A media unit that mixes open shelving with closed cabinets looks simple on a mood board and complicated on site. Doors, shelves, cable routes, finishes and clearances all have to agree before the first panel is cut. This guide walks through what Santerson Open & Closed Combo Units actually is, what you can and cannot fix at the enquiry stage, and which questions move a quotation from a rough number to a buildable one.

What the product line covers

Open & Closed Combo Units sit inside the TV Cabinets / Media Units collection, alongside Freestanding TV Cabinets, Wall Mounted Media Walls, Glass Front Media Units and Integrated LED Media Units. The listing describes configurable media units that combine open and closed storage, with finish, layout and dimensions specified to suit each space. That is a made-to-measure built-in, not a flat-pack unit you pick a size from.

Two practical consequences follow. First, price follows configuration: how much of the wall you close off, how many doors and drawers, which carcass and door material, what sits behind the open bays. Second, the specification has to be settled by drawing rather than by catalogue code, which is why the enquiry stage matters more than usual.

Decide the split between open and closed before you talk finishes

The open-to-closed ratio drives everything downstream: storage capacity, visual weight, cleaning effort and cost. Work it out from how the room is used, not from a photograph.

  • Household clutter: if devices, games, chargers and paperwork live under the television, closed storage should dominate and the open bays stay shallow and few.
  • Display intent: books, ceramics and framed pieces need open bays sized to them, plus a decision about whether they are lit.
  • Dust and cleaning: open shelving in a high-traffic living room or a coastal house is ongoing maintenance. Fewer, deeper bays are easier to keep tidy than many narrow ones.
  • Child safety: heavy items belong behind doors and in lower drawers; glass-front sections need tempered glass and hardware confirmed for the application.

A useful rule of thumb: count what has to disappear, then give it a home before you allocate anything to display. Most rooms that read as cluttered have too much open shelving relative to their storage load.

Check the television and equipment constraints early

The screen is the one element with fixed dimensions, so it should set the geometry rather than follow it.

  • Screen size and mounting: confirm the model, its weight and whether it is wall-mounted on a reinforced backing or supported by the unit. Solid-core sections and fixing details need to be planned into the carcass.
  • VESA position and viewing height: settle seated eye height first, then place the screen; shelf heights follow from that, not the other way round.
  • Ventilation: if the television or a receiver sits inside a closed bay, ask for the ventilation route and clearance rather than assuming the cabinet will absorb it.
  • Cables and power: count sources now: television, soundbar, console, streamer, lamp sockets in lit shelves. Ask where the trunk runs, where the back panel is cut out, and whether socket outlets sit behind an access panel you can reach.
  • Remote operation: infrared does not pass through solid doors. Decide which devices stay behind glass or in open bays, or plan for a repeater.
Ask for the back-panel arrangement in writing: which sections are fully open to the wall, which are panelled with cut-outs, and where the cut-outs sit. That single detail settles most on-site surprises.

Read the specification sheet the way a buyer should

Configurable listings carry limited technical detail on the product page itself. Dimensions, materials, hardware, safety details and lighting are confirmed per project, so the quotation you receive is the document to interrogate.

ItemWhat to ask forWhy it matters
DimensionsOverall width, height and depth; plus the size of each open bay and each closed compartmentBays sized after the fact will not fit your equipment or display pieces
Carcass and door materialBoard type, edge treatment and finish for each visible surfaceVisible edges and interior surfaces are priced differently
Doors and drawersHinge and runner specification, soft-close or standard, handle or push-openHardware quality is where cheap quotations differ from buildable ones
GlassGlass type and glazing method for any glazed sectionSafety glazing and hardware must match the use and the occupants
LightingWhether LED is included, driver location, switching, and who supplies electrical connection on siteIntegrated lighting needs a decision before panels are drilled
Wall interfaceScribe, skirting treatment and sash allowance for uneven walls and floorsOlder and renovated rooms rarely have square walls
Delivery and installationPackaging, container or pallet arrangement, delivery point, and who installsBuilt-ins need a lifting and access plan, especially in apartments

Buying direct from the manufacturer: what to expect

SANTERSON is a China-based furniture and building materials manufacturer offering custom and OEM work, so an Open & Closed Combo Unit is produced to your drawing rather than stocked. The cooperation steps published on the site run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up. That sequence means your inputs at the enquiry stage are what protect the budget.

Send a measured survey of the wall, photographs of the room, your equipment list, and a reference image or two showing the open-to-closed balance you want. If you are furnishing several rooms, ask about grouping the media units with other built-in furniture in one production run and one shipment, so consistent carcass material across rooms usually comes out cheaper than matching finishes after the fact.

For projects where several trades are involved, Interior Design Services covers space planning, furniture layouts and 3D renderings, plus drawing and production coordination with on-site guidance. A rendering of the media wall before production is the cheapest way to catch a bay that is too shallow or a screen that sits too high.

Freight, site readiness and handover

For overseas buyers the unit only counts as delivered when it arrives where it can be installed. The company describes freight forwarding by sea, air and rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery; logistics and door-to-door delivery is the service page to reference in your enquiry. Confirm Incoterms, the delivery point, insurance and who handles lifting into the apartment or villa level.

Before installation, make sure the wall is finished, the socket positions are fixed and tested, and any reinforcement behind the television position is complete. Installation, inspection with a snag list, spare parts and maintenance support are described on the installation and after-sales page; agree the scope and the access conditions in your order so the visit is not wasted.

Warranty terms, response times and regional installer arrangements vary by project and destination. Get them stated in the order documents rather than relying on marketing copy, and check what is excluded for imported built-ins.

A short due-diligence list

Before you confirm the order

  • Signed dimension drawing with every open bay and compartment labelled
  • Written material and finish schedule for carcass, doors, shelves and edges
  • Hardware specification: hinges, runners, soft close, handles or push-open
  • Cable routing, back-panel cut-outs and socket positions marked on the drawing
  • Lighting scope, driver location, switching, and who makes the electrical connection
  • Ventilation and clearance for any equipment inside a closed bay
  • Incoterms, delivery point, packaging plan and lifting arrangement
  • Installation scope, snag process, spare parts supply and warranty terms in writing

Related units worth comparing

If the wall needs a different balance of display and enclosure, two adjacent collections are worth pricing against the same drawing: Santerson Storage & Display Combo in the Media & TV Walls range leans towards display and full-wall systems, while Santerson Freestanding TV Cabinets suits rooms where the unit should stand clear of the wall and stay relocatable.

Send a drawing, get a buildable price

Share your measured wall, equipment list and preferred open-to-closed split, and the manufacturer can quote the configuration rather than a placeholder. Send the enquiry through the contact page; the site lists business hours as Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).

Product configuration, materials, hardware, freight terms and after-sales scope are confirmed per project. Figures and service descriptions above reflect what the manufacturer publishes and should be verified in your order documents.