An outdoor swim spa is one of the few items on a villa or resort specification that has to satisfy three different trades at once: the architect who draws the deck, the landscape contractor who sets the level, and the electrical engineer who has to supply and protect the load. The Outdoor Swim Spa WS-PC08ST-L is a long single-channel model in our configurable swim and hydrotherapy range, and it is a good example of the information a manufacturer needs before a quotation can be trusted. The checklist below is the same one our project team works from, so you can send it with your first enquiry instead of exchanging three rounds of email.

Start With the Footprint, Then the Working Envelope

The catalogue lists this model at 8490 mm long, 2400 mm wide and 1470 mm deep. Those three numbers describe the shell, not the space you will actually build around it. For setting out on site, ask for four dimensions rather than three:

  • Shell footprint — length and width at the widest point, including any cladding or step package once selected.
  • Water depth and coping level — how far below the finished deck the water line sits. This decides whether you are building a flush installation with an overflow edge or a raised vessel on a prepared platform.
  • Plant-room or access zone — the side or end that needs to stay reachable for the filter pump, control system and any optional heat pump. A swim spa installed against a boundary fence with no service access becomes a maintenance problem in year two.
  • Circulation clearances — entry and exit points, plus space for steps if you add them as an accessory.

Send the deck layout or landscape drawing with these gaps marked. Our design team can then confirm whether the 8490 mm channel fits your terrace run, or whether a shorter variant from the same range is the better fit — the standard WS-PC08ST shares the same depth and width at an 8000 mm length, so a shortfall of half a metre is usually resolved by model choice rather than by moving walls.

What the Catalogue Specification Already Answers

For the WS-PC08ST-L, the published specification covers the points that normally drive the first technical conversation:

Catalogue dimensions8490 × 2400 × 1470 mm
Swim training system1 set — the counter-flow unit that defines the swimming channel length
Jet total6 pcs for hydrotherapy seating
Filter pump1 pc
Control system1 set
LED lights4
Total power (as catalogued)6.55 kW
Features shownWater jets, LED lighting, ozone, swim training system

Two entries in that table deserve attention before an electrical design is signed off. The water pump quantity is not listed on the catalogue page for this configuration, and total power is shown as a single figure of 6.55 kW. Both depend on what you add: a heat pump, a second water pump or sand filtration will change the connected load, and in some configurations the catalogued figure reflects the base build only. Treat 6.55 kW as the starting point for a conversation with your engineer, not as the final circuit sizing.

The figures above are transcribed from the product page for this model. Where an item is shown as not listed, we confirm it in writing against your selected configuration before production rather than assuming a value.

Electrical and Services Inputs We Need From You

Electrical work is where swim spa projects most often stall. Provide these details with the enquiry and the quotation can include the right equipment first time:

  • Supply characteristics — voltage, frequency and whether three-phase power reaches the plant area. This determines which pumps and heating options are practical on your site.
  • Circuit capacity and protection — the rating available at the intended distribution board, plus any local requirement for residual-current protection or dedicated isolation.
  • Heating decision — whether the spa will be heated year-round, seasonally, or left unheated. It drives both the power figure and the insulation package.
  • Water supply and drainage — a fill point, and a route for drain-down during maintenance. Drainage usually has to be designed by the local contractor, so flag it early in the landscape drawings.
  • Control placement — where the control system should sit relative to the seating area and the plant access zone.

We do not design or certify the on-site electrical installation. What we do is state, clearly and in writing, what the selected configuration draws and what it needs, so your local engineer can size the supply to their own code. That division of responsibility is worth agreeing at quotation stage.

Configuration Choices That Change Both Price and Footprint

The catalogue lists options across the swim and hydrotherapy range: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each one against your selection before an order is placed. Three of them have physical consequences you should plan for:

  • Heat pump — adds a unit that needs air movement and drainage, and materially raises the connected load.
  • Sand filtration — replaces a compact cartridge arrangement with a vessel that needs its own footprint and access for backwashing.
  • Insulation — affects how the shell sits in a cold-climate installation and how much energy heating consumes over a season.

If your project calls for something outside the standard catalogue geometry, we also build customizable shape outdoor spas with acrylic shells in square, round, oval and curved layouts. Those are specified from your space rather than from a model number, which is often the cheaper route on an awkward terrace than forcing a standard shell into it.

How This Fits Into a Larger Fit-out

A swim spa rarely arrives alone. On villa and hospitality projects it normally sits in the same procurement package as poolside loungers, cabana daybeds, hardtop gazebos, exterior paving, and the lighting and bathroom fixtures that serve the changing areas. Coordinating those items with one supplier keeps finishes, delivery windows and site handover on a single schedule — which is the practical reason we work as an one-stop furniture and building materials supplier rather than shipping each element separately. Our project workflow runs through consultation, design and planning, production, logistics, installation support and after-sales, and the swim spa specification above is what makes the production stage unambiguous.

Send us your deck drawing and supply details

Include the four footprint dimensions, the available electrical supply, and which options you want priced — heat pump, UV sterilisation, sand filtration, insulation and steps. We will confirm the included equipment for that configuration and quote against it. Enquiries are handled through our contact page.