A media wall looks like a single line item until it touches three other trades at once. Full-height joinery has to clear the finished floor-to-ceiling height, carry a screen and its bracket, keep low-voltage and mains wiring reachable, and still read as a continuous finish next to the wall panelling and flooring already on your schedule. If the entry simply says "TV wall, as per design", you will resolve all of that in a site variation instead of on paper. Here is how we place Santerson Full Height Media Walls inside a whole-project materials schedule, so the item prices cleanly, arrives with the right components and installs without holding up the trade that follows it.

Start from the wall system, not the screen

In our catalogue this item sits in the Media & TV Walls group as a configurable system: finish, layout and dimensions are set per project rather than chosen from a fixed size list. That one fact changes how it belongs in a schedule. A loose sofa can be scheduled by collection and confirmed later. A full-height media wall behaves like built-in joinery - it needs an opening dimension, a material and finish call, and a decision about what sits behind the panel.

So before anyone prices it, we settle three points with the design team: the finished floor-to-ceiling height at that wall, including any floor build-up still to come; the screen size and its mounting method; and how much of the wall is closed storage, open display and panel cladding. Everything else in the schedule entry follows from those answers.

Write a line item that can be priced and inspected

Unclear media-wall entries cause most of the rework we see on villa and apartment packages. A workable entry carries enough description for one supplier to price it and one site supervisor to check the delivered product against it. We build ours with these fields:

  • Reference and location - the room, the wall gridline and the drawing number that governs it.
  • System type - full-height media wall, wall-mounted media wall or integrated TV panel, named so any substitution is obvious.
  • Dimension basis - finished height and width, with a note on which levels are final and which are still provisional.
  • Substrate, finish and edge detail - the specified board and surface, plus how the panel meets ceiling, floor and the adjacent wall.
  • Storage configuration - open niches, closed cabinets and drawer banks, and which fronts are hinged or sliding.
  • Services - screen power, signal cabling, where devices sit inside the carcass, and any integrated lighting circuit.
  • Approval status - shop drawing reference and approval date, not "to be advised".

That last field matters more than it looks. Once the media wall is approved at shop-drawing stage, the same drawing fixes the wiring routes for the electrician, and there is nothing left to argue about on site.

Coordinate it with the finishes around it

A media wall rarely stops at its own width. On most projects it runs into wall panels and wall cladding, sits on an engineered timber floor, and sometimes carries a lighting circuit that also feeds the joinery beside it. We schedule those items as one group so the finishes are approved together, rather than through three separate submissions that arrive with three different wood tones.

Schedule itemWhat has to matchWhen we close it out
Full height media wallFinished height, finish code, screen recess, service openingsBefore the first electrical fix
Wall panelling and claddingBoard thickness, finish and joint detail where it meets the media wallTogether with the media wall shop drawing
Flooring at the wall baseThreshold and skirting detail, floor build-up heightBefore the carcass is templated
Integrated lightingCircuit route, driver location, switching pointWith the media wall electrical note

Where the same run includes concealed doors or sliding panels, we schedule those as their own lines and check their frame details against the media wall on a single elevation. Two suppliers working from two different elevations is how gaps appear at the reveal.

Pick the configuration family early

Not every wall in a project wants the same build. In the same Media & TV Walls group we list Santerson Integrated TV Panels for screens set flush into panelling, and Santerson Sliding Panel TV Systems where the screen needs to be out of sight when the room is in use. For lighter applications, wall-mounted units in the media and TV furniture range carry less built-in depth. Deciding the family at schedule stage keeps carcass depth consistent from room to room - a difference of tens of millimetres is invisible on a drawing and very visible once a door has to clear it.

Keep the procurement path in one place

Media walls, panelling, joinery and flooring usually come from different vendors on one project, each with its own lead time and packing standard, so coordination lands on whoever holds the schedule. We work as a one-stop furniture and building materials supplier, which means these items are quoted, produced and packed under one purchase order: media wall carcasses ship with their panels, hardware and fixing details, and the packing list states which components belong to which room. Fewer handovers also means fewer missing parts on installation day.

Two points we confirm in writing before production release: the final finished levels at the media wall, and the screen model with its bracket type. Both change the internal build, and both are cheap to correct on paper and expensive to correct after machining.

A short pre-production checklist

  • Finished floor levels signed off for that room, including any screed or adhesive build-up.
  • Screen model, bracket type and cable entry point recorded on the shop drawing.
  • Closed and open storage layout agreed with the client, with door swing or slide direction marked.
  • Finish sample approved against the panelling and flooring already selected.
  • Service openings, driver location and access route confirmed for later maintenance.
  • Packing list matched to room numbers so the install crew opens only what it needs.

Configurations are made per project. Dimensions, materials, hardware, electrical ratings and installation requirements should be verified for each job before production release.

Send us the wall you are scheduling

If a full-height media wall is already on your schedule, send the elevation, the finished levels and the screen you plan to mount, and we will return a specification covering dimensions, finish options and a configuration that fits the rest of your package. If it is not on the schedule yet, tell us the room and how the wall will be used, and we can help you write the line item before it turns into a site query.