A glass folding door looks simple on a drawing and complicated on site. Panels have to fold in the right direction, stack against the right wall, clear the floor finish, and arrive at the same opening size the builder framed months earlier. The checklist below is the one we ask buyers and project teams to work through before an order for Santerson Glass Folding Doors is released to production. Every item is something you can confirm on paper or on site, and each one prevents a variation once the doors are already in manufacture.

1. Opening and layout items

Before any finish decision, fix the geometry. Our folding door products are made to measure, so the opening is defined by your drawings rather than by a standard frame size.

  • The clear opening width and height at three points each, taken off the finished floor and finished ceiling levels, not the structural slab.
  • Which side the panels stack to when open, and whether that wall is clear of switches, radiators, cabinetry or curtain boxes.
  • The number of leaves you want in the run, and whether a single traffic leaf is needed so people can pass without unfolding the whole set.
  • The stacking depth when folded, checked against any reveal, niche or return wall the stack has to sit inside.
  • Headroom above the opening for the track, and floor build-up from finished level to structural slab for the bottom guide.
  • Whether the opening is square and plumb, and who is responsible for bringing it into tolerance before installation.

2. Glass and frame specification items

This is where most enquiries are incomplete. Santerson's folding door pages list made-to-measure sizing plus material and finish options, so the specification has to be written out and confirmed rather than assumed from a photograph.

Item to confirmWhat to record on the order
Glass typeClear, frosted or smoked glass, plus any option for laminated or insulated units where the project calls for it. Confirm the make-up with our team for your application.
Frame materialAluminium frame construction, with the finish colour or treatment stated by name and sample reference.
HardwareHinges, handles, track, bottom guide and any lock or latch, matched to the leaf count and duty of the opening.
Leaf layoutPanel widths across the run, folding direction, and stack side, shown on a marked-up drawing.
Sign-offA named approver for the final shop drawing, with the date of approval recorded against the order.

Where a project uses glass elsewhere, keep the specification consistent. The glass partitions we supply for bathrooms and internal screens are specified the same way, so matching glass tone and frame finish across doors and partitions is a decision worth making once, early, instead of twice under time pressure.

3. Application-fit items

A folding door that works as a kitchen servery will not behave the same way as one closing off a study. Decide the duty before the specification closes:

  • Daily internal separation — a study, gym or dressing room opened and closed often needs smoother hardware and a traffic leaf.
  • Occasional opening to a terrace or garden — the priority is a clear stack when open and weather sealing at the threshold; in these positions some buyers compare a folding set with glass sliding doors, which need no stacking space at all.
  • Showroom, office or hospitality use — sightlines, acoustics and public-duty hardware come first, and the finish has to hold up to frequent handling.

Santerson Glass Folding Doors, made to measure for residential projects

Santerson Glass Folding Doors — made-to-measure sizing, material and finish options, with a layout tailored to each project.

4. Documentation and approval items

  • A dimensioned opening drawing showing finished floor levels, the folded stack, and the swing or fold clearance.
  • A signed shop drawing for the door set itself, with leaf widths, glass make-up and hardware schedule.
  • Written confirmation of the glass type, frame finish name and hardware model as they will be delivered.
  • The trade interface list: who sets the track, who makes good the floor threshold, who finishes the reveal.

5. Supply, delivery and installation items

Folding doors fail on schedule more often than on quality, because the joinery trade needs the track set before floors are laid and the door supplier needs confirmed openings before production starts. Our workflow covers design and planning, production, logistics, installation and after-sales support, with freight by sea, air or rail and door-to-door delivery arranged for the project address. For a villa or hospitality fit-out, it is usually easier to place doors together with the joinery, panelling and other turnkey interior project items on one order, so a single production schedule covers all of it.

  • Delivery address, access constraints and the delivery window agreed with the site team.
  • Packaging and container loading confirmed against the door sizes on the approved drawing.
  • Installation responsibility: our on-site installation support, or your own crew working to our drawings.
  • Snag inspection at handover, plus what is covered for warranty, spare parts and later maintenance.

6. Budget and risk items

  • Whether the quotation covers hardware, track, glass and installation, or only the door leaves.
  • The cost difference between the base specification and any upgraded glass make-up or hardware duty.
  • The cut-off date for drawing approval; after it, dimension changes normally re-open production.
  • A named contact on our side for queries during production and delivery.

The short version of the checklist

Six groups of items decide whether a glass folding door order runs cleanly: opening geometry, glass and frame specification, application duty, drawings and approvals, supply and installation responsibility, and commercial terms. If all six are written down and signed before production starts, the site team is not waiting on a door that was built to the wrong opening.

Send us your opening drawings

Share the plan, section and finished floor levels for your openings and we will return a made-to-measure folding door layout with material and finish options priced for your project. Santerson has manufactured furniture and building materials since 2008 and supplies villa, hospitality and office projects with custom products coordinated through one order. The range also covers classic folding doors and wood veneer folding doors for openings where a solid leaf suits the scheme better than glass.

Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com. You can also send your drawings through our contact page, where enquiries receive a reply within 24 hours during business hours.