A curio cabinet is one of the smaller items on a villa or apartment fit-out schedule, yet it is usually specified for a room that already carries a lot of joinery: the living room wall, the study, the hallway run. Because the piece sits inside a fitted scheme rather than standing apart from it, the details you send to the factory decide whether it reads as part of the architecture or as an awkward extra. Below are the project details that actually change the specification of Santerson Curio Cabinets, and what to confirm at each point.
Start with the opening, not the cabinet
Curio cabinets in this collection are made-to-measure, so the first decision is how the unit meets the surrounding build. Three situations come up on residential projects:
- A recess or niche. You send the finished-recess dimensions - width, height and depth measured to the completed surfaces, not to the structural shell - and state which finishes are already installed on the reveal edges so the carcass can be detailed to close them off.
- A full-height wall run. Here the cabinet becomes one module in a larger storage or media wall. The relevant details shift to floor-to-ceiling height, skirting treatment, and whether the adjoining units are being ordered from the same batch so that veneer match and lacquer sheen carry across.
- A surface-mounted or wall-fixed unit. Where nothing is built in advance, the fixing method, the load path in the wall behind, and the clearance needed for door swing all have to be settled before drawings are signed off. Santerson's wall mounted display cabinets follow the same made-to-measure approach, so the wall build-up matters just as much.
Send dimensions from the latest issued-for-construction drawing rather than a concept layout. Remeasuring after the floor finishes go down is normal on site, but every change to a finished floor level moves each cabinet height on the sheet, and it is far cheaper to absorb that change in the factory than on site.
What you plan to display changes the internals
"Display cabinet" covers two quite different briefs. A porcelain or glassware collection needs shelf depths, spacing and edge detailing that keep objects visible from a standing viewing position. Books, framed art and sculptural pieces need different shelf loading and different back-panel treatment. If the display will change over the life of the project, say so - adjustable shelving on a pitch is a specification detail, not an afterthought.
Two adjacent options are worth comparing at the same time, because the wrong choice is the most common reason these units disappoint: open display units suit objects that are rotated and dusted regularly, while a glazed front protects collections and keeps housekeeping light in a household or hospitality setting. For projects where the storage wall carries both duties, open display niches inside an integrated wall keep the display moments without adding another free-standing box.
Glass, frame and finish have to match the room
The collection is configurable in material and finish, so the details worth fixing early are the ones that other trades will copy: glass type, frame profile, and surface finish. The glazing options catalogued across the wider wardrobe and cabinet ranges - clear, frosted, ribbed and smoked glass - behave differently under the same lighting scheme: one reads transparent, another reads as a tinted plane, and a third breaks up whatever sits behind it. Frameless aluminium-frame glazing and a fully framed timber door also cast different shadows, which matters when the cabinet is on a wall that already has shadow gaps and reveals.
Where the curio cabinet shares a wall with other joinery, specify it against the same finish reference as the neighbouring work rather than describing the colour in words. Requests such as "matte grey" or "oak" mean different things across suppliers; a finish sample, a batch note or a matching existing page removes the argument later.
Lighting is an electrical detail, so settle it early
Interior lighting turns a cabinet into a display, and it is also the item most often left too late. If the brief calls for built-in illumination - as in the Santerson illuminated display cabinet - then confirm the light source specification, driver location and switching before first fix, because the cable and the driver access both travel inside the carcass and the wall. Santerson's integrated cabinet lighting is configured per design, so electrical ratings and compatibility are confirmed against the cabinet drawing rather than chosen from a catalogue.
Practical points to record on the drawing: which surface the light falls on, whether colour temperature matches the room's other fittings, where the driver sits and how it will be reached for maintenance, and whether the switch is at the unit or on the wall circuit. Confirm these with your electrician; the cabinet manufacturer can build to whatever is agreed, but cannot retro-fit a decision after the carcass ships.
Site conditions and the delivery sequence
Because these cabinets are built to project dimensions in the factory and shipped to site, the logistics details belong in the specification conversation. Confirm the room access route - lift car dimensions, stair turns, door widths - before finalising a single-piece carcass, and confirm that the recess is complete, level and dry before the unit arrives. Where a project spans several countries, freight method, packaging, container loading and import paperwork are handled as part of the order; SANTERSON's logistics service covers sea, air and rail forwarding with door-to-door delivery, and installation and after-sales support follow the shipment. Confirm transit time, duties and delivery scope for your own address rather than assuming a standard lead time.
Project details to send with your enquiry
- Finished-recess or installed-position dimensions from the current construction drawing, including floor finish levels.
- What will be displayed, and whether shelf spacing should be fixed or adjustable.
- Glazed front or open shelving, plus the glass type if a glazed front is chosen.
- Finish reference matched to adjacent joinery - sample, batch or existing specification page.
- Lighting requirement, driver location, switching and access for maintenance.
- Access route to the room, and the date the recess will be handed over complete.
If you are specifying display joinery for a villa or apartment project, send us the drawings and the display brief together. SANTERSON works as a one-stop furniture and building materials supplier, so the cabinet, the surrounding wall system and the finishes around it can be produced from the same set of approved details - see glass front display cabinets for the glazed variant, or contact us to have a configuration priced against your drawings.
Dimensions, materials, finish and technical details are confirmed per project for each selected configuration, so the details listed above are the ones worth locking down before drawings are approved.