquered, wrapped in veneer, or matched to the paneling system running alongside the door.
  • Hardware expectations. Concealed hinge type and load class, whether an overhead closer is required, lock or privacy set, and any access requirements for service openings.
  • Delivery and packaging needs. Project address, container or consolidated shipment, labelling by room reference, and any private-label requirement.
Send survey dimensions, not design dimensions. Where a drawing dimension and the site dimension differ, we make the door to the agreed confirmed figure and record which one was used, so nothing has to be trimmed on site.

Step 2: Confirming the Detail Drawing

Before cutting anything, we return a shop drawing for each door type. This is where OEM sourcing earns its keep. The drawing fixes:

  • The relationship between the leaf face and the finished wall surface, including the shadow gap or flush detail you want.
  • Frame profile depth against your wall thickness, so the frame does not project into the wrong side of the partition.
  • Hinge positions and the number of hinges for the leaf size and weight.
  • Edge treatment and where the finish break happens on each side of the leaf. An exterior face and an interior face can carry different finishes on the same door.

Our Santerson Decorative Concealed Doors and Flush Wall Aligned Doors follow the same drawing-approval route, which is useful when a project mixes a fully flush leaf in the living areas with a decorated leaf in bedrooms and still needs one consistent wall line.

Step 3: Materials, Finishes and Matching to Adjacent Work

Handleless doors disappear into the wall, so the finish is doing all of the visual work. Two points decide whether the result reads as designed or as a compromise:

Match the door leaf to the surface beside it, not to a sample card

Where doors sit in panelled walls, we make the leaf in the same material and finish code as the adjacent panels. Veneer leaves are cut from boards batched with the Integrated Door & Paneling work, so grain direction and tone run across the opening without a visible break. Where the wall is painted, the leaf is supplied ready for the site finish system you specify.

Specify hardware as part of the door, not as an afterthought

Concealed hinges carry the leaf; a hinge under-rated for a tall, heavy veneer leaf sags within a year and the flush line is lost. We quote the hinge load class against the finished leaf weight, including the weight of the applied finish, and state it on the drawing rather than leaving it to whoever installs.

Step 4: Production, Inspection and Labelling

Once drawings are signed off, doors enter production as a labelled batch. Each leaf and frame set carries its schedule reference, so crates arrive on site matched to room numbers instead of arriving as an unsorted stack that the installer has to work out. Before shipment we check dimensions against the approved drawing, finish condition, and that each opening's hardware set is packed with its own door.

Our Custom & OEM Service covers bespoke material and finish selection, prototyping where a new detail has to be proved before the full batch runs, flexible order quantities across unit types, and branding or packaging requirements if you supply doors under your own label.

Step 5: Shipping, Installation Support and Snags

Doors travel badly when they are packed flat against each other with no edge protection, so concealed-frame sets ship with the leaf protected and hardware separated and documented. Our Logistics & Door-to-Door Delivery service handles freight booking by sea, air or rail, the export paperwork and container loading, with delivery arranged to the project address.

Installation of a concealed door is where most projects go wrong if the wall was prepared on assumptions. We issue the setting-out dimensions for each opening before the boards close up the partition, which costs nothing at that stage and avoids cutting back finished walls later. Installation & After-sales Support covers inspection of delivered goods, snag lists and replacement parts where a component is damaged in transit or on site.

A Typical OEM Timeline for One Villa Package

StageWhat the buyer providesWhat we return
EnquirySchedule, wall build, finish intentPriced options and points to resolve
Survey checkConfirmed opening dimensionsShop drawings per door type
ApprovalSigned drawings, finish codesProduction order confirmation
ProductionPack and labelling listBatch with schedule references
ShipmentDelivery address, access notesFreight documents, crate manifest
On siteSetting-out before wall closureSnag list and replacement parts

Durations depend on the door count, the finish route and the shipping method, so we confirm them per order rather than publishing a fixed lead time.

Common OEM Mistakes to Avoid

  • Ordering doors before the wall build is fixed. Frame depth has to suit the finished wall thickness, including the board and finish layers.
  • Treating hardware as a site purchase. Concealed hinges and closers must be quoted against leaf weight and built into the frame preparation.
  • Matching veneer from a catalogue swatch. Batch the leaf with the paneling run, or accept that tone will differ under site lighting.
  • No setting-out issued before plasterboard. A concealed frame fixed after the wall is closed means opening up finished work.
  • Unlabelled crates. With repeated unit types, room-reference labelling is what keeps installation moving.

Send us your door schedule. Include opening dimensions, the wall build and the finish you want the leaf to disappear into, and we will price the handleless concealed doors for your project and return shop drawings for approval.