A materials schedule that stops at cabinetry and flooring will not cover a living room feature wall, a library wall or a bedroom media unit. Those items sit in the joinery column, and if they are scheduled only as "built-in furniture" with no line item behind them, they come back later as a variation. This guide shows how to place Santerson Mixed Open & Closed Systems in a whole-project materials schedule so the item is priced once, specified once and delivered with the rest of the package.

Where this product belongs in the schedule

Mixed Open & Closed Systems is part of the Modular Living Systems range. The page describes it as a modular living system that combines open and closed elements, with finish, layout and dimensions specified for each space; the configuration lists made-to-measure sizing together with material and finish options.

In procurement terms it behaves like project joinery rather than loose furniture. It is measured to site, drawn for approval, produced in the factory and installed on site, so it belongs in the same work package as wardrobes, media walls and tall cabinets — not in the FF&E furniture lots that are ordered from catalogues.

One practical point before you schedule anything: this product name is close to two other entries on the site. Santerson Mixed Open & Closed Storage sits in the Integrated Storage Walls range, and Santerson Open & Closed Combo Units sits under TV cabinets and media units. All three mix open shelving with closed carcasses. Carry the exact product name and its page link in your schedule line, otherwise a quotation can come back against a different item.

A five-column format that survives tender

Whatever spreadsheet or scheduling software you use, each joinery line should carry the same five columns. Anything less and the item becomes unpriceable at bid stage.

ColumnWhat goes in it
Location and elevationRoom, wall reference and drawing number, so the unit is tied to a setting-out drawing rather than a room name alone.
Product identityExact product title plus the supplier page link. For this item: Santerson Mixed Open & Closed Systems, Modular Living Systems.
Open-to-closed intentWhich zones are open shelving or display niches and which are closed doors or drawers, and on which bays.
Finish referenceThe finish sample or code you have approved, not a colour word such as "grey" or "oak".
Status flagConfirmed, pending site survey, or pending approval — visible to everyone reading the schedule.

Setting the open-to-closed split before pricing

The commercial value of this product type is that the ratio of open shelving to closed doors is your decision, not a fixed specification. Decide it once and record it in the schedule.

  • Living and lounge walls. Open bays carry display pieces and books; closed bays hide media components, board games and anything you do not want on show. Keeping the lower bays closed and the eye-level bays open is the usual pattern.
  • Study and library walls. Open shelving at desk height for working references, with closed lower cabinets for files and stationery.
  • Bedroom media walls. Closed storage either side of the screen position, so the wall reads as joinery rather than as a shelf with a television in front of it.
  • Guest rooms and serviced apartments. More closed frontage keeps housekeeping simple; open bays are limited to one or two styled niches.

Record the split bay by bay. "Mostly open" is not a specification, and it is the phrase most often followed by a change order.

Coordinating finishes with flooring, wall panels and lighting

A mixed system spans a large area of wall and sits next to several other finishes at once. Treat it as part of the finish schedule, not as furniture that arrives later.

  • Flooring. Where the unit meets European Oak Engineered Wood Flooring or another engineered board, decide whether the carcass is scribed to the floor, sits on a plinth or floats above it. That detail changes both the drawing and the price.
  • Wall paneling. Where the system abuts Santerson Textured Panels or other Wall Panel Systems, fix which trade closes the junction and who supplies the trim.
  • Lighting. Open display bays usually need a lighting provision. If shelf lighting is intended, put it on the same schedule line as the unit and confirm the electrical point, driver location and switching before the wall is closed up.

The measurement step you cannot skip

Because sizing is made to measure, the schedule should show one status column for survey. A modular wall system specified from a drawn dimension and produced before a site check will meet out-of-square walls and inconsistent floor levels on site.

  1. Schedule the item early with nominal dimensions so it is priced in the tender.
  2. Confirm setting-out drawings and finish references with the design team.
  3. Take site measurements after wall finishes and floor levels are fixed.
  4. Issue the surveyed dimensions for shop drawings, then approve them before production starts.

Keep survey dates in the same programme as the other joinery packages. If wardrobes are surveyed but the living wall is not, the two packages will arrive out of sequence.

Grouping it with the rest of the package

Ordering this unit through a one-stop project furnishing supplier alongside the flooring, paneling and lighting that surround it reduces the number of separate deliveries, packing lists and installation visits on site. That matters most on villa and hospitality projects, where several fit-out trades are working in the same rooms at the same time.

SANTERSON is a China-based furniture and building materials manufacturer offering custom and OEM work, logistics with door-to-door delivery, installation and after-sales support. For multi-room schedules, group the modular living systems with the other built-in joinery in one enquiry, and keep loose furniture in a separate lot so pricing and lead times stay readable.

Schedule-ready summary for this line item: Santerson Mixed Open & Closed Systems — Modular Living Systems — made-to-measure sizing with material and finish options — open/closed split defined bay by bay — status pending site survey — coordinated with flooring, wall paneling and shelf lighting.

Common schedule errors to avoid

  • Naming drift. Writing "mixed open and closed cabinet" instead of the exact product title invites a quotation against the wrong page.
  • Colour words instead of finish codes. Two suppliers can read "light oak" differently; attach the approved sample reference.
  • Lighting left out. Open display bays with no electrical provision become a surface-mounted fix later.
  • No survey status. A made-to-measure item shown as confirmed before site measurement is an unmanaged risk on the programme.
  • Splitting one wall across two packages. Keep each continuous wall in one line and one order so the junctions are somebody's responsibility.

Confirming your configuration

Dimensions, storage layout, finish and any electrical provision for this product are confirmed per project against the approved shop drawings. Send your elevation references, target open-to-closed split and finish samples with the enquiry so the quotation comes back against the item you actually scheduled.

Product page: Santerson Mixed Open & Closed Systems. Specification, finish and installation details for your configuration are confirmed with the project team.