A freestanding TV cabinet looks simple on a schedule of work: one unit, one living room, one line item. On a villa or hotel fit-out it is rarely that simple. The unit has to carry the television, hide the wiring, match the joinery already specified elsewhere in the project, survive housekeeping and guest use, and still arrive intact after an ocean crossing. The checks below are the ones worth running before you choose a freestanding TV cabinet supplier.
Why the freestanding unit is harder to buy than it looks
Built-in media walls are drawn into the architectural joinery package, so their dimensions travel with the drawings. A freestanding TV cabinet sits outside that package. It is usually procured late, treated as loose furniture, and then expected to line up with wall panelling, flooring and lighting that were fixed months earlier.
That gap between "loose item" and "part of a coordinated interior" is where most problems start: a cabinet that is 80 mm too wide for the recess, a finish that reads warm next to a cool veneer, an open shelf that exposes a tangle of HDMI and power runs, or a plinth that will not clear the floor covering the contractor finally laid. A supplier who understands project work will ask about these constraints before quoting; a catalogue seller will not.
1. Confirm made-to-measure is genuinely available
Ask whether width, depth and height can be changed per unit, or whether you are only choosing between fixed sizes. On the Santerson TV cabinets and media units line, configuration is listed as made-to-measure sizing with material and finish options and a layout tailored to the project. That is the standard to hold suppliers to: dimensions driven by your drawings, not by what the factory already has tooled for.
Then check what "custom" covers in practice. Can the mix of drawers, open display niches and cable-management compartments be changed? Can the top be notched for a soundbar or a TV bracket plate? Can the plinth height be adjusted for the floor build-up? A supplier offering custom and OEM service should answer these with specifics rather than a general promise.
2. Ask what the specification actually fixes
Product pages for configurable furniture list finish, layout and dimensions as selectable, but they rarely pin down board substrate, edge treatment, hinge and runner brand, or panel thickness. None of that should be assumed. Before you place an order, request a written spec sheet per item and confirm:
- the carcass and door/drawer-front materials and the finish system;
- hardware brand and model for hinges, runners and any soft-close fittings;
- how cables and sockets are accommodated — grommets, cut-outs, a rear recess;
- whether the unit ships assembled or flat-packed, and how it is protected for sea freight;
- the exact colour or grain reference, matched against samples rather than a screen.
Configurable listings carry limited technical detail on the page itself. Treat the missing information as questions to close in writing, not as minor points to settle after production starts.
3. Check that the range covers adjacent media items
Living rooms rarely need one media item. A guest suite may need a cabinet; a lobby may need a wall-mounted media wall; a penthouse living room may need integrated LED media units that tie into the lighting design. Buying these from one source means one finish library, one set of drawings, one container and one point of accountability. Sourcing them separately means three suppliers arguing about who owns the mismatch.
This is where a supplier of furniture and building materials earns their fee. The same factory drawing the media unit can also supply the wall panelling behind it, the flooring under it and the lighting above it, so the junctions get resolved on paper before anything is cut.
4. Test how the supplier handles coordination across trades
A TV cabinet touches the electrical contractor (sockets, data, bracket power), the wall finisher (fixings, recess), the floor layer (plinth clearance) and sometimes the AV integrator. Ask a prospective supplier how they receive dimensions, who signs off the setting-out drawing, and what happens when the site condition changes after production has begun.
Santerson describes a staged workflow running from consultation and design through production, logistics, installation and after-sales support, including project design coordination with drawings and on-site guidance. Whatever the supplier claims, ask to see one real example: a setting-out drawing for a media wall, marked up against the electrical layout.
5. Get the freight and handover terms in writing
Freestanding casework is high-value, low-tolerance cargo. Confirm who arranges the shipment, what the packaging specification is for drawer fronts and glass or lacquered panels, whether customs paperwork such as commercial invoices, packing lists and certificates of origin are provided, and where your delivery obligation ends — port, kerb or room of installation. Santerson's logistics service covers freight forwarding by sea, air and rail with customs documentation and door-to-door delivery; the applicable Incoterms, duties and transit window for your port still need to be confirmed per shipment.
6. Compare the mounting options before you commit
Freestanding is not automatically the right answer, and a good supplier will say so. Use this as a working guide:
| Situation | Option worth comparing |
|---|---|
| Rental, staged sale, or furniture likely to be re-sited | Freestanding TV cabinet — no wall works, easy to move |
| Thin partitions, tiled or stone-clad walls with uncertain fixing points | Freestanding — avoids structural fixings altogether |
| Small floor area, and you want the floor visually continuous | Floating TV unit with a concealed wall carrier |
| Hotel lounge or show apartment where the wall is the design statement | Media wall or integrated panel system, drawn into the joinery package |
| AV equipment to be hidden but serviced regularly | Cabinet with rear access and hinged or sliding fronts |
Whichever option you choose, ask the supplier to price the alternative as well. A like-for-like comparison of a freestanding cabinet against a floating unit or a panel system usually exposes where each quotation is thin — usually on carriers, rear access and finish continuity with the surrounding wall.
7. Verify the company behind the quotation
Company figures on marketing pages are not procurement evidence. Santerson states it has operated since 2008 as a China-based manufacturer and one-stop provider, with offices listed in China, Vietnam, Singapore and South Africa; published factory-area and export percentages differ between pages, so confirm the current figures directly rather than repeating them in your own board papers. Ask for the factory address, a video or in-person audit, references from comparable projects, and the named contact who answers after the deposit is paid — the site lists PHILLIP as its contact with phone/WhatsApp +86-13928214007.
Published project references are a useful filter. The site shows villa work in Willoughby, North Turramurra, Perth, Melbourne and Sydney; treat those as locations to ask about, not as proof of scope, dates or performance on your project.
A short pre-award checklist
- Made-to-measure dimensions confirmed against your drawings, in writing.
- Full material, finish and hardware specification signed off with physical samples.
- Cable, socket and bracket provisions agreed with the electrical contractor.
- Adjacent media and wall items sourced from the same finish library where possible.
- Incoterms, packaging spec, delivery point and damage-replacement route defined.
- Named project contact, plus a documented after-sales and spare-parts route — see installation and after-sales support.
None of these checks take long. What they prevent is the expensive outcome: a made-to-measure cabinet that arrives correct to its own drawing and wrong for the room.
Send the drawings, not just the enquiry. Share the room layout, the wall build-up and your AV requirements, and ask for a configuration proposal that covers dimensions, finish references, packaging and a freight quotation in one package.
Contact SANTERSON — PHILLIP, phone/WhatsApp +86-13928214007, santerson@qq.com. Enquiry form: Contact us.